Forwards Insp Repts 50-237/98-14 & 50-249/98-14 on 980403- 0527.No Violations Noted.Unavailability of HPCI Sys Continued to Be Problem at Dresden During Insp Period
ML20236G996
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 06/26/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20236G997 List:
References
50-237-98-14, 50-249-98-14, NUDOCS 9807070040
Download: ML20236G996 (3)


See also: IR 05000237/1998014

Text

.---_-____ _ _ - - _ - _ - - - - - - - - - - - - - - - - _ - - - - - - - - - - - - - - - - - --

. *

y nooq UNITED STATES

[

fo NUCLEAR REGULATORY COMMISSION

[4

$

n REGION lli

_

l \ >

  • $ 801 WARRENVILLE ROAD

LISLE, ILLINOIS 60532-4351 \'

\.....p'* June 26, 1998

a

,

Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West 111

1400 Opus Place, Suite 500

Downers Grove, IL 60515 j

SUBJECT: DRESDEN INSPECTION REPORT 50-237/98014(DRP); 50-249/98014(DRP)

Dear Mr. Kingsley:

On April 3 through May 27,1998, the NRC performed an inspection of your Dresden Nuclear

Power Station. The enclosed report presents the results of this inspection.

During this inspection period, a safety-conscious approach characterized the overall conduct of

activities at the Dresden station. The operators generally performed well during one planned

reactor shutdown, two automatic and one manual reactor scrams, and five reactor startups.

However, multiple material condition deficiencies challenged the operators. For example, the

operators were required to scram the reactor in response to a loss of condenser vacuum caused

by a leaking cross-around relief valve.

The unavailability of the high pressure coolant injection (HPCI) system continued to be a problem

at Dresden during this inspection period. Operators twice declared the Unit 2 HPCI system 4

inoperable due to material condition failures. One of these failures involving the gland seal

leakoff condenser level switch has been a multiple, repeat failure with several occurrences over

the past year.

Continuing a theme documented in previous inspection reports, material condition failures and

deficiencies challenged and unnecessarily distracted the control room operators. In addition to

the reactor scram mentioned above, equipment problems caused difficulties in establishing a

cold shutdown condition, a loss of reactor feed pump ventilation during a reactor startup, and the

need for operators to establish attemate methods of reactor water level control following two

reactor scrams.

Continuing another theme from previous inspection reports, inadequately prepared procedures

and written instructions created adverse conditions that required station personnel to respond.

Examples included an automatic reactor scram due to an inadequate installation specification in -

' a modification, an unnecessary entry into a Technical Specification limiting condition for \1\ I

operation action statement due to poor electromatic relief valve surveillance instructions, and a

potential noncompliance with a license condition for main steamline radiation monitor alarms due

to another modification with incorrect specification .

\

4 Y

~

9807070040 900626

PDR ADOCK 05000237

G PDR ,

- _ _ _ _ _ _ - _ _ - - .

- _ _ - _ _ . _ _ _ - _ _ - _ _ - _ _ _ __ _ - _ _ ____ _ ___ _ _ ___ -

. ..

i

O. Kingsley -2-

'In accordance with 10 CFR 2.790 of the NRC's." Rules of Practice," a copy of this letter, the

enclosures, and your response will be placed in the NRC Public Document Room.

- Sincerely,

/s/ Marc L. Dapas for

Geoffrey E. Grant, Dire.ctor

Division of Reactor Pr>Jects

Docket Nos.: 50-237;50-249

License Nos.: DPR-19; DPR-25

' Enclosure: . inspection Report 50-237/98014(DRP);

50-249/98014(DRP) .i

cc w/ encl: M. Wallace, Senior Vice President

D. Helwig, Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory

Services Manager -

1. Johnson, Licensing Director

DCD - Licensing

M. Heffley, Site Vice President i

, P. Swafford, Station Manager I

F. Spangenberg, Regulatory Assurance

Manager

R. Hubbard i

N. Schloss, Economist l

~ Office of the Attomey General l

State Liaison Officer l

. Chairman, lilinois Commerce  !

Commission  ;

1

!

i

LDOCUMENT NAME: G:\DRES\DRE98014.DRP

1. . c c. . c. i - .u c . c... u.

r - m. v

OFFICE: Rlli ,_, lM Rill , l& Rlli l3l. -l

<. NAME RLorch:co I" * MRing /r47/--- GGrant///M)M

-

DATE 06/d/98 06/23/98 06/26198 ~

OFFICIAL RECORD COPY

o

<

..

. .

'

O. Kingsley -3-

Distribution:

SAR (E-Mail)

Project Mgr., NRR w/enci

C. Paperiello, R!li w/enci

J. Caldwell, Rlli w/enci

B. Clayton, Rlli w/enci

SRI Dresden w/enci

DRP w/ encl

TSS w/enci

DRS (2) w/enci

Rlli PRR w/ encl

PUBLIC IE-01 w/enci

Docket File w/enci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)