| | issue date = 06/04/2014 | | | issue date = 06/04/2014 |
| | title = Public Meeting Summary - Turkey Point Nuclear Generating Station Docket Nos. 50-250 and 50-251 | | | title = Public Meeting Summary - Turkey Point Nuclear Generating Station Docket Nos. 50-250 and 50-251 |
| | author name = Sandal S R | | | author name = Sandal S |
| | author affiliation = NRC/RGN-II/DRP/RPB3 | | | author affiliation = NRC/RGN-II/DRP/RPB3 |
| | addressee name = Rich D W | | | addressee name = Rich D |
| | addressee affiliation = NRC/RGN-II/DRP/RPB3 | | | addressee affiliation = NRC/RGN-II/DRP/RPB3 |
| | docket = 05000250, 05000251 | | | docket = 05000250, 05000251 |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 4, 2014 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 4, 2014 MEMORANDUM TO: Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects FROM: Shane Sandal /RA/ |
| | | Senior Project Engineer Reactor Projects Branch 3 |
| MEMORANDUM TO: Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects FROM: Shane Sandal | |
| /RA/ Senior Project Engineer Reactor Projects Branch 3 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
Line 24: |
Line 22: |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| - TURKEY POINT NUCLEAR GENERATING STATION DOCKET NOS. 50-250 AND 50-251 On May 21, 2014, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of Turkey Point Nuclear Generating Station, Units 3 and 4. The purpose of the meeting was to provide opportunities to discuss the annual assessment of Turkey Point with the public for the period of January 1, 2013, through December 31, 2013. Enclosed is a list of attendees and the Turkey Point annual assessment meeting presentation. | | - TURKEY POINT NUCLEAR GENERATING STATION DOCKET NOS. 50-250 AND 50-251 On May 21, 2014, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of Turkey Point Nuclear Generating Station, Units 3 and 4. The purpose of the meeting was to provide opportunities to discuss the annual assessment of Turkey Point with the public for the period of January 1, 2013, through December 31, 2013. Enclosed is a list of attendees and the Turkey Point annual assessment meeting presentation. |
| | The following Region 2 and Headquarters NRC staff attended the public meeting: |
| | Mark Lesser, Deputy Director, Division of Reactor Projects Daniel Rich, Chief, Reactor Projects Branch 3, Division of Reactor Projects Tim Hoeg, Senior Resident Inspector, Turkey Point Audrey Klett, Project Manager, Division of Operating Reactor Licensing Marlen Rodriguez, Site Administrative Assistant, Turkey Point Docket Nos.: 50-250 and 50-251 License No.: DPR-31, DPR-41 |
|
| |
|
| The following Region 2 and Headquarters NRC staff attended the public meeting:
| | ==Enclosures:== |
| | | : 1. List of Attendees |
| Mark Lesser, Deputy Director, Division of Reactor Projects Daniel Rich, Chief, Reactor Projects Branch 3, Division of Reactor Projects Tim Hoeg, Senior Resident Inspector, Turkey Point Audrey Klett, Project Manager, Division of Operating Reactor Licensing Marlen Rodriguez, Site Administrative Assistant, Turkey Point
| | : 2. Meeting Presentation |
|
| |
|
| Docket Nos.: 50-250 and 50-251 License No.: DPR-31, DPR-41
| | _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE SRS5 /RA/ DWR1 /RA/ |
| | NAME SSandal DRich DATE 6/4/2014 6/4/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Turkey Point Units 3 and 4 Annual Assessment Meeting 2013 Performance Assessment Nuclear Regulatory Commission - Region 2 Enclosure 2 |
|
| |
|
| ==Enclosures:==
| | NRC Organization |
| : 1. List of Attendees
| | * 5 member Commission led by the Chairman |
| : 2. Meeting Presentation | | * Commissioners serve five-year terms |
| | * ~4000 employees with ~$1 billion budget |
| | * Headquarters in Rockville, Maryland |
| | * Four regional offices: |
| | Region I, Philadelphia, Pennsylvania Region II, Atlanta, Georgia Region III, Lisle, Illinois Region IV, Arlington, Texas Enclosure 2 |
|
| |
|
| _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE SRS5 /RA/ DWR1 /RA/ NAME SSandal DRich DATE 6/4/2014 6/4/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure 1 Enclosure 2 Turkey Point Units 3 and 4Annual Assessment Meeting2013 Performance AssessmentNuclear Regulatory Commission -Region 2
| | NRC Strategic Plan Goals |
| | * Safety - Ensure adequate protection of public health and safety and the environment |
| | * Security - Ensure adequate protection in the secure use and management of radioactive materials Enclosure 2 |
|
| |
|
| Enclosure 2 NRC Organization*5 member Commission led by the Chairman*Commissioners serve five-year terms
| | Our Mission To license and regulate the nations civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment. |
