ML21109A005

From kanterella
Jump to navigation Jump to search
2020 - Stl - Tpn Combined EOC Presentation
ML21109A005
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 04/19/2021
From:
NRC/RGN-II
To:
References
Download: ML21109A005 (21)


Text

St. Lucie Units 1 & 2 Turkey Point Units 3 & 4 Combined Annual Assessment Meeting 2020 Reactor Oversight Process (ROP)

U.S. Nuclear Regulatory Commission Region 2 / Division of Reactor Projects

Agenda Introductions - St. Lucie and Turkey Point Resident Inspectors and the Regional Staff Responsible for Oversight Strategic Plan Goals Annual Assessment Summary Findings Performance Indicators NRC Inspection Plans for 2021 COVID-19 Response

Introductions

St. Lucie Resident Inspectors Dan Orr - Senior Resident Inspector Steve Roberts - Resident Inspector Turkey Point Resident Inspectors Matthew Endress - Senior Resident Inspector Rogerio Reyes - Resident Inspector Regional Personnel David Dumbacher - Branch Chief Jeffrey Hamman - Senior Project Engineer Adam Wilson - Project Engineer

The NRCs Resident Inspectors NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection of the secure use and management of radioactive materials

NRC Annual Assessment Summary St. Lucie NextEra Energy / Florida Power & Light operated St. Lucie safely and in a manner that preserved the public health and safety and protected the environment.

St. Lucie Units 1 and 2 were in the Licensee Response Column (Column 1 of IMC 0305) of the NRCs ROP Action Matrix for the Calendar Year of 2020.

NRC Annual Assessment Summary St. Lucie - continued The NRC has determined that the St. Lucie no longer meets the criteria for continued monitoring of the SCWE cross-cutting theme (NRC integrated inspection report 05000335/2020002 and 05000389/2020002 (ADAMS Accession No. ML20212L728)

NRC Inspection Activities St. Lucie for 2020 Approximately 7,534 hours0.00618 days <br />0.148 hours <br />8.829365e-4 weeks <br />2.03187e-4 months <br /> of inspection and related activities 2 Resident inspectors onsite for full-time inspection coverage throughout the year 8 Onsite inspections involving regional inspectors

NRC Inspection Activities St. Lucie for 2020 - continued 3 major team inspections Emergency Preparedness Exercise Problem Identification and Resolution Inspection Limited Scope Tactical Response Drills

St. Lucie PIs and Findings January 1 through December 31, 2020 All Green Performance Indicators No Findings Closed SCWE cross-cutting theme

NRC Plans for 2021 NRC plans baseline inspections at St. Lucie for the remainder of 2021 include:

Security Related Inspections Target Set Inspection Unit 2 In-service Inspection RP Occupational Radiation Safety Inspection Design Bases Assurance Inspection (Teams)

Inspection Requalification Inspection

NRC Annual Assessment Summary Turkey Point NextEra Energy / Florida Power & Light operated Turkey Point safely and in a manner that preserved the public health and safety and protected the environment.

Turkey Point Units 3 and 4 were in the Licensee Response Column (Column 1 of IMC 0305) of the NRCs ROP Action Matrix for the Calendar Year of 2020.

NRC Inspection Activities Turkey Point for 2020 Approximately 9,308 hours0.00356 days <br />0.0856 hours <br />5.092593e-4 weeks <br />1.17194e-4 months <br /> of inspection and related activities 2 Resident inspectors onsite for full-time inspection coverage throughout the year 9 Onsite inspections involving regional inspectors

NRC Inspection Activities Turkey Point for 2020 - continued.

3 major team inspections Design Bases Assurance Inspection (Team)

Cyber Security Inspection Special Inspection (NRC Inspection Report Nos. 05000250/2020050 AND 05000251/2020050- ML20241A055

Turkey Point PIs and Findings January 1 through December 31, 2020 All Green Performance Indicators 15 Green Non-cited violations and one Green Finding

NRC Plans for 2021 NRC plans baseline inspections at Turkey Point for the remainder of 2021.

This includes:

Security Inspection Requalification Inspection Unit 3 In-service Inspection

NRC Response to Mission Critical Functions Monitoring plant activities remotely through inspections and oversight Maintaining emergency response capabilities with Regional Incident Response Centers and the Headquarters Operational Center Limiting and risk-informing on-site inspections by residents and region-based inspectors

NRC Response to Additional Actions Expanded use of telework Ongoing review of Continuity of Operations Plan Coordinating actions with industry to minimize inspection impacts while protecting inspectors and plant staff

Getting in Touch with the NRC Website - www.nrc.gov Questions/Information -

OPA2.Resource@nrc.gov or 404-997-4417 Allegations 800-695-7403 or allegation@nrc.gov Employment - 301-415-7400 or www.usajobs.gov

NRC Social Media

  • GovDelivery:

https://service.govdelivery.com/accounts/USNRC/subscriber/new

End of Presentation Nuclear Regulatory Commission Region 2 Please submit questions or feedback regarding the meeting by emailing David.Dumbacher@nrc.gov David.Gasperson@nrc.gov