ML093491144
| ML093491144 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, Framatome, Vogtle, Bellefonte, 05200001, PROJ0763 |
| Issue date: | 12/16/2009 |
| From: | Kellner R NRC/NRO/DCIP/CHPB |
| To: | Roach E NRC/NRO/DCIP/CHPB |
| Kellner, Rober NRO/DCIP/CHPB 415-5111 | |
| Shared Package | |
| ml093500039 | List: |
| References | |
| Download: ML093491144 (7) | |
Text
November 16, 2009 MEMORANDUM TO:
Edward Roach, Acting Chief Health Physics Branch Division of Construction Inspection
& Operational Programs Office of New Reactors FROM:
Robert Kellner, Health Physicist /RA/
Health Physics Branch Division of Construction Inspection
& Operational Programs Office of New Reactors
SUBJECT:
SUMMARY
OF NOVEMBER 18, 2009, CATEGORY 2 PUBLIC MEETING WITH THE NUCLEAR ENERGY INSTITUTE TO DISCUSS HEALTH PHYSICS ISSUES FOR NEW REACTORS On November 18, 2009, the Nuclear Regulatory Commission (NRC) staff held a teleconference meeting with members of the Nuclear Energy Institute (NEI) to discuss new reactor health physics issues. Enclosure 1 lists the meeting attendees.
A public meeting notice was issued on November 2, 2009, and was posted on the NRC's external (public) web page (Agencywide Document Access Management System (ADAMS)
Accession No. ML093030475). The notice included the meeting agenda, which was also available as a handout at the meeting. The discussions included:
General COLA/DCD Application Status and Lessons Learned Status of Industry Radiation Protection Templates Radiological Aspects of Construction and Pre-Operation Regulatory Updates and Perspectives Miscellaneous Topics of Interest NRC provided status updates of COLA and DCD applications and lessons learned from the review process. Information provided included NRC staff review of the Turkey Point proposed use of deep well injection, the ongoing transition from Bellefonte to Vogtle as the RCOL for AP-1000, AP-1000 shield building load basis, and progress of the EPR and USAPWR design applications. NRC also provided information concerning several generic review focus areas including reactor cavity drain down during refueling (GSI-137), shielding design & dose rate calculations, and DCD departure documentation.
NRC and industry representatives discussed the status of the Radiation Protection Program templates developed by NEI to support COL applications. NEI stated that the final accepted versions of the NEI 07-08A and NEI 08-08A templates were electronically submitted to the Document Control desk on 29 October, 2009.
NRC stated that ADAMS document numbers were not yet available, but that as soon as they were available they would be sent to NEI and the ADAMS numbers would be included in the meeting summary along with the ADAMS document numbers for all of the NEI Radiation Protection Templates. Subsequent to the meeting, NRC staff verified that NEI 07-08A and NEI 08-08A are available as ADAMS documents ML093220178 and ML093220530 respectively.
In response to the NEI question asked during the October 21, 2009 meeting about being able to identify the Requests for Additional information (RAIs) related to 10 CFR 20.1406 that have been issued, NRC stated that no reports have been developed across designs for a specific issue or topic. However, RAI reports for each COL are publicly available via the New Reactor section of the NRC website. NRC stated that work is ongoing to develop additional report queries that will support this type of report generation across designs.
NEI presented problem statements on the planned radiological aspects of construction and pre-operation discussion topics. The topics were; 1) Excavation & dredging of soils & sediments, and pumping of surface & groundwater, 2) Exposure of workers from a neighboring operational nuclear plant, 3) Use of radioactive sources NOT covered under the COL. The problem statements were revised by NEI to include the applicable regulations and associated Regulatory Guides. During development of the problem statements NEI identified many interrelated aspects of all topics, and that a collocated Part 50 licensee will have responsibilities prior to, and after, a Part 52 COL is issued. Lengthy discussion of the topics did not result in any final determination of how each topic could best be addressed. NEI reiterated that the purpose of the discussions is to come to a common understanding of the potential issues that may arise during construction and pre-operation, and identify the applicable regulatory basis. NRC mentioned that a regulatory guide is being developed regarding residual radioactivity and may be useful in addressing soil and sediment. NEI and NRC agreed that a Regulatory Issue Summary (RIS) may be the best way to identify Part 50 licensee responsibilities under the existing license regarding new reactor construction. NEI and NRC agreed to review the problem statements and bring additional discussion points to the December meeting.