| *~4000 employees with ~$1 billion budget
| | Enclosure 2 |
| *Headquarters in Rockville, Maryland
| |
| *Four regional offices:Region I, Philadelphia, PennsylvaniaRegion II, Atlanta, GeorgiaRegion III, Lisle, IllinoisRegion IV, Arlington, Texas
| |
|
| |
|
| Enclosure 2 NRC Strategic Plan Goals*Safety-Ensure adequate protection of public health and safety and the environment
| | Reactor Oversight Process Strategic Perform an ce Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Significance Threshold Threshold Threshold Action Matrix Regulatory Response Enclosure 2 |
| *Security-Ensure adequate protection in the secure use and management of radioactive materials Enclosure 2 Our MissionTo license and regulate the nation's civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
| |
|
| |
|
| Enclosure 2 Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas | | Areas and Cornerstones REACTOR OVERSIGHT FRAMEWORK MISSION: |
| | Protect Public Health And Safety in the Use of Nuclear Power KEY AREAS: |
| | Reactor Safety Radiation Safety Safeguards CORNERSTONES: |
| | Initiating Mitigating Barrier Emergency Public Occupational Physical Events systems Integrity Preparedness Radiation Radiation Protection CROSS-CUTTING AREAS: Human Performance Safety Conscious Work Problem Identification and Environment Resolution Enclosure 2 |
|
| |
|
| Enclosure 2 REACTOR OVERSIGHT FRAMEWORK MISSION: KEY AREAS: CORNERSTONES: CROSS-CUTTINGAREAS:Areas and CornerstonesProtect Public Health And Safety in the Use of Nuclear PowerReactorSafetyRadiationSafetySafeguardsInitiatingEventsMitigatingsystemsBarrierIntegrit yEmergencyPreparednessPublicRadiationOccupationalRadiationPhysical ProtectionHumanPerformanceSafetyConscious Work EnvironmentProblemIdentification and Resolution | | Performance Indicators Objective data to monitor plant performance Use established thresholds that are predictable Crossing thresholds indicate a change in safety margin Enclosure 2 |
|
| |
|
| Enclosure 2 Performance IndicatorsObjective data to monitor plant performanceUse established thresholds that are predictable Crossing thresholds indicate a change in safety margin
| | Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue Enclosure 2 |
|
| |
|
| Enclosure 2 Significance ThresholdGreenBaseline InspectionWhiteRequires additional NRC oversightYellowRequires more NRC oversightRedRequires most NRC oversightPerformance IndicatorsInspection FindingsGreenVery low safety issueWhiteLow to moderate safety issueYellowSubstantial safety issueRedHigh safety issue
| | Action Matrix Concept Multiple/Rep Licensee Regulatory Degraded Unacceptable Degraded Response Response Cornerstone Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Enclosure 2 |
|
| |
|
| Enclosure 2 Action Matrix ConceptIncreasing Safety SignificanceIncreasing NRC Inspection Efforts Increasing NRC/Licensee Management InvolvementIncreasing Regulatory ActionsLicensee ResponseRegulatory Response Degraded Cornerstone Multiple/Rep Degraded Cornerstone Unacceptable Performance
| | NRC Annual Assessment Summary Turkey Point Unit 3 and Unit 4 Florida Power & Light operated the plant safely and in a manner that preserved the public health and safety and protected the environment. |
| | Turkey Point Unit 3 was in the Regulatory Response Column of the Action Matrix for the entire 2013 assessment period. |
| | Turkey Point Unit 4 was in the Licensee Response Column of the Action Matrix for the entire 2013 assessment period. |
| | Enclosure 2 |
|
| |
|
| Enclosure 2 NRC Annual Assessment SummaryFlorida Power & Light operated the plant safely and in a manner that preserved the public health and safety and protected the environment.Turkey Point Unit 3 was in the Regulatory Response Column of the Action Matrix for the entire 2013 assessment period.Turkey Point Unit 4 was in the Licensee Response Column of the Action Matrix for the entire 2013 assessment period.Turkey Point Unit 3 and Unit 4
| | NRC Annual Assessment Summary Turkey Point Unit 3 Performance Indicators Turkey Point Unit 3 was in the Regulatory Response Column for all 4 quarters of the 2013 assessment period due to reactor trips that caused the Unplanned Scrams per 7,000 Critical Hours indicator to be in the White performance band. |
| | Enclosure 2 |
|
| |
|
| Enclosure 2 NRC Annual Assessment SummaryTurkey Point Unit 3 was in the Regulatory Response Column for all 4 quarters of the 2013 assessment period due to reactor trips that caused the Unplanned Scrams per 7,000 Critical Hours indicator to be in the White performance | | Summary of Plant Performance Licensee Response 80 Regulatory Response 9 Degraded Cornerstone 9 Multiple/Repetitive Deg. Cornerstone 1 Unacceptable (IMC 0350) 1 Total 100 Enclosure 2 |
