Calendar Year 2021 Security Baseline Completion MemoML22034A393 |
Person / Time |
---|
Site: |
Monticello, Harris, Wolf Creek, Point Beach, Grand Gulf, Arkansas Nuclear, Susquehanna, Columbia, Brunswick, Surry, Limerick, North Anna, Turkey Point, Callaway, Waterford, South Texas, Quad Cities, LaSalle |
---|
Issue date: |
02/16/2022 |
---|
From: |
Samson Lee Division of Security Operations |
---|
To: |
Christopher Regan NRC/NRR/DRO |
---|
taw |
Shared Package |
---|
ML22034A345 |
List: |
---|
References |
---|
Download: ML22034A393 (3) |
|
Similar Documents at Monticello, Harris, Wolf Creek, Point Beach, Grand Gulf, Arkansas Nuclear, Susquehanna, Columbia, Brunswick, Surry, Limerick, North Anna, Turkey Point, Callaway, Waterford, South Texas, Quad Cities, LaSalle |
---|
Category:Memoranda
MONTHYEARML24311A0052024-11-0707 November 2024 Audit Plan for the Staff Review of the NuScale Power, LLC Standard Design Approval Application - NuScale US460 Design - Related to Changes Made to the Application and Requests for Additional Information ML24299A2252024-11-0404 November 2024 ACRS Memo ASER NuScale FSER Chapters 3, 8, 14 ML24295A1302024-10-30030 October 2024 Summary of Public Meeting - Acu Molten Salt Research Reactor Material Control & Accounting White Paper Review ML24297A6392024-10-30030 October 2024 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML24275A2162024-10-25025 October 2024 Summary of Meeting Between the U.S. Nuclear Regulatory Commission and the Yak Tityu Tityu Yak Ti?Hini Northern Chumash Tribe Related to the Proposed License Renewal (Lr) for Diablo Canyon Power Plant Units 1 and 2 ML24284A0382024-10-22022 October 2024 Public Meetings to Receive Comments on the Draft Perry Plant EIS Meetings Summary Memo ML24242A0472024-10-17017 October 2024 1. User Need Memo for Amendment No. 9, and Revision to Amendment Nos. 6, 7, and 8, of the Renewed Certificate of Compliance No. 1025 for the NAC Multi-Purpose Canister System ML24276A1732024-10-15015 October 2024 Memorandum - Summary Meeting Between NRC and Holtec International to Discuss Pending Amendment Request for Model No. HI-STAR 80 Package ML24276A1822024-10-11011 October 2024 Memo and Enclosure 1 - Summary of August 28, 2024 Meeting for the Model No. Npc Package ML24192A2452024-10-0909 October 2024 Memo Meeting Summary Monticello Draft Environmental Impact Statement Monticello Public Meetings ML24277A0082024-10-0909 October 2024 Memo and Enclosure - Tn CoC 1004 Amendment No. 19 Pre-Application Meeting Summary ML24278A2752024-10-0909 October 2024 Summary of August 28, 2024 Meeting with Holtec ML24254A4092024-10-0808 October 2024 Memo - Summary of Meeting on August 28, 2024, with TRISO-X, LLC to Align on the Supplement Responses to the Management Measures and Quality Assurance Requests for Additional Information (Public) ML24255A3212024-10-0808 October 2024 Memo - Summary of Meeting on August 27, 2024 with TRISO-X to Discuss Draft Supplement Responses to Structural Programmatic Requests for Additional Information ML24267A2532024-09-27027 September 2024 August 20, 2024 Summary of Public Meeting Acu Molten Salt Research Reactor Material Control & Accounting White Paper ML24242A1282024-09-27027 September 2024 Summary of Observation Public Meeting on Status of NuScales US460 Standard Design Approval Application ML24268A0722024-09-24024 September 2024 Summary of August 28, 2024, Public Meeting to Discuss Cyber Security Regulatory Issues Regarding Wolf Creeks Implementation of Advanced Remote Monitoring Using Wireless ML24211A2392024-09-20020 September 2024 1. Rulemaking Memo Magnastor Issuance of Amendment No 14 and Revision of Amendment Nos. 0 Through 13 ML24260A0892024-09-19019 September 2024 Memo from B Von Till to Samantha Lav Regarding the Adequacy of the American Centrifuge Operating, LLC, Submission of the NRC Form 314 Certification ML24179A2732024-09-18018 September 2024 1. User Need Memo for Revision to Amendment Nos. 0, 1, and 2 of the Certificate of Compliance No. 1040 for the HI-STORM Umax Canister Storage System ML24262A0162024-09-18018 September 2024 Audit Plan for the Staff Review of the NuScale Power, LLC Standard Design Approval Application - NuScale US460 Design - Related to Documents That Support Confirmatory Evaluations and Request for Additional Information Responses ML24260A1772024-09-16016 September 2024 Referral of Petition to Intervene and Request for Hearing Regarding the Application for License Amendments from Holtec Decommissioning International, LLC, and Holtec Palisades, LLC for Palisades Nuclear Plant