NRC stated that there was no update on the release of DC/COL-ISG-014, Interim Staff Guidance on Assessing Ground Water Flow and Transport of Accidental Radionuclide Releases (ISG-014), for public comment. NEI stated that they have decided to withhold their comments on ISG-013 until the comments can be submitted in conjunction with the comments for the review of ISG-014.
NRC asked NEI if any new information had been identified by industry that would have any impact on new reactor activities, during the buried piping public meetings in October. NEI stated that industry would be adopting a voluntary initiative concerning buried piping. Details will be provided at a later date. In a related topic, NRC stated that The Commission directed the staff to develop information about how existing and new reactors are addressing buried piping operationally and in design. The memo has not been finalized at this time.
In response to NRC questions from the October 21, 2009 meeting about three topics that were discussed during presentations at the EPRI/NEI Groundwater Workshop and possible effects on NEI 08-08, NEI provided the following information: On the question about an NEI initiative on Accidental Releases from Liquid Tanks; this may have been a miscommunication, it has to do with the ISG-13 and ISG-14 reviews. On the question about plans to revise the groundwater guidelines; EPRI has no near term plans to revise the guidelines. On the question of what appears to be a focus on Carbon-14 during several presentations; a study is planned of C-14 production, form, release, and methods of how to include the dose in effluent reports with a due date in late 2010.
The next meeting is scheduled for December 15, 2009, and the January 2010 meeting is scheduled for January 20, 2010. All upcoming scheduled meetings will be held at the White Flint complex.
Enclosure:
List of Attendees cc w/encl: See next page
In response to NRC questions from the October 21, 2009 meeting about three topics that were discussed during presentations at the EPRI/NEI Groundwater Workshop and possible effects on NEI 08-08, NEI provided the following information: On the question about an NEI initiative on Accidental Releases from Liquid Tanks; this may have been a miscommunication, it has to do with the ISG-13 and ISG-14 reviews. On the question about plans to revise the groundwater guidelines; EPRI has no near term plans to revise the guidelines. On the question of what appears to be a focus on Carbon-14 during several presentations; a study is planned of C-14 production, form, release, and methods of how to include the dose in effluent reports with a due date in late 2010.
The next meeting is scheduled for December 15, 2009, and the January 2010 meeting is scheduled for January 20, 2010. All upcoming scheduled meetings will be held at the White Flint complex.
Enclosure:
List of Attendees NEI Radiation Protection Template ADAMS Document Numbers cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsOgcMailCenter A. Cubbage S. Burrows RidsAcrsAcnwMailCenter I. Berrios rla@nei.org NRO_DCIP_CHPB RidsNroDcip RidsNroDcipChpb RidsOpaMail Al Tschaeche (xat@alum.mit.edu)
David Matchick (dmatch@prolog.net)
ADAMS Package Accession Number: ML093500039 Meeting Summary Accession Number: ML093491144 Meeting Notice Accession Number: ML093030475 OFFICE NRO/DCIP/CHPB NRO/DCIP/CHPB (BC)
NAME R. Kellner E. Roach DATE 12/16/09 12/16/09 OFFICIAL RECORD
Public Meeting with the Nuclear Energy Institute (NEI)
Discussion of New Reactor Health Physics Topics November 18, 2009 Meeting Attendees Name Organization Name Organization Ed Roach NRC - HQ Roy Karimi ERI William Smith SNC Ed Stutzcage NRC - HQ Aaron Wilmot*
Westinghouse Richard Conatser NRC - HQ Robert Kellner NRC - HQ Ellen Anderson NEI Steve Garry NRC - HQ Tim Frye NRC - HQ Richard Ely Enercon Al Tschaeche*
NUMARK Jairus Greene MNES Charles Hinson NRC - HQ Ron LaVera NRC - HQ Stewart Bland*
Chesapeake Nuclear Ralph Andersen NEI
- By Telephone
NEI Radiation Protection Template ADAMS Document Numbers The table below contains a list of applicable documents related to the set of templates developed by industry and accepted by the NRC for use in COL applications.
