MONTHYEARML24025A1372024-01-31031 January 2024 Summary of Observation Pre-Submittal Meeting Held with Snc., Regarding a Proposed Alternative Request - Explosively Actuated Valves for Vogtle Electric Generating Plant, Units 3 and 4 ML24019A1932024-01-30030 January 2024 Summary of January 8, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed LAR for Vogtle Electric Generating Plant, Units 1, 2, 3, & 4; Hatch, Units 1 & 2; Farley, Units 1 & 2 ML23356A0282023-12-27027 December 2023 December 11, 2023, Pre-Application Meeting with SNC Regarding a Proposed Fleet LAR to Revise TS 5.3.1 to Relocate Training Qualification Requirements from TS to Their Qatr/Ndqam ML23311A1302023-11-17017 November 2023 Summary of Nov. 6, 2023, - Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Physical Barriers Exemptions for Hatch Units 1 & 2, Farley Units 1 & 2 and Vogtle Units 1, 2, 3 & 4 (EPID L-2023-LLE-0018 & L-2023-LLE-0 ML23313A0952023-11-16016 November 2023 Summary of November 7, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML23303A2032023-11-0101 November 2023 October 24, 2023, Summary of Comment Gathering Public Meeting on Lessons Learned from the ITAAC Hearing Process for Vogtle Units 3 and 4 ML23275A0882023-10-12012 October 2023 Summary of Meeting with Southern Nuclear Operating Company ML23272A1822023-10-11011 October 2023 Summary of September 28, 2023, Observation Pre Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 3 and 4 ML23276A1852023-09-25025 September 2023 Subsequent License Renewal Draft EIS Public Meetings: Meeting Summary ML23230A0212023-08-30030 August 2023 LAR-22-002 Technical Specification 3.8.3 Summary of 08-17-23 Public Meeting ML23187A5742023-08-22022 August 2023 Summary of June 29, 2023, Meeting with Southern Nuclear Operating Company ML23221A3782023-08-16016 August 2023 Summary of Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Transition to a 24-Month Fuel Cycle ML23166A0042023-06-15015 June 2023 Summary of Meeting Concerning 2023 Annual Assessment of the Saint Lucie and the Turkey Point Nuclear Plants ML23146A1542023-06-0505 June 2023 Summary of May 25, 2023, Meeting with Southern Nuclear Operating Company ML23132A0412023-05-18018 May 2023 Summary of May 11, 2023, Meeting with Southern Nuclear Operating Company ML23121A1692023-05-12012 May 2023 Summary of Meeting with Southern Nuclear Operating Company Vogtle LAR-23-006 U/3&4 More Restrictive Action for TS 3.1.9 Cvs Isolation Valves ML23115A3282023-05-10010 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have a Pre-Submittal Discussion of Draft License Amendment Request (LAR) for Vogtle Electric Generating Plant (VEGP) Unit 3 ML23058A4262023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML23087A0692023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 ML23108A2752023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 ML23115A0662023-05-0101 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have Presubmittal Meeting for Vogtle Electric Generating Plant, Unit 4 ML23068A0712023-04-28028 April 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 (EPID L-2022-LLA-0105) - Nonproprietary IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 ML23107A2312023-04-18018 April 2023 Summary Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23090A1422023-04-0303 April 2023 Summary of Conference Call Regarding the Spring 2022 Steam Generator Tube Inspections ML23081A5022023-03-28028 March 2023 Summary of Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Transition to a 24-Month Fuel Cycle ML23065A0732023-03-17017 March 2023 March 2, 2023, Summary of Meeting with Southern Nuclear Operating Company - Vogtle Electric Generating Plant, Unit 4 ML23066A0872023-03-15015 March 2023 Summary of Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23069A0282023-03-15015 March 2023 Summary of January 31, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23055A0902023-03-14014 March 2023 February 16, 2023, Summary of Meeting with Southern Nuclear Operating Company ML23044A4172023-03-0606 March 2023 Summary of January 17, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23048A0492023-03-0303 March 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML23048A0682023-03-0101 March 2023 Summary of February 13, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc. Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML23037A0032023-02-0606 February 2023 Summary of February 2, 2023, Public Meeting with Southern Nuclear Operating Company ML22357A0742023-01-19019 January 2023 Summary of December 1, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests ML23012A0512023-01-17017 January 2023 January 11, 2023, Summary of Public Meeting with Southern Nuclear Operating Company (SNC) Regarding Vogtle Emergency Technical Specification Amendment ML22349A0012023-01-0505 January 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML22349A2142023-01-0303 January 2023 Summary of December 8, 2022, Public Meeting with Southern Nuclear Operating Company ML22327A2402022-12-0808 December 2022 Summary of October 27, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests ML22336A0812022-12-0505 December 2022 Summary of December 1, 2022, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22335A4922022-12-0202 December 2022 Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22319A0132022-11-30030 November 2022 Summary of a Public Meeting with Southern Nuclear Operating Company on November 10, 2022 ML22322A1672022-11-28028 November 2022 Summary of 11/15/2022 Public Meeting on Lessons Learned ML22276A2302022-10-0606 October 2022 Summary of September 13, 2022, Public Meeting with FPL Concerning Supplemental Information Needed for Acceptance of License Amendment Request to Replace Instrumentation with Digital Systems on Turkey Point, Units 3 and 4 ML22271A0182022-10-0404 October 2022 Summary of Public Meeting with SNC on Lessons Learned Final ML22257A2362022-09-19019 September 2022 Summary of September 13, 2022, Partially Open and Partially Closed Pre-Submittal Meeting Held with SNC, Regarding a Proposed OLM License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22144A0022022-09-14014 September 2022 Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency Plan 2024-01-31
[Table view] Category:Memoranda
MONTHYEARML23325A2022024-01-16016 January 2024 CFR Part 52 Construction Lessons-Learned Report ML24004A2192024-01-0808 January 2024 Construction Reactor Oversight Process Performance Metric Report for Calendar Year 2023 ML23303A2032023-11-0101 November 2023 October 24, 2023, Summary of Comment Gathering Public Meeting on Lessons Learned from the ITAAC Hearing Process for Vogtle Units 3 and 4 ML22348A0862023-07-25025 July 2023 Finding in Accordance with 10 CFR 52.103(G) That All Acceptance Criteria Are Met for Vogtle Electric Generating Plant, Unit 4 ML23166A0042023-06-15015 June 2023 Summary of Meeting Concerning 2023 Annual Assessment of the Saint Lucie and the Turkey Point Nuclear Plants ML23115A0382023-05-0909 May 2023 Summary of Readiness Group Public Meeting on April 20, 2023 ML23115A0662023-05-0101 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have Presubmittal Meeting for Vogtle Electric Generating Plant, Unit 4 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 ML22214B4882023-02-0808 February 2023 Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities for Vogtle Electric Generating Plant, Unit 4 ML22355A0322023-01-0303 January 2023 Revised Charter for the Vogtle Readiness Group to Oversee the Transition to Operations for Vogtle Units 3 and 4 ML22334A0812022-12-0101 December 2022 Update to Targeted Inspections, Tests, Analysis, and Acceptance Criteria for Vogtle Electric Generating Plant Unit 4 ML22322A1672022-11-28028 November 2022 Summary of 11/15/2022 Public Meeting on Lessons Learned ML22276A2302022-10-0606 October 2022 Summary of September 13, 2022, Public Meeting with FPL Concerning Supplemental Information Needed for Acceptance of License Amendment Request to Replace Instrumentation with Digital Systems on Turkey Point, Units 3 and 4 ML22238A3142022-08-0707 August 2022 Documentation of Approval for Longer Review Period for Turkey Point Digital Instrumentation and Control License Amendment Requests Acceptance Review ML22237A0782022-08-0505 August 2022 American Nuclear Insurers, Notification of Change in the Number of Power Reactors in the Secondary Financial Protection (SFP) Program ML20290A2812022-08-0101 August 2022 103g - Final Memorandum ML22145A3932022-05-25025 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting 20220434 ML22123A0652022-05-0202 May 2022 Public Meeting Summary Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 50-424, 50-425, 52-025, 52-026, Meeting Number 20220330 ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21337A0032021-12-0707 December 2021 Summary of Vogtle Readiness Group Public Meeting on December 2, 2021 ML21322A1502021-12-0202 December 2021 Summary of November 10, 2021 Public Meeting with Southern Nuclear Operating Company ML21316A0692021-11-22022 November 2021 November 4, 2021 Summary of Public Meeting with Southern Nuclear Operating Company ML21280A2962021-10-22022 