ML24228A1282024-09-0505 September 2024 Memo - Summary of Meeting on July 17, 2024, with TRISO-X to Align on the Supplemental Responses to the Management Measures and Quality Assurance Requests for Additional Information ML24206A0772024-09-0505 September 2024 Memorandum - Summary of Meeting Held on June 27, 2024 with TRISO-X LAR Structural Meeting ML24242A3212024-08-29029 August 2024 DOE - Issue Briefing Memo, Disposition of Rail Materials from Fernald ML24206A0452024-08-26026 August 2024 Memo - Summary of Meeting on June 17, 2024, with TRISO-X, Llc. to Discuss the Status of the License Application Review ML24198A2352024-08-26026 August 2024 Memorandum - Summary of Meeting Held on June 17 2024 with TRISO-X to Align on NRC Supplement Responses to Management Measures Requests for Additional Information ML24221A1382024-08-21021 August 2024 Summary of June 26, 2024, Meeting with TN-Americas LLC to Discuss Shielding Evaluation for Low-Level Waste in the NUHOMS MP197HBb ML24215A3602024-08-20020 August 2024 Summary of July 30, 2024 Meeting Between the NRC and TMI2Solutions Staff ML24229A1752024-08-19019 August 2024 University of New Mexico, Notice of Level 1 Change in Management Update at Unms AGN-201M ML24222A6992024-08-16016 August 2024 August 6, 2024, Summary of Regarding Potential License Amendment Request Change to Surveillance Requirements for Moderator Temperature Coefficient for Millstone, Unit No. 3, North Anna, Unit Nos. 1 and 2, and Summer, Unit No. 1 - ML24179A0642024-08-13013 August 2024 Memo - Summary of May 16, 2024, Partially Closed Pre-Application Public Meeting with Westinghouse Columbia Fuel Fabrication Facility ML24222A5972024-08-13013 August 2024 Summary of Public Scoping Meeting Related to the Environmental Scoping Process for the Us Sfr Owner, LLC Construction Permit for Kemmerer Unit 1 ML24221A0382024-08-12012 August 2024 Summary of Public Scoping Meeting Related to the Potential Reauthorization of Power Operations for the Palisades Nuclear Plant (EPID Number: L-2024-LNE-0003) (Docket Number: 50-0255) ML24220A1322024-08-11011 August 2024 ACRS Memo for Transmittal of NuScale Power, LLC, Safety Evaluation for Standard Design Approval Application Safety Analysis Report Chapters 7, 9, 12, and 18 ML24214A1402024-08-0505 August 2024 July 24, 2024, Summary of the Public Meeting Regarding Clinton Power Station, Unit 1, Partial Site Release ML24206A2422024-08-0303 August 2024 Memo - Summary of June 24 and 25, 2024, Pre-Application Meeting with Global Laser Enrichment, Llc.S Padcucah Laser Enrichment Facility ML24211A2222024-08-0202 August 2024 Summary of April 30, 2024, Meeting to Discuss Revalidation of Model Nos. JMS-87Y-18.5T and JRC-80Y-20T Packages ML24178A4022024-08-0101 August 2024 Memo - Summary of Meeting on May 24, 2024, with TRISO-X LLC, to Align on the Supplemental Responses to the Integrated Safety Analysis Requests for Additional Information ML24183A2022024-07-31031 July 2024 Memo - Summary of Meeting on June 6, 2024, with TRISO-X, LLC, to Align on the Supplement Responses to Integrated Safety Analysis Requests for Additional Information ML24211A0892024-07-29029 July 2024 Updated Audit Plan for the Staff Review of the NuScale Power, LLC Standard Design Approval Application - NuScale US460 Design ML24199A2072024-07-24024 July 2024 TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter ML24192A1662024-07-23023 July 2024 Summary of June 17, 2024 Pre-application Meeting for Amendment No. 19 to the HI-STORM 100 System ML24242A3202024-07-22022 July 2024 DOE - Disposition of Rail Road Materials at Moab Umtra Crescent Junction Disposal Site ML24199A0742024-07-19019 July 2024 Memo and Enclosure 1: Summary of June 20, 2024, Meeting with Holtec International ML24169A1852024-07-0909 July 2024 Memo: Summary of June 11, 2024, Telephone Call with Centrus-American Centrifuge Operating, LLC to Discuss NRC Questions for Environmental Assessment Regarding the Phase 2+ Amendment Request ML24185A0502024-07-0505 July 2024 Input for ACRS Review of Kairos Hermes 2 Non-Power Reactor Construction Permit Application - Draft Safety Evaluation for Chapter 5, Heat Transport Systems ML24185A0482024-07-0505 July 2024 Input for ACRS Review of Kairos Non-Power Reactor Hermes 2 Construction Permit Application - Safety Evaluation for Chapter 4, Reactor Description ML24185A0462024-07-0505 July 2024 Input for ACRS Review of Kairos 2 Construction Permit Application - Draft Safety Evaluation for Chapter 13, Accident Analysis ML24185A0442024-07-0505 July 2024 Input for ACRS Review of Kairos Non-Power Reactor Hermes 2 