NEI 07-03A, Generic FSAR Template Guidance for Radiation Protection Program Description NEI 07-08A, Generic Final Safety Analysis Report (FSAR) Template Guidance for Ensuring that Occupational Radiation Exposures are as Low as Reasonably Achievable (ALARA)
NEI 07-09A, Generic FSAR Template Guidance for Offsite Dose Calculation Manual (ODCM)
Program Description NEI 07-10A, Generic FSAR Template Guidance for Process Control Program (PCP)
NEI 08-08A, Generic FSAR Template Guidance for Life Cycle Minimization of Contamination NEI Template Short Document Title ADAMS #
NEI 07-03 Rev 7 NEI 07-03 Revision 7 - Template ML083380347 NEI 07-03 Rev 7 NEI 07-03 Revision 7 SER and cover letter to NEI ML090510379 NEI 07-03A Rev 0 NEI 07-03A Cover letter from NEI sending Final Accepted Template ML091490680 NEI 07-03A Rev 0 NEI 07-03A Final NRC Accepted Template ML091490684 NEI 07-08 Rev 3 NEI 07-08 Revision 3 SER and cover letter to NEI ML091130034 NEI 07-08 Rev 3 NEI 07-08 Revision 3 - Template ML083380351 NEI 07-08A Rev 0 NEI 07-08A Cover letter from NEI sending Final Accepted Template ML093220171 NEI 07-08A Rev 0 NEI 07-08A Final NRC Accepted Template ML093220178 NEI 07-09 Rev 4 NEI 07-09 Revision 4 - Template ML083380298 NEI 07-09 Rev 4 NEI 07-09 Revision 4 SER and cover letter to NEI ML083530745 NEI 07-09A Rev 0 NEI 07-09A Final NRC Accepted Template ML091050234 NEI 07-09A Rev 0 NEI 07-09A Cover letter from NEI sending Final Accepted Template ML09105232 ML09105233 NEI 07-10 Rev 3 NEI 07-10 Revision 3 - Template ML081720166 NEI 07-10 Rev 3 NEI 07-10 Revision 3 SER and cover letter to NEI ML082910077 NEI 07-10A Rev 0 NEI 07-10A Final NRC Accepted Template ML091460627 NEI 07-10A Rev 0 NEI 07-10A Cover letter from NEI sending Final Accepted Template ML09105232 ML09105233 NEI 08-08 Rev 3 NEI 08-08 Revision 3 - Template ML092740379 NEI 08-08 Rev 3 NEI 08-08 Revision 3 SER and cover letter to NEI ML092720253 NEI 08-08 Rev 3 ACRS Acceptance of EDO Resolution of NEI 08-08 and ISG-06 Comments ML092990660 NEI 08-08A Rev 0 NEI 08-08A Cover letter from NEI sending Final Accepted Template ML093220461 NEI 08-08A Rev 0 NEI 08-08A Final NRC Accepted Template ML093220530
Nuclear Energy Institute cc:
Mr. Anthony Pietrangelo, Vice President Regulatory Affairs Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org Mr. H. A. Sepp, Manager Regulatory and Licensing Engineering Westinghouse Electric Company P. O. Box 355 Pittsburgh, PA 15230-0355 Mr. Jack Roe Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jrw@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036 Gvine@epri.com Mr. Pedro Salas AREVA pedro.salas@areva.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 barbara_lewis@platts.com Mr. Gary Welsh Institute of Nuclear Power Operations Suite 100 700 Galleria Parkway, SE Atlanta, GA 30339-5957 Alexander Marion, Executive Director Nuclear Operations & Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708 Ralph Anderson Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 rla@nei.org Ron Shippee Areva Unistar ronald.shippee@areva.com Milton Rejcek STPNOC mfrejcek@stpegs.com William Smith Southern Company x2wesmit@southernco.com Richard Ely Enercon Services rely@enercon.com Mark Strum Areva Unistar Mark.Strum@areva.com Ellen Anderson Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 exa@nei.org Martin ONeill Morgan Lewis martin.oneill@morganlewis.com