|
| |
|
| band.Turkey Point Unit 3 Performance Indicators
| | Information on the Fukushima Accident |
| | * Actions in response to Fukushima Accident: http://www.nrc.gov/reactors/operating/ |
| | ops-experience/japan-dashboard.html |
| | * Mailbox for comments on staff actions: |
| | JLD_Public.Resource@nrc.gov |
| | * Office of Public Affairs Point of |
|
| |
|
| Enclosure 2 Summary of Plant PerformanceLicensee Response 80Regulatory Response 9 Degraded Cornerstone 9 Multiple/Repetitive Deg. Cornerstone1 Unacceptable (IMC 0350)1 Total100 Enclosure 2 Information on the Fukushima Accident*Actions in response to Fukushima Accident: http://www.nrc.gov/reactors/operating/ops-experience/japan-dashboard.html*Mailbox for comments on staff actions: JLD_Public.Resource@nrc.gov*Office of Public Affairs Point of Contact: OPA.resource@nrc.gov or 301-415-8200
| | ==Contact:== |
| | OPA.resource@nrc.gov or 301-415-8200 Enclosure 2 |
|
| |
|
| Enclosure 2 NRC Social Media Channels*Blog:http://public-blog.nrc-gateway.gov/*Flickr:http://www.flickr.com/photos/nrcgov/*Twitter:https://twitter.com/#!/nrcgov*YouTube: http://www.youtube.com/user/NRCgov*RSS:http://www.nrc.gov/public-involve/listserver.html#rss
| | NRC Social Media Channels |
| | * Blog: http://public-blog.nrc-gateway.gov/ |
| | * Flickr: http://www.flickr.com/photos/nrcgov/ |
| | * Twitter: https://twitter.com/#!/nrcgov |
| | * YouTube: http://www.youtube.com/user/NRCgov |
| | * RSS: http://www.nrc.gov/public-involve/listserver.html#rss Enclosure 2 |
|
| |
|
| Enclosure 2 QUESTIONS}} | | QUESTIONS Enclosure 2}} |
|
---|
Category:Meeting Summary
MONTHYEARML24128A2102024-05-0707 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting Regarding Saint Lucie ML23276A1852023-09-25025 September 2023 Subsequent License Renewal Draft EIS Public Meetings: Meeting Summary ML23221A3782023-08-16016 August 2023 Summary of Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Transition to a 24-Month Fuel Cycle ML23166A0042023-06-15015 June 2023 Summary of Meeting Concerning 2023 Annual Assessment of the Saint Lucie and the Turkey Point Nuclear Plants ML23087A0692023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 ML23058A4262023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML23108A2752023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 ML23068A0712023-04-28028 April 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 (EPID L-2022-LLA-0105) - Nonproprietary ML23107A2312023-04-18018 April 2023 Summary Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23081A5022023-03-28028 March 2023 Summary of Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Transition to a 24-Month Fuel Cycle ML23069A0282023-03-15015 March 2023 Summary of January 31, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23066A0872023-03-15015 March 2023 Summary of Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23044A4172023-03-0606 March 2023 Summary of January 17, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23048A0492023-03-0303 March 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML22357A0742023-01-19019 January 2023 Summary of December 1, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests ML22349A0012023-01-0505 January 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML22327A2402022-12-0808 December 2022 Summary of October 27, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests ML22276A2302022-10-0606 October 2022 Summary of September 13, 2022, Public Meeting with FPL Concerning Supplemental Information Needed for Acceptance of License Amendment Request to Replace Instrumentation with Digital Systems on Turkey Point, Units 3 and 4 ML22144A0022022-09-14014 September 2022 Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency Plan ML22238A2762022-08-29029 August 2022 Summary of August 17, 2022, Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker ML22229A5252022-08-24024 August 2022 Summary of August 11, 2022, Mtg. with Florida Power & Light/Nextera on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Request (EPIDs L-2021-LLI-0000 & -0002) ML22228A2352022-08-23023 August 2022 Summary of July 28, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22228A2032022-08-22022 August 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22195A1752022-07-27027 July 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22186A0812022-07-15015 July 2022 Summary of June 22, 2022, Partially Closed Meeting with Florida Power and Light to Discuss Planned License Amendment Request Related to Fire Protection Program Changes ML22167A1852022-06-30030 June 2022 Summary of June 