Construction Permit Application - Draft Safety Evaluation for Chapters 7, Instrumentation and Control Systems and 8, Electric Power Systems 2024-09-05 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Monticello]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Point Beach]] OR [[:Grand Gulf]] OR [[:Arkansas Nuclear]] OR [[:Susquehanna]] OR [[:Columbia]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:Callaway]] OR [[:Waterford]] OR [[:South Texas]] OR [[:Quad Cities]] OR [[:LaSalle]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Monticello]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Point Beach]] OR [[:Grand Gulf]] OR [[:Arkansas Nuclear]] OR [[:Susquehanna]] OR [[:Columbia]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:Callaway]] OR [[:Waterford]] OR [[:South Texas]] OR [[:Quad Cities]] OR [[:LaSalle]] </code>. |
Text
MEMORANDUM TO: Christopher Regan, Acting Director Division of Reactor Oversight Office of Nuclear Reactor Regulation FROM:
Samuel Lee, Acting Director Division of Security Operations Office of Nuclear Security and Incident Response
SUBJECT:
CALENDAR YEAR 2021 BASELINE INSPECTION COMPLETION This memorandum communicates that, consistent with a triennial frequency, the requisite baseline inspections for twelve of the eighteen sites were completed in calendar year (CY) 2021 under inspection procedure (IP) 71130.03, Contingency Response - Force-on-Force Testing (Agencywide Documents Access and Management System (ADAMS) Accession Number ML21012A329). For the remaining six sites, i.e., licensees with an approved hardship request IAW TSG-NSIR-2021-01 Additional Guidance for Force-on -Force Inspections During the Public Health Emergency, (ADAMS Accession No. ML21180A204), the baseline inspection was completed using IP 92707, Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force-on-force Exercises is Limited, (ADAMS Accession Number ML21019A452).
Twelve sites inspected under IP 71130.03 in 2021 were: Arkansas Nuclear One, Brunswick Steam Electric Plant, Callaway Plant, Columbia Generating Station, Grand Gulf Nuclear Station, Monticello Nuclear Generating Plant, Point Beach Nuclear Plant, Quad Cities Nuclear Power Station, Susquehanna Steam Electric Station, Turkey Point, Waterford Steam Electric Station, Wolf Creek Generating Station. Enclosure 1 reflects the completion status for each site as reported in the Reactor Programs System, Inspection Report 8. IP 71130.03 is considered complete with 1 sample. All CY 21 IP 71130.03 inspections were completed utilizing Addendum 5, Interim Guidance Related to the Implementation of Inspection Procedure 71130.03, Contingency Response - Force-on Force Testing, During the COVID-19 PHE, to the procedure.
Six sites were inspected under IP 92707 in 2021: LaSalle County Station, Limerick Generating Station, North Anna Power Station, Shearon Harris Nuclear Plant, South Texas Project, and Surry Power Station. Enclosure 2 reflects the completion status for these sites as reported in the Reactor Programs System. IP 92707 is considered complete with 1 sample.
CONTACT: Joshua Berry, NSIR/DSO/SPEB 301-287-3647 February 16, 2022 Signed by Lee, Samuel on 02/16/22
C. Regan 2
Due to the COVID-19 Public Health Emergency, the U.S. Nuclear Regulatory Commission (NRC) adjusted many of its planned inspection activities, including the triennial force-on-force (FOF) inspection conducted under IP 71130.03. Specific to FOF inspections, IP 92707 was revised and used for inspection in CY 2021. The revision to IP 92707 in 2021, promulgated the inspection procedure under Inspection Manual 2201, Appendix A, Security Baseline Inspection Program. The guidance in IP 92707 focused on conducting limited scope tactical response drills to verify and assess specific key elements of the licensees protective strategy to ensure that it has been appropriately developed and designed to meet the general performance objective of Title 10 of the Code of Federal Regulations (10 CFR) 73.55(b).
One site, BWX Technologies, Inc., was inspected under IP 96001, NRC Force-On-Force Inspections at Category 1 Fuel Cycle Facilities (ADAMS Accession Number ML19043A932). reflects the completion status of this inspection as reported in the Reactor Programs System. IP 96001 is considered complete with 2 samples.
Enclosures:
2021 IP 71130.03 IR Report 8 2021 IP 92707 IR Report 8 2021 IP 96001 IR Report 8
ML22034A345; ML22034A393 OFFICE NSIR/DSO/SPEB
/ETB NSIR/DSO/SOSB NSIR/DSO/SPEB
/ETA NSIR NAME JBerry JKeene JClark SLee DATE Feb 7, 2022 Feb 11, 2022 Feb 11, 2022 Feb 16, 2022