October 2021 Replacement of Page 2 to Letter Dated June 30, 2020, Titled License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions (EPID L-2020-LLA0150) ML21230A0102021-08-24024 August 2021 Summary of Public Meeting with Southern Nuclear Operating Company on August 12, 2021 ML21154A2772021-07-20020 July 2021 Summary of a Public Meeting with Southern Nuclear Operating Company on May 27, 2021 ML21194A0402021-07-20020 July 2021 Summary of June 24, 2021 Public Meeting with SNC ML21194A0392021-07-16016 July 2021 July 8, 2021 Summary of Public Meeting with Southern Nuclear Operating Company ML21190A0622021-07-16016 July 2021 Summary of July 8 2021 Public Meeting to Discuss Late-Filed Allegation Process for Vogtle Electric Generating Plant Units 3 and 4 ML21159A1352021-06-0808 June 2021 Public Meeting Summary Regarding the Saint Lucie Nuclear Plant, Units 1 and 2, Docket No. 50-335 and 389, and the Turkey Point Nuclear Generating Station Units 3 and 4, Docket No. 50-250 and 50-251; Meeting Number 20210505 ML21124A2032021-05-0606 May 2021 ASME Alternative ALT-16 Pre-submittal Meeting Summary 4-29-21 ML21123A1432021-05-0505 May 2021 April 22, 2021, Summary of a Public Meeting with Southern Nuclear Operating Company ML20318A2422020-12-18018 December 2020 .72 50.73 Applicability Memo ML20315A2642020-12-14014 December 2020 November 5, 2020, Summary of Drop-In Meeting with Nextera-Florida Power and Light to Discuss Pending Submittals Related to Digital Instrumentation and Controls and Improved Standard Technical Specifications ML20351A2822020-12-10010 December 2020 Summary of Public Meeting with Southern Nuclear Operating Co ML20318A2412020-11-18018 November 2020 Summary of Public Meeting with Southern Nuclear Operating Company, to Discuss Topic Regarding Vogtle Electric Generating Plant, Unit 4: ITAAC Post Closure Notification for ITAAC Index Number 344 ML20303A0422020-11-0505 November 2020 Summary of October 22, 2020 Public Meeting with Southern Nuclear Operating Company NL-20-1262, Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion2020-10-30030 October 2020 Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion ML20283A4652020-10-15015 October 2020 Summary of Public Meeting on October 8, 2020 with Southern Nuclear Operating Company ML20296A2432020-10-15015 October 2020 Summary of 10-15-20 Public Meeting with Southern Nuclear Operating Company ML20279A5202020-10-0707 October 2020 October 1, 2020, Summary of Public Meeting with Southern Nuclear Operating Company ML20183A0902020-09-24024 September 2020 Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities for Vogtle Electric Generating Plant, Unit 3 ML20262G9882020-09-22022 September 2020 September 17, 2020 Summary of Public Meeting with Southern Nuclear Operating Company ML20247J4812020-09-10010 September 2020 Summary for August 27, 2020 Public Meeting with Southern Nuclear Operating Company ML20248H3292020-09-10010 September 2020 Meeting Summary for September 3, 2020 Public Meeting with Southern Nuclear Operating Company ML20191A3832020-08-14014 August 2020 Transition to Reactor Oversight Process for Vogtle Electric Generating Plant, Units 3 and 4 ML20216A6362020-08-10010 August 2020 Summary of a Public Meeting with Southern Nuclear Operating Company on July 23, 2020 ML20216A6252020-08-10010 August 2020 Summary of a Public Meeting with Southern Nuclear Operating Company on July 30, 2020 ML20205L4312020-07-29029 July 2020 Summary of a Public Meeting with Southern Nuclear Operating Company to Discuss Inspections, Tests, Analyses and Acceptance Criteria Nos. 375 and 216 ML20178A1302020-07-15015 July 2020 Memorandum Transmitting Safety Evaluation Regarding Welded Reinforcement Bar Splices at Vogtle Electric Generating Plant Units 3 and 4 ML20190A0182020-07-0808 July 2020 Summary of Meeting Regarding the Vogtle Readiness Group 2024-01-08
[Table view] |
Text
November 16, 2009 MEMORANDUM TO: Edward Roach, Acting Chief Health Physics Branch Division of Construction Inspection
& Operational Programs Office of New Reactors FROM: Robert Kellner, Health Physicist /RA/
Health Physics Branch Division of Construction Inspection
& Operational Programs Office of New Reactors
SUBJECT:
SUMMARY
OF NOVEMBER 18, 2009, CATEGORY 2 PUBLIC MEETING WITH THE NUCLEAR ENERGY INSTITUTE TO DISCUSS HEALTH PHYSICS ISSUES FOR NEW REACTORS On November 18, 2009, the Nuclear Regulatory Commission (NRC) staff held a teleconference meeting with members of the Nuclear Energy Institute (NEI) to discuss new reactor health physics issues. Enclosure 1 lists the meeting attendees.