6, 2022, Meeting with Duke Energy to Discuss Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI) 191 ML22160A3792022-06-30030 June 2022 Summary of May 24, 2022, Closed Meeting with Florida Power and Light to Discuss Planned License Amendment Request Related to Reactor Coolant Pump Seal Replacements ML22154A5202022-06-0909 June 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22154A5112022-06-0707 June 2022 Summary of May 19, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22145A3932022-05-25025 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting 20220434 ML22137A2512022-05-19019 May 2022 Summary of Pre-Application Meeting with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 ML22129A1812022-05-11011 May 2022 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 ML22118A3582022-05-10010 May 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22089A1382022-04-0505 April 2022 Summary of March 24, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22066A7852022-03-23023 March 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22070A5632022-03-21021 March 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22054A0082022-03-0303 March 2022 Summary of February 17, 2022, Partially Closed Meeting with Florida Power and Light to Discuss Intake Cooling Water Discharge Piping Proposed Alternative ML22020A4032022-02-0707 February 2022 Summary of November 17, 2021, Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests (EPIDs L-2021-LLI-0000 and L-2021-LLI-0002) ML21342A3752022-01-0606 January 2022 Summary of Meeting with Florida Power and Light/Nextera on Proposed Improved Technical Specification Conversions ML21327A1802021-12-0707 December 2021 Summary of August 25, 2021 Observation Public Meeting with FPL to Discuss Proposed Alternative Report for the Intake Cooling Water System ML21246A0212021-11-23023 November 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point Units 3 and 4 ML21279A0432021-10-15015 October 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 ML21285A0412021-10-13013 October 2021 Summary of September 29, 2021 Meeting with the U.S. Fish and Wildlife Service Regarding Crocodile Monitoring at Turkey Point ML21190A1862021-08-0202 August 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point Units 3 and 4 ML21176A0102021-06-29029 June 2021 Summary of Drop-in Meeting with NextEra-Florida Power and Light to Discuss Pending Submittals Related to Digital Instrumentation and Controls and Improved Standard Technical Specifications for Turkey Point Nuclear Plant, Units 3 & 4 (EPID L ML21159A1352021-06-0808 June 2021 Public Meeting Summary Regarding the Saint Lucie Nuclear Plant, Units 1 and 2, Docket No. 50-335 and 389, and the Turkey Point Nuclear Generating Station Units 3 and 4, Docket No. 50-250 and 50-251; Meeting Number 20210505 ML21158A0582021-06-0707 June 2021 Summary of May 20, 2021, Teleconference with the Florida Power & Light Company Regarding Endangered and Threatened Species Reporting at Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML21158A0572021-06-0707 June 2021 Summary of May 3, 2021, Teleconference with the U.S. Fish and Wildlife Service and Florida Power & Light Company Regarding Injured American Crocodile at Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML21092A1022021-04-13013 April 2021 Summary of Pre-Application Meeting to Discuss Planned License Amendments Regarding Conversion to Improved Technical Specifications for the Turkey Point Nuclear Generating, Unit Nos.3 and 4 and St. Lucie Plant, Unit Nos. 1 and 2 Facilities 2024-05-07
[Table view] Category:Memoranda
MONTHYEARML24128A2102024-05-0707 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting Regarding Saint Lucie ML23166A0042023-06-15015 June 2023 Summary of Meeting Concerning 2023 Annual Assessment of the Saint Lucie and the Turkey Point Nuclear Plants ML22276A2302022-10-0606 October 2022 Summary of September 13, 2022, Public Meeting with FPL Concerning Supplemental Information Needed for Acceptance of License Amendment Request to Replace Instrumentation with Digital Systems on Turkey Point, Units 3 and 4 ML22238A3142022-08-0707 August 2022 Documentation of Approval for Longer Review Period for Turkey Point Digital Instrumentation and Control License Amendment Requests Acceptance Review ML22145A3932022-05-25025 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting 20220434 ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21159A1352021-06-0808 June 2021 Public Meeting Summary Regarding the Saint Lucie Nuclear Plant, Units 1 and 2, Docket No. 50-335 and 389, and the Turkey Point Nuclear Generating Station Units 3 and 4, Docket No. 50-250 and 50-251; Meeting Number 20210505 