ML23044A417

From kanterella
Jump to navigation Jump to search

Summary of January 17, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests
ML23044A417
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 03/06/2023
From: Natreon Jordan
NRC/NRR/DORL/LPL2-2
To:
References
EPID L-2021-LLI 0000, EPID L-2021-LLI-0002
Download: ML23044A417 (1)


Text

March 6, 2023 LICENSEE: Florida Power and Light FACILITIES: St. Lucie Plant, Unit Nos. 1 and 2 Turkey Point Nuclear Generating, Unit Nos. 3 and 4

SUBJECT:

SUMMARY

OF JANUARY 17, 2023, MEETING WITH FLORIDA POWER AND LIGHT ON ST. LUCIE AND TURKEY POINT IMPROVED TECHNICAL SPECIFICATIONS CONVERSION LICENSE AMENDMENT REQUESTS (EPID NOS. L-2021-LLI-0000 AND L-2021-LLI-0002)

On January 17, 2023, a virtual observation public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Florida Power and Light (FPL, the licensee). The purpose of the meeting was to discuss the license amendment requests (LARs) for St. Lucie Plant, Unit Nos. 1 and 2 (St. Lucie) to convert to Improved Technical Specifications (ITS) in accordance with NUREG-1432, Standard Technical Specifications - Combustion Engineering Plants, Revision 5 (Improved Standard Technical Specifications (ISTS)) and Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point) to convert to ITS in accordance with NUREG-1431, Standard Technical Specifications - Westinghouse Plants, Revision 5. The meeting notice and agenda, dated January 5, 2023, are available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML23005A200. A list of attendees is provided in the Enclosure.

The following items for the St. Lucie review were discussed during the meeting:

NRC and licensee staff provided a current status of the review effort.

o NRC staff provided questions to the licensee involving proposed mode changes in Section 3.3 and the adoption of TSTF-569.

o NRC staff also identified areas where the licensee removed pertinent information related to Section 3.3 from the Technical Bases. NRC staff expressed to the licensee that the information should be included in the Bases.

The following items for the Turkey Point review effort were also discussed:

Additional discussion was held between NRC and licensee staff regarding the licensees plan to remove setpoints from the Technical Specifications to the licensee-controlled Technical Requirement Manual.

There were no members of the public in attendance for this meeting.

For questions or comments, please contact me at 301-415-7410, or Natreon.Jordan@nrc.gov.

/RA/

Natreon J. Jordan, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250, 50-251, 50-335, and 50-389

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES JANUARY 17, 2023, PUBLIC MEETING WITH FPL/NEXTERA ST. LUCIE PLANT, UNIT NOS. 1 AND 2 TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 IMPROVED TECHNICAL SPECIFICATIONS CONVERSION Name Organization Natreon (Nate) Jordan U.S. Nuclear Regulatory Commission (NRC)

Clinton Ashley NRC Craig Harbuck NRC Ravi Grover NRC Khadijah West NRC Matthew Hamm NRC Vic Cusumano NRC Josh Wilson NRC Andrea Russell NRC Steve Smith NRC William Roggenbrodt NRC John Zhao NRC David Rahn NRC Michael Waters NRC Tarico Sweat NRC Michael Mahoney NRC Michael Davis Florida Power and Light Company (FPL)

Jarrett Mack FPL Michael Coen FPL Gregg Ellis Excel Services Corporation (Excel)

Jerry Riste Excel Charles DeDeaux Excel Christina Long Excel Bruce Crabbs Excel David Bice Excel Enclosure

Package: ML23044A404 Meeting Notice: ML23005A200 Meeting Summary: ML23044A417 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NAME NJordan RButler DWrona DATE 2/10/2023 2/16/2023 3/6/2023