A public meeting notice was issued on November 2, 2009, and was posted on the NRC's external (public) web page (Agencywide Document Access Management System (ADAMS)
Accession No. ML093030475). The notice included the meeting agenda, which was also available as a handout at the meeting. The discussions included:
General COLA/DCD Application Status and Lessons Learned Status of Industry Radiation Protection Templates Radiological Aspects of Construction and Pre-Operation Regulatory Updates and Perspectives Miscellaneous Topics of Interest NRC provided status updates of COLA and DCD applications and lessons learned from the review process. Information provided included NRC staff review of the Turkey Point proposed use of deep well injection, the ongoing transition from Bellefonte to Vogtle as the RCOL for AP-1000, AP-1000 shield building load basis, and progress of the EPR and USAPWR design applications. NRC also provided information concerning several generic review focus areas including reactor cavity drain down during refueling (GSI-137), shielding design & dose rate calculations, and DCD departure documentation.
NRC and industry representatives discussed the status of the Radiation Protection Program templates developed by NEI to support COL applications. NEI stated that the final accepted versions of the NEI 07-08A and NEI 08-08A templates were electronically submitted to the Document Control desk on 29 October, 2009.
R. Roach NRC stated that ADAMS document numbers were not yet available, but that as soon as they were available they would be sent to NEI and the ADAMS numbers would be included in the meeting summary along with the ADAMS document numbers for all of the NEI Radiation Protection Templates. Subsequent to the meeting, NRC staff verified that NEI 07-08A and NEI 08-08A are available as ADAMS documents ML093220178 and ML093220530 respectively.
In response to the NEI question asked during the October 21, 2009 meeting about being able to identify the Requests for Additional information (RAIs) related to 10 CFR 20.1406 that have been issued, NRC stated that no reports have been developed across designs for a specific issue or topic. However, RAI reports for each COL are publicly available via the New Reactor section of the NRC website. NRC stated that work is ongoing to develop additional report queries that will support this type of report generation across designs.
NEI presented problem statements on the planned radiological aspects of construction and pre-operation discussion topics. The topics were; 1) Excavation & dredging of soils & sediments, and pumping of surface & groundwater, 2) Exposure of workers from a neighboring operational nuclear plant, 3) Use of radioactive sources NOT covered under the COL. The problem statements were revised by NEI to include the applicable regulations and associated Regulatory Guides. During development of the problem statements NEI identified many interrelated aspects of all topics, and that a collocated Part 50 licensee will have responsibilities prior to, and after, a Part 52 COL is issued. Lengthy discussion of the topics did not result in any final determination of how each topic could best be addressed. NEI reiterated that the purpose of the discussions is to come to a common understanding of the potential issues that may arise during construction and pre-operation, and identify the applicable regulatory basis. NRC mentioned that a regulatory guide is being developed regarding residual radioactivity and may be useful in addressing soil and sediment. NEI and NRC agreed that a Regulatory Issue Summary (RIS) may be the best way to identify Part 50 licensee responsibilities under the existing license regarding new reactor construction. NEI and NRC agreed to review the problem statements and bring additional discussion points to the December meeting.
NRC stated that there was no update on the release of DC/COL-ISG-014, Interim Staff Guidance on Assessing Ground Water Flow and Transport of Accidental Radionuclide Releases (ISG-014), for public comment. NEI stated that they have decided to withhold their comments on ISG-013 until the comments can be submitted in conjunction with the comments for the review of ISG-014.