ML20315A2642020-12-14014 December 2020 November 5, 2020, Summary of Drop-In Meeting with Nextera-Florida Power and Light to Discuss Pending Submittals Related to Digital Instrumentation and Controls and Improved Standard Technical Specifications ML20150A4732020-05-29029 May 2020 EOC Meeting Summary ML19330G0542019-11-22022 November 2019 Reconciliation - Analysis of EDO Response to ACRS Ltr - Response to ACRS Report on the Safety Aspects of the SLR Application of the Turkey Point Nuclear Generating Units 3 & 4 - December 2019 Fc Meeting ML19121A6072019-05-0101 May 2019 Summary of Public Meeting with Turkey Point Nuclear Plant to Discuss Annual Assessment of the Turkey Point Nuclear Plant with Public for Period of January 1, 2018 - December 31, 2018 ML18360A4452018-12-26026 December 2018 06/18/18 Summary of Interagency Meeting Related to Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML18221A2652018-08-0909 August 2018 Referral Memorandum from the Secretary to the Atomic Safety and Licensing Board Panel ML18144A1242018-05-24024 May 2018 Summary of Public Meeting Concerning Annual Assessment of Turkey Point Nuclear Generating Station Unit 3 and Unit 4, for Period of January 1, 2017 December 31, 2017 ML18074A2522018-04-12012 April 2018 Status of Subsequent License Renewal Application ML17082A5102017-04-0606 April 2017 Verbal Authorization of Relief Request No. 5 for Repair of High Head Safety Injection Recirculation Test Line - Fifth 10-Year Inservice Inspection Interval ML18187A0332016-07-19019 July 2016 County Resolution to Seek a Commitment from FPL to Discontinue Use of the Cooling Canal System at the Turkey Point Power Plant ML16097A1402016-04-0404 April 2016 March 30, 2016, Summary of Public Meeting Turkey Point Nuclear Plant ML23333A0162016-03-0707 March 2016 Att H - MDC Report on Biscayne Bay Wq at Turkey Point CCS (March 4, 2016)-1 ML15222A5332015-08-10010 August 2015 Regulatory Audit in Support of Relief Request 1, Revised, for Fifth Ten-Year Inservice Inspection Interval ML14156A2212014-06-0404 June 2014 Public Meeting Summary - Turkey Point Nuclear Generating Station Docket Nos. 50-250 and 50-251 ML12222A0392012-08-0909 August 2012 8/16/2012 Cancellation Notice of Forthcoming Conference Call with NextEra Energy and Florida Power and Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Proto ML12213A0612012-08-0101 August 2012 8/16/12 Forthcoming Conference Call with NextEra Energy and Florida Power & Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol ML1117101092011-06-22022 June 2011 Independent Spent Fuel Storage Installation Physical Security Plan and Verification of ASM Incorporation ML11160A0482011-06-10010 June 2011 Notice of Forthcoming Meeting with Florida Power & Light, to Discuss Turkey Point Extended Power Uprate License Amendment Request Currently Under Review ML1107405982011-03-16016 March 2011 Notice of Forthcoming Meeting with Florida Power & Light, Turkey Point, Units 3 & 4, to Discuss Extended Power Uprate License Amendment Request That Is Currently Under Review ML1106104272011-03-0707 March 2011 Notice of Forthcoming Pre-Application Meeting with Florida Power & Light Company and NextEra Energy Regarding Turkey Point, Units 3 and 4, St. Lucie, Units 1 and 2, Point Beach, Units 1, and 2, and Duane Arnold ML1100704852011-02-0404 February 2011 Close-out of National Fire Protection Association Frequently Asked 07-0030 on Establishing Recovery Actions ML1031205002010-11-10010 November 2010 Notice of Forthcoming Teleconference with Florida Power & Light to Discuss Differences Between the Turkey Point Spent Fuel Pool Criticality Analysis License Amendment Request Currently Under Review & Draft Division of Safety Systems Interim ML1030502252010-11-0505 November 2010 Verbal Authorization of Relief Request No. 9, Visual Examination of Containment Liner Repair ML1030100892010-11-0505 November 2010 Verbal Authorization of Relief Request No. 8, Transfer Canal Drain Line Piping Repairs ML1025601362010-09-0707 September 2010 Notice of Meeting with Florida Power & Light Company to Discuss the Florida Power & Light Company'S Forthcoming Applications for the Extended Power Uprates of St. Lucie Units 1 & 2 and Turkey Point Units 3 & 4, Focusing on the Topic of Spen ML1019405202010-07-14014 July 2010 Notice of Conference Call with Florida Power and Light Company to Discuss Draft Responses to NRC Requests for Additional Information for Generic Letter 2004-02 ML1018806202010-07-0808 July 2010 Notice of Forthcoming Meeting with Florida Power & Light, to Discuss with Representatives of Florida Power & Light Company (FPL) the Turkey Point, Units 3 and 4 Proposed Extended Power Uprate License Amendment Request