ML20149G526
| ML20149G526 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Byron, Braidwood, Quad Cities, Zion, LaSalle, 05000000 |
| Issue date: | 02/12/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Holyoak R COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 8802180292 | |
| Download: ML20149G526 (3) | |
Text
_ - _ _ _ _ _
v r
FEB 12 1988
,i s
i Docket No. 50-456, Docket No. 50-457 Docket fio. 50-454, Docket No. 50-455 Docket No. 50-10 Docket No. 50-227 Docket No. 50-249, Docket No. 50-373 Docket No. 50-374, Docket No. 50-254 Docket No. 50-265, Docket No. 50-295 Docket No. 50-304 Comonwealth Edison Company ATTN: Mr. Robert Holyoak Production Training Manager Production Training Center Wilingon I
$4 f
Gentlemen:
In anticipation of the resumption of requalification testing later this year I felt that it might be helpful to you to have a copy of the pilot requalifi-cation exam given at H. B. Robinson.
You will note that the style of the questions is considerably different then in the past as they are intended to be open book type questions. As I 1
indicated at the last MNTA meeting, the responsibility for generating the questions now rests with each utility.
Estimates of the time necessary to i
assemble the H. B. Robinson exam ranged from 35 to 45 person weeks (NRC plus i
utility). Given this level of resource expenditure I encourage you to begin reviewing your programs and manpower comitments, to accommodate the effort necessary to generate appropriate questions for use on upcoming requalification exams.
$$$**S0$$SSkA V
b l
l
?
l
g.
FE812 1988 Commonwealth Edison 2
If you have any questions please ccrita.t either myself (312/790-5695) or
-Thomas M. Burdick (312/790-5566).
Sincerely,
, ORIGINAL SIGNED BY. GE0ffREY C. )VRIGN.I.
Geoffrey C. Wright, Chief Operas.lons ';d r'anch
Enclosures:
1.
H. G. Robinson Requalification Exam 2.
Sample Exam cc w/ enclosure:
Resident Insp.ctor, RIII Braidwood Resident Inspector, RIII Byron Resident Inspector, RIII Dresden Resident Inspector, RIII LaSalle Resident Inspector, RIII Quad Cities Resident Inspector, RIII Zion See Attached Distribetion s
RI!!
RI!!
RIII RIII
/W i's t/mc 6 9 4 14s^ChrJsseti4s'
w FEB 1: ISSa
.s'*
a.
Comonwealth Edison Company 3
Distribution cc'w/o enclosure:
Cordell Reed Senior Vice President T. J. Maiman, Vice President, PWR Operations D. Butterfield, Nuclear Licensing Manager M. Wallace, Manager of Projects D. Shamblin, Project. Manager W. Yahle, Construction Superintendent R. E. Querio, Plant Manager J. Eenigenburg, Plant Manager G. J. Ciederich, Plant Manager R. L. Bax, Plant Manager G. J. Plimi, Station Manager E. E. Fi',zpatrick, Station Manager P. L. Barnes, Regulatory DCD/DCB (RIDS)pervisor Assurance Su Licensing Fee Management Branch D. W. Cassel, Jr., Esq.
Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division H. S. Taylor, Quality Assurance Division Diane Chavez DAARE/ SAFE David Rosenblatt, Governor's Office of Consumer Services Mayor, City of Zion E. Chan, OGC G. Berry. 0GC J. S'av sns, NRR L. Olshan, NRR LPM Jan Norris, Project Manager, NRR The Honorable A. Dixon Callihan, ASLB s
The Honorable Richard F. Cole ASLB The Honorable hin W. Smith, ASLB The Honorable Gr.ry J Edles, ASLAP The Honorable Dr. W. Reed Johnson, ASLAP s
The Honorable Christine N. Kohl, ASLAP i
/
s
,,.vr,
L j
U. S.
Nuclear Regulatory Commissio, Document Control System j
Index record data ~ entry cr change DTC:CLNTU AA1: NE R3 DIN: 88021' RA1:EUTLEIL SN:
3 s.
Author: Af fil.
Name(Last F M)
Req ip: AFfil).
Name(Last F M)
Nbr Pages:
1.NE R3 WR I GHT, G.<C.
1.EUTCEIL' HOLYOAK,R.
3pp.
+/
2.
Size:
2.
3.
A4 3.
)
Date Issued:88/02/12 Ind e x ed: 38/02/1H Availab ili ty: PDR LPDR:Y Security:
/
Docket date:
/
/
Docket 4t ' s ; t't ) O " 6 0 0 0 0 0 (2)G5000010 (3)0 BOD 0237
( 4 ) 0 $'DUOktir ( 5 ) 05000254 (6)O5000265 (7)0500?av3 (8)C5000304 (9)05000373 (10)O$000374(L1)05000454(12)O5000455 (17)05030456(14105000457(15)
Ac c essi an #:8802180292 Contract Sales Av1: NRC Task 4.__
Lcn g ua g e :
(A h r, doc. ud #:
Bf t: _
t
/
I m nn v
\\
s w
\\
T I TLE
/
DESCR I P i T, ON F :;u Ard s pilot requalification exam perfresumption of rtTualification testing later id 1988. Encourage naview of p r o,g,r a n s !< manp ower commitments to accommodace effort
/.
necessary to generate appropriate ebestions.W/o encl >
\\
~
File Locations / Levels
- +
File Pkg N o !'
P19 c r o f i l m ' a d d r e s s PDR ADOCK 05000010 V /
680212 8(O2180292_u
- <% ARMS ****
880212 End:
s' PDR ADOCK 05000254 V/
880212 j
PDR ADOCK 05000265 V V 880212 f
- /
PDR ADOCF 05000295 V v' 880212 PDR ADOCK 05000304 V %
880212 PDR ADGCK 05000373 V V 880212 s
,~,
.??OCK 05000374 V r-880212 e'
y PDF 400CK 05000454 V 880212 g
PDR ADOCK 05000455 V yr 880212
'4
'I PDR ADOCK 05000456 V v,
880212 PDR ADOCK 05000457 V v/
880212 s
Formal Report No.
Admin: 1PMJ Sup: Y '
Distribution. List #: IE42D Dat e: 88/02/18 Other MF adr:
24X: _
' ' s.
e,e
/
m