NRC asked NEI if any new information had been identified by industry that would have any impact on new reactor activities, during the buried piping public meetings in October. NEI stated that industry would be adopting a voluntary initiative concerning buried piping. Details will be provided at a later date. In a related topic, NRC stated that The Commission directed the staff to develop information about how existing and new reactors are addressing buried piping operationally and in design. The memo has not been finalized at this time.
R. Roach In response to NRC questions from the October 21, 2009 meeting about three topics that were discussed during presentations at the EPRI/NEI Groundwater Workshop and possible effects on NEI 08-08, NEI provided the following information: On the question about an NEI initiative on Accidental Releases from Liquid Tanks; this may have been a miscommunication, it has to do with the ISG-13 and ISG-14 reviews. On the question about plans to revise the groundwater guidelines; EPRI has no near term plans to revise the guidelines. On the question of what appears to be a focus on Carbon-14 during several presentations; a study is planned of C-14 production, form, release, and methods of how to include the dose in effluent reports with a due date in late 2010.
The next meeting is scheduled for December 15, 2009, and the January 2010 meeting is scheduled for January 20, 2010. All upcoming scheduled meetings will be held at the White Flint complex.
Enclosure:
List of Attendees cc w/encl: See next page
R. Roach In response to NRC questions from the October 21, 2009 meeting about three topics that were discussed during presentations at the EPRI/NEI Groundwater Workshop and possible effects on NEI 08-08, NEI provided the following information: On the question about an NEI initiative on Accidental Releases from Liquid Tanks; this may have been a miscommunication, it has to do with the ISG-13 and ISG-14 reviews. On the question about plans to revise the groundwater guidelines; EPRI has no near term plans to revise the guidelines. On the question of what appears to be a focus on Carbon-14 during several presentations; a study is planned of C-14 production, form, release, and methods of how to include the dose in effluent reports with a due date in late 2010.
The next meeting is scheduled for December 15, 2009, and the January 2010 meeting is scheduled for January 20, 2010. All upcoming scheduled meetings will be held at the White Flint complex.
Enclosure:
List of Attendees NEI Radiation Protection Template ADAMS Document Numbers cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsOgcMailCenter A. Cubbage S. Burrows RidsAcrsAcnwMailCenter I. Berrios rla@nei.org NRO_DCIP_CHPB RidsNroDcip RidsNroDcipChpb RidsOpaMail Al Tschaeche (xat@alum.mit.edu) David Matchick (dmatch@prolog.net)
ADAMS Package Accession Number: ML093500039 Meeting Summary Accession Number: ML093491144 Meeting Notice Accession Number: ML093030475 OFFICE NRO/DCIP/CHPB NRO/DCIP/CHPB (BC)
NAME R. Kellner E. Roach DATE 12/16/09 12/16/09 OFFICIAL RECORD
Public Meeting with the Nuclear Energy Institute (NEI)
Discussion of New Reactor Health Physics Topics November 18, 2009 Meeting Attendees Name Organization Name Organization Ed Roach NRC - HQ Roy Karimi ERI William Smith SNC Ed Stutzcage NRC - HQ Aaron Wilmot* Westinghouse Richard Conatser NRC - HQ Robert Kellner NRC - HQ Ellen Anderson NEI Steve Garry NRC - HQ Tim Frye NRC - HQ Richard Ely Enercon Al Tschaeche* NUMARK Jairus Greene MNES Charles Hinson NRC - HQ Ron LaVera NRC - HQ Stewart Bland* Chesapeake Nuclear Ralph Andersen NEI
NEI Radiation Protection Template ADAMS Document Numbers The table below contains a list of applicable documents related to the set of templates developed by industry and accepted by the NRC for use in COL applications.