ML1016704282010-06-17017 June 2010 Meeting Summary Notice ML1014501902010-05-26026 May 2010 Notice of Meeting with Florida Power & Light to Discuss the Turkey Point Alternative Source Term License Amendment Request That Is Currently Under Review ML1009105332010-04-0505 April 2010 U.S. Nuclear Regulatory Commission Staff Review of the Department of Homeland Security Consultation Reports ML1001900112010-01-19019 January 2010 Notice of Conference Call with Florida Power & Light Concerning Turkey Point Generic Letter 2004-02 Response ML1000800922010-01-0808 January 2010 Notice of Meeting with Florida Power & Light - Turkey Point Units 3 and 4, to Discuss Proposed License Amendment Request to Update Turkey Point Unit 3 Spent Fuel Pool Licensing Basis ML0934911442009-12-16016 December 2009 Summary of Category 2 Public Meeting with Nuclear Energy Institute to Discuss Health Physics Issues for New Reactors ML0925404602009-09-10010 September 2009 Summary of Phone Call with Industry to Issues Related to Eccentricity of the Steam Generator Tube-to-Tubesheet Joints in the Finite Element Model Used for the Technical Basis of the Permanent Alternate Repair Criteria License Amendment Requ ML0921805182009-08-0606 August 2009 Notice of Public Meeting with Florida Power & Light Energy IR 05000250/20090032009-07-30030 July 2009 IR 05000250-09-003, 05000251-09-003, on 04/01/2009 - 06/30/2009; Turkey Point Nuclear Power Plant, Units 3 and 4; Equipment Alignment, Fire Protection, Maintenance Effectiveness, Plant Modifications, Refueling and Other Outage Activities ML0910302212009-04-13013 April 2009 Meeting Notice, Meeting with Florida Power & Light Company Turkey Point Nuclear Plant, Units 3 and 4 ML0832502332008-12-0202 December 2008 Summary of Public Meeting with Operators of Vogtle Units 1 & 2, San Onofre Units 2 & 3, St. Lucie Unit 1, Turkey Point Unit 3, Indian Point Units 2 & 3, Nuclear Energy Institute, and Alion Science and Technology ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0706400412007-03-0606 March 2007 Commitment Lists for Renewed Operating License (ROL) Plants with No Commitment Appendix Attached to Its ROL Sers/Nuregs for Use with IP-71003 ML0617805592006-07-10010 July 2006 Revised Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. ML0614505922006-05-26026 May 2006 Wits 200600198 - Actions to Be Taken in Response to Hurricane Lessons Learned Task Report ML0518904892005-07-14014 July 2005 Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. 2024-05-07
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24103A1042024-04-25025 April 2024 St. Lucie/Turkey Point 2023 Annual Assessment Meeting Slides ML24073A3372024-03-13013 March 2024 NextEra - NRC Slides for the Public Meeting on March 19, 2024 Regarding Emergency Plan Licensing Amendment ML23258A0262023-09-15015 September 2023 September 2023 Dseis Public Meeting - In-person Meeting Slides ML23258A0272023-09-15015 September 2023 September 2023 Dseis Public Meeting - Virtual Meeting Slides ML23177A0812023-06-28028 June 2023 Nd Pre-Submittal Meeting Regarding License Amendment Requests for Transition to 24-Month Fuel Cycles ML23124A3412023-05-0404 May 2023 FPL 2022 Public Meeting Slides ML22336A0262022-12-0707 December 2022 December 7 2022 24-Month Fuel Cycle Public Meeting Licensee Slides ML22251A1732022-09-0808 September 2022 Staff Presentation Slides for Turkey Point Di&C LAR Acceptance Review Public Meeting, September 13, 2022 ML22227A1302022-08-17017 August 2022 License Amendment Request Reactor Trip Breaker Completion Time Extension - Public Meeting August 17, 2022 (EPID L-2022-LRM-0061) (Slides) ML22172A2172022-06-22022 June 2022 LAR: Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) ML22144A3902022-05-24024 May 2022 RCP Seal Solutions - May 24 2022 Slide Material (Public) ML22110A2172022-05-0303 May 2022 Annual Assessment Meeting ML22111A1782022-04-26026 April 2022 April 26, 2022 Public Meeting on Reactor Coolant Pump Seal Replacement - Florida Power and Light Slides ML22098A0932022-04-13013 April 2022 Nextera/Fpl Redacted Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (Public Version) ML22098A0902022-04-13013 April 2022 Nextera/Fpl Non-Proprietary Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (EPID L-2021-LRM-0007) (Slides) ML22101A2262022-04-11011 April 2022 NRC Staff Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request ML22063A1262022-03-0404 March 2022 Nextera/Fpl Presentation for March 7, 2022 Public Meeting Between NRC and Florida Power & Light Company to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 4 ML22054A1662022-02-23023 February 2022 ITS Public Meeting Material - NRC - Expectations for Licensee'S Responses to ITS Conversion