Forwards Monthly Operating Repts for Dec 1998 for Dnps,Units 1,2 & 3,as Required by TS 6.9.A.5.Year-to-date Generator Hours for Unit 2 for Oct 1998 & Nov 1998 Corrected in Rept
ML20199C885
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 01/11/1999
From: Heffley J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199C888 List:
References
RTR-REGGD-01.016, RTR-REGGD-1.016 GL-97-02, GL-97-2, JMHLTR:#99-0003, JMHLTR:#99-3, NUDOCS 9901190180
Download: ML20199C885 (1)


Text

-__- -__.______-

,. Onnnwnweahh Ediwn Company

. Dresden Generating Station

)

6500 North Dresten Road

  • Morris, IL NH$0 Tel HI5 942-2920 January 11,1999 JMHLTR: #99-0003' U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Monthly Operating Data Repon for December 1998 Dresden Nuclear Powe. Ct ation Commonwealth Edison Company Docket Nos.50-010,50-237, and 50-249 Enclosed is the Dresden Nuclear Power Station Monthly Operating Summary Report for December 1998.

This information is supplied to your omce as required by Technical Specification 6.9. A.5, in accordance with the instructions set forth in Regulatory Guide 1.16. and Generic Letter 97-02.

The year-to-date generator hours for Unit 2 was wrrected in this report. The correct year-to-date generator hours for Unit 2 are 6,031 hours3.587963e-4 days <br />0.00861 hours <br />5.125661e-5 weeks <br />1.17955e-5 months <br /> for October 1998 and 6,776 hours0.00898 days <br />0.216 hours <br />0.00128 weeks <br />2.95268e-4 months <br /> for November 1998.

Sincerely,

. Hef1 Vice Pres ent Dresden Nuclea 'er Station Enclosure cc: NRC Region Ill Omce Illinois Dept. of Nuclear Safety, State ofIllinois NRC Senior Resident Inspector, Dresden Nuclear Power Station ,

UDI, Inc. - Washington, DC File /Numen, cal g l

9901190180 990111 U i

PDR ADOCK 05000010 R PDR d

.A Unicom Onnpany i .- .

_ _ _ _ _ _ _ _ _