NEI 07-03A, Generic FSAR Template Guidance for Radiation Protection Program Description NEI 07-08A, Generic Final Safety Analysis Report (FSAR) Template Guidance for Ensuring that Occupational Radiation Exposures are as Low as Reasonably Achievable (ALARA)
NEI 07-09A, Generic FSAR Template Guidance for Offsite Dose Calculation Manual (ODCM)
Program Description NEI 07-10A, Generic FSAR Template Guidance for Process Control Program (PCP)
NEI 08-08A, Generic FSAR Template Guidance for Life Cycle Minimization of Contamination NEI Template Short Document Title ADAMS #
NEI 07-03 Rev 7 NEI 07-03 Revision 7 - Template ML083380347 NEI 07-03 Rev 7 NEI 07-03 Revision 7 SER and cover letter to NEI ML090510379 NEI 07-03A Rev 0 NEI 07-03A Cover letter from NEI sending Final Accepted ML091490680 Template NEI 07-03A Rev 0 NEI 07-03A Final NRC Accepted Template ML091490684 NEI 07-08 Rev 3 NEI 07-08 Revision 3 SER and cover letter to NEI ML091130034 NEI 07-08 Rev 3 NEI 07-08 Revision 3 - Template ML083380351 NEI 07-08A Rev 0 NEI 07-08A Cover letter from NEI sending Final Accepted ML093220171 Template NEI 07-08A Rev 0 NEI 07-08A Final NRC Accepted Template ML093220178 NEI 07-09 Rev 4 NEI 07-09 Revision 4 - Template ML083380298 NEI 07-09 Rev 4 NEI 07-09 Revision 4 SER and cover letter to NEI ML083530745 NEI 07-09A Rev 0 NEI 07-09A Final NRC Accepted Template ML091050234 NEI 07-09A Rev 0 NEI 07-09A Cover letter from NEI sending Final Accepted ML09105232 Template ML09105233 NEI 07-10 Rev 3 NEI 07-10 Revision 3 - Template ML081720166 NEI 07-10 Rev 3 NEI 07-10 Revision 3 SER and cover letter to NEI ML082910077 NEI 07-10A Rev 0 NEI 07-10A Final NRC Accepted Template ML091460627 NEI 07-10A Rev 0 NEI 07-10A Cover letter from NEI sending Final Accepted ML09105232 Template ML09105233 NEI 08-08 Rev 3 NEI 08-08 Revision 3 - Template ML092740379 NEI 08-08 Rev 3 NEI 08-08 Revision 3 SER and cover letter to NEI ML092720253 NEI 08-08 Rev 3 ACRS Acceptance of EDO Resolution of NEI 08-08 and ISG-06 ML092990660 Comments NEI 08-08A Rev 0 NEI 08-08A Cover letter from NEI sending Final Accepted ML093220461 Template NEI 08-08A Rev 0 NEI 08-08A Final NRC Accepted Template ML093220530 Enclosure 2
Nuclear Energy Institute cc:
Mr. Anthony Pietrangelo, Vice President Alexander Marion, Executive Director Regulatory Affairs Nuclear Operations & Engineering Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 arp@nei.org am@nei.org Mr. H. A. Sepp, Manager Mr. James H. Riley, Director Regulatory and Licensing Engineering Engineering Westinghouse Electric Company Nuclear Energy Institute P. O. Box 355 Suite 400 Pittsburgh, PA 15230-0355 1776 I Street, NW Washington, DC 20006-3708 Mr. Jack Roe Nuclear Energy Institute Ralph Anderson 1776 I Street, NW, Suite 400 Nuclear Energy Institute Washington, DC 20006-3708 1776 I Street, NW, Suite 400 jrw@nei.org Washington, DC 20006-3708 rla@nei.org Mr. Charles B. Brinkman Washington Operations Ron Shippee ABB-Combustion Engineering, Inc. Areva Unistar 12300 Twinbrook Parkway, Suite 330 ronald.shippee@areva.com Rockville, MD 20852 Milton Rejcek Mr. Gary L. Vine, Executive Director STPNOC Federal and Industry Activities, Nuclear Sector mfrejcek@stpegs.com EPRI 2000 L Street, NW, Suite 805 William Smith Washington, DC 20036 Southern Company Gvine@epri.com x2wesmit@southernco.com Mr. Pedro Salas Richard Ely AREVA Enercon Services pedro.salas@areva.com rely@enercon.com Ms. Barbara Lewis Mark Strum Assistant Editor Areva Unistar Platts, Principal Editorial Office Mark.Strum@areva.com 1200 G St., N.W., Suite 1100 Washington, DC 20005 Ellen Anderson barbara_lewis@platts.com Nuclear Energy Institute 1776 I Street, NW, Suite 400 Mr. Gary Welsh Washington, DC 20006-3708 Institute of exa@nei.org Nuclear Power Operations Suite 100 Martin ONeill 700 Galleria Parkway, SE Morgan Lewis Atlanta, GA 30339-5957 martin.oneill@morganlewis.com Enclosure 3