Text

Turkey Point Unit 3 and Unit 4 Reactor Protection System Engineered Safety Feature Actuation System Nuclear Instrumentation System Replacements Safety System Replacement Project LAR NRC 6th Pre-submittal Meeting Telecon July 22, 2021 OPEN MEETING 1 Non-proprietary information suitable for public disclosure

Agenda - Open and Closed Sessions

  • Open Session

- FPL License Amendment Request (LAR) Submittals

- Vendor Oversight Plan Update and Detail Discussion

- Next Pre-submittal Meeting Agenda Items

  • Closed Session

- Diverse Actuation System (DAS) Architecture and Reliability

- Leak-Before-Break Discussion on D3

- Modification Code Year Discussion for LAR 2 Non-proprietary information suitable for public disclosure

Introductions - Project Team

  • FPL Nuclear Licensing
  • Steve Catron - Licensing Fleet Manager
  • Jarrett Mack - Fleet Licensing Lead
  • David Stoia - Turkey Point Site Licensing Lead
  • Bill Maher - Improved Technical Specification Project Director
  • FPL Nuclear Engineering
  • Brian Dunn - Fleet Design Director
  • Phil Barnes - Design Engineering Manager
  • Wes Frewin - Fleet Digital Design Supervisor
  • Warren Busch - Project Engineer
  • Phillip Tiemann - Fuels / Safety Analysis
  • Ron Legrand - Project Manager
  • Brian Haynes - Licensing Lead
  • Taha Abdelnaeem - Engineering Lead
  • Ted Quinn - Licensing Engineer
  • Jerry Mauck - Licensing Engineer
  • Ron Jarrett - Licensing Engineer
  • Bill Hannaman - Licensing Engineer
  • Michael Howard - Safety Analysis
  • Tom Geary - Design Engineering
  • Sargent & Lundy -Third Party Review
  • Pareez Golub 3 Non-proprietary information suitable for public disclosure

FPL LAR Submittals

  • Follow-up to remarks on resource and schedule challenges

- 3 submittals under NRC review concurrently for PTN; two apply to PTN for ITS and RPS/ESFAS System Replacements

  • Improved Standard Technical Specification (ITS)

- Changes within scope of NUREG 1431, Rev. 5

- Regular communications with NRC TS Branch on scope control

  • RPS/ESFAS System Replacements

- LAR approval Fall 2022 provides confidence in planning for PTN Unit 3 Spring 2023 outage. FPL supports:

Minimize applications that are first time NRC reviews Frequent interaction before submittal and during reviews Quick turnaround on requests for information Open to discuss other time-savings measures 4 Non-proprietary information suitable for public disclosure

Vendor Oversight Plan Status Update

  • Plan issued, currently Revision 0, LAR summary in draft
  • Oversight of Framatome issued documents in progress

- Documented in comment resolution forms

- Traceable transmittals between Framatome and FPL

- Review task reconciling with production schedule activities

  • Audits and Inspections performed

- Performed at Lynchburg and Mansfield facilities

- Quality Assurance initial program audits

- Cyber Security inspection of Secure Development Environment

- Documented in Quality Assurance Reports 5 Non-Proprietary Information suitable for public disclosure

Vendor Oversight Plan and Summary Level of Detail Document Type Intended Process Level of detail intended to support LAR Summary Docketed, revised

  • Basis for safety evaluation only upon deviation determinations
  • Threshold for NRC notification of changes Vendor Available, updated
  • Basis for VOP LAR summary Oversight Plan during project
  • Planning of oversight activities, (VOP) schedule Identifiers
  • Document performed activities, roadmap Implementation Inspection, FPL
  • Specific document number and maintained revision documents
  • Specific reviewers
  • Comments and resolutions/acceptance
  • Corrective Action Program (not affecting LAR summary) 6 Non-Proprietary Information suitable for public disclosure

Vendor Oversight Plan Summary Detail (1 of 2)

Criteria/Content Evaluated for LAR Change (examples) Not impacting LAR summary Organization

  • Changes of oversight responsibility to
  • Changes to personnel Procedure different organization in defined roles structure
  • Oversight required outside the
  • Delegation of activities procedure structure Scope of
  • Document or task of a type listed in the
  • Adding documents or Activities summary is removed from scope of tasks of a type listed review
  • Document revisions
  • Addition of a significant document or
  • Changes to schedule task of a type not in summary
  • Combination of
  • Changes to the LAR that warrant documents into fewer update of VOP Summary Methods
  • Use of other than QA audits, comment
  • Transmittal of oversight resolution forms, reports with FPL related information or approval, or the corrective action results to vendor program to document oversight
  • Procedure revisions
  • Change to a procedure that effects that do not affect scope responsibility or relaxes acceptance or acceptance criteria criteria for an oversight task 7 Non-Proprietary Information suitable for public disclosure

Vendor Oversight Plan Summary Detail (2 of 2)

Criteria/Content Evaluated for LAR Change Not impacting LAR (examples) summary Acceptance

  • If oversight activities cannot be
  • Justified changes to criteria performed to completion or code and standards comprehensive of scope for applicable to a software development activities document
  • If vendor conformance to LAR
  • Changes to document stated implementation cannot specific acceptance be achieved. criteria Corrective
  • Corrective Action Program used
  • CR for defect in a Action to determine what actions document found after necessary. document issued final
  • CR to document the performance/results of an oversight activity end of topic 8 Non-Proprietary Information suitable for public disclosure

Future Pre-submittal Meeting Recommended Agenda Items

  • Open items
  • Equipment replacement scope outside Tricon SER
  • Command Prioritization
  • Human Factors Engineering and simulator schedule
  • Implementation Items
  • Attachments to the LAR 9 Non-proprietary information suitable for public disclosure

Thank you!

Questions/Comments?

10 Non-proprietary information suitable for public disclosure