LAR and RAIs ML22046A0462022-02-15015 February 2022 Icw Relief Request 10 Public Meeting Licensee Presentation ML22032A0022022-02-0202 February 2022 2/2/22 Slides Considerations for the Potential Use of a Multi-Stage Validation Approach to Support to Nuclear Power Plant Control Room Modifications Discussion of Concepts and NRC Licensing Considerations ML21285A0412021-10-13013 October 2021 Summary of September 29, 2021 Meeting with the U.S. Fish and Wildlife Service Regarding Crocodile Monitoring at Turkey Point ML21237A0092021-08-25025 August 2021 August 25, 2021 - Nextera/Fpl Presentation Slides for Public Meeting Concerning Proposed Alternative Repair to Unit 3 CCW Discharge Line ML21235A0932021-08-23023 August 2021 Licensee'S Non-Proprietary Presentation (1 of 2) for August 23 and 25, 2021 Public Meeting ML21232A0172021-08-20020 August 2021 Licensee'S Non-Proprietary Presentation (2 of 2) for August 23 and 25, 2021 Public Meeting ML21225A0012021-08-18018 August 2021 Preapplication Meeting Presentation Improved Technical Specifications Conversion ML21200A1472021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Closed Public ML21200A1562021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Open ML21159A1892021-06-0909 June 2021 Non-Proprietary - FPL NRC Presubmittal Meeting June 9th Closed Slides ML21159A1712021-06-0909 June 2021 FPL NRC Presubmittal Meeting June 10th Week Open Session ML21109A0052021-04-19019 April 2021 2020 - Stl - Tpn Combined EOC Presentation ML21096A0772021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification ML21096A0612021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification - Open ML21076A6152021-03-22022 March 2021 NRC Pre-Submittal Meeting, St. Lucie and Turkey Point Nuclear Plants - Improved Technical Specification Conversion - March 22, 2021 (EPID L-2021-LRM-0032) (Presentation) ML21047A2102021-02-16016 February 2021 NRC Presubmittal Meeting Telecon February 18, 2021 Open Meeting - FPL Safety System Replacement Project LAR - Nonproprietary ML21011A2382021-01-11011 January 2021 Slides for January 13, 2021 Presubmittal Meeting with NextEra Concerning Digital I&C Closed Non-Proprietary ML20338A0472020-12-0909 December 2020 December 9, 2020 FPL Slides Rps/Esfas Nuclear Instrumentation ML20266G2202020-09-15015 September 2020 Slide Presentation for September 15, 2020 Public Meeting Concerning CCW Headers ML20135F6652020-05-14014 May 2020 Stl - Tpn Combined EOC Presentation ML19116A2582019-05-0101 May 2019 Tp Dseis Meeting 05-01-19 Spanish Slides L-2018-136, L-2018-136-Attachment 53 Enclosure 1 - Slides and Presentations2018-08-0808 August 2018 L-2018-136-Attachment 53 Enclosure 1 - Slides and Presentations ML18150A2402018-05-30030 May 2018 Slides for Turkey Point Public Scoping Meeting on May 31 2018 - English ML18144A1242018-05-24024 May 2018 Summary of Public Meeting Concerning Annual Assessment of Turkey Point Nuclear Generating Station Unit 3 and Unit 4, for Period of January 1, 2017 December 31, 2017 ML18141A3072018-05-21021 May 2018 18 - SLR Status ML17310B2322017-11-0707 November 2017 Presentation Slides - NextEra Energy/Fpl - GSI-191 Issue Resolution, Pre-submittal Meeting, September 20, 2017 ML14174A4022014-06-24024 June 2014 6/24/2014, Pre-Submittal Meeting Slide for St. Lucie and Turkey Point Re. License Amendment Request Adoption of TSTF-505 Risk-Informed Completion Time ML14156A2212014-06-0404 June 2014 Public Meeting Summary - Turkey Point Nuclear Generating Station Docket Nos. 50-250 and 50-251 ML13164A3122013-06-13013 June 2013 Summary of Category 3 Public Meeting - Annual Assessment - Turkey Point Nuclear Plant Units 3 and 4 ML1205805322012-02-27027 February 2012 Public Meeting Summary - Turkey Point - Meeting Slides ML11178A0682011-06-23023 June 2011 Meeting Slides, Turkey Point Nuclear Plant, Units 3 and 4, Extended Power Uprate (Epu), NRC and FPL Public Meeting ML1114507462011-05-25025 May 2011 Annual Assessment Meeting - Presentation Slides 2024-04-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 4, 2014 MEMORANDUM TO: Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects FROM: Shane Sandal /RA/
Senior Project Engineer Reactor Projects Branch 3
SUBJECT:
PUBLIC MEETING
SUMMARY
- TURKEY POINT NUCLEAR GENERATING STATION DOCKET NOS. 50-250 AND 50-251 On May 21, 2014, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of Turkey Point Nuclear Generating Station, Units 3 and 4. The purpose of the meeting was to provide opportunities to discuss the annual assessment of Turkey Point with the public for the period of January 1, 2013, through December 31, 2013. Enclosed is a list of attendees and the Turkey Point annual assessment meeting presentation.
The following Region 2 and Headquarters NRC staff attended the public meeting:
Mark Lesser, Deputy Director, Division of Reactor Projects Daniel Rich, Chief, Reactor Projects Branch 3, Division of Reactor Projects Tim Hoeg, Senior Resident Inspector, Turkey Point Audrey Klett, Project Manager, Division of Operating Reactor Licensing Marlen Rodriguez, Site Administrative Assistant, Turkey Point Docket Nos.: 50-250 and 50-251 License No.: DPR-31, DPR-41
Enclosures:
- 1. List of Attendees
- 2. Meeting Presentation
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE SRS5 /RA/ DWR1 /RA/
NAME SSandal DRich DATE 6/4/2014 6/4/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Turkey Point Units 3 and 4 Annual Assessment Meeting 2013 Performance Assessment Nuclear Regulatory Commission - Region 2 Enclosure 2
NRC Organization
- 5 member Commission led by the Chairman
- Commissioners serve five-year terms
- ~4000 employees with ~$1 billion budget
Region I, Philadelphia, Pennsylvania Region II, Atlanta, Georgia Region III, Lisle, Illinois Region IV, Arlington, Texas Enclosure 2
NRC Strategic Plan Goals
- Safety - Ensure adequate protection of public health and safety and the environment
- Security - Ensure adequate protection in the secure use and management of radioactive materials Enclosure 2
Our Mission To license and regulate the nations civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
Enclosure 2
Reactor Oversight Process Strategic Perform an ce Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Significance Threshold Threshold Threshold Action Matrix Regulatory Response Enclosure 2
Areas and Cornerstones REACTOR OVERSIGHT FRAMEWORK MISSION:
Protect Public Health And Safety in the Use of Nuclear Power KEY AREAS:
Reactor Safety Radiation Safety Safeguards CORNERSTONES:
Initiating Mitigating Barrier Emergency Public Occupational Physical Events systems Integrity Preparedness Radiation Radiation Protection CROSS-CUTTING AREAS: Human Performance Safety Conscious Work Problem Identification and Environment Resolution Enclosure 2
Performance Indicators Objective data to monitor plant performance Use established thresholds that are predictable Crossing thresholds indicate a change in safety margin Enclosure 2
Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue Enclosure 2
Action Matrix Concept Multiple/Rep Licensee Regulatory Degraded Unacceptable Degraded Response Response Cornerstone Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Enclosure 2
NRC Annual Assessment Summary Turkey Point Unit 3 and Unit 4 Florida Power & Light operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
Turkey Point Unit 3 was in the Regulatory Response Column of the Action Matrix for the entire 2013 assessment period.
Turkey Point Unit 4 was in the Licensee Response Column of the Action Matrix for the entire 2013 assessment period.
Enclosure 2
NRC Annual Assessment Summary Turkey Point Unit 3 Performance Indicators Turkey Point Unit 3 was in the Regulatory Response Column for all 4 quarters of the 2013 assessment period due to reactor trips that caused the Unplanned Scrams per 7,000 Critical Hours indicator to be in the White performance band.
Enclosure 2
Summary of Plant Performance Licensee Response 80 Regulatory Response 9 Degraded Cornerstone 9 Multiple/Repetitive Deg. Cornerstone 1 Unacceptable (IMC 0350) 1 Total 100 Enclosure 2
Information on the Fukushima Accident
ops-experience/japan-dashboard.html
- Mailbox for comments on staff actions:
JLD_Public.Resource@nrc.gov
- Office of Public Affairs Point of
Contact:
OPA.resource@nrc.gov or 301-415-8200 Enclosure 2
NRC Social Media Channels
QUESTIONS Enclosure 2