Nextera/Fpl Presentation for March 7, 2022 Public Meeting Between NRC and Florida Power & Light Company to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 4
ML22063A126
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/04/2022
From:
Florida Power & Light Co
To: Marshall M
NRC/NRR/DORL/LPL2-2
Marshall M
References
EPID L-2022-LRM-0007
Download: ML22063A126 (10)


Text

Turkey Point Unit 3 and Unit 4 Reactor Protection System Engineered Safety Feature Actuation System Nuclear Instrumentation System Replacements Safety System Replacement Project LAR Eighth NRC Pre-submittal Meeting OPEN SESSION March 7, 2022 Non-proprietary information suitable for public disclosure 1

Agenda

  • OPEN SESSION
  • Participant Introduction
  • Background / meeting purpose
  • Implementation Outage Schedule
  • LAR supplements
  • Human Factors Plan Changes
  • CLOSED SESSION
  • Life Cycle Phase Schedule
  • Human Factors Information Availability
  • Comments / Questions 2 Non-proprietary information suitable for public disclosure

Introductions - On the Call today Florida Power & Light Contract and Support

  • FPL Nuclear Licensing
  • Steve Catron - Licensing Fleet Manager
  • Brian Haynes - Licensing Lead
  • Jarrett Mack - Fleet Licensing Lead
  • Jacek Novakowski - Human Factors
  • David Stoia - Turkey Point Licensing Lead Lead
  • Taha Abdelnaeem - Engineering Lead
  • Bill Maher - Improved Technical Specification Project Director
  • Ted Quinn - Licensing Engineer
  • Bill Hannaman - Licensing Engineer (HFE)
  • FPL Nuclear Engineering
  • Brian Dunn - Director - Fleet Design
  • Phillip Barnes - Design Manager
  • Sargent & Lundy (3rd Party review)
  • Wesley Frewin - Digital Design Supervisor
  • Pareez Golub
  • Erik Gonzalez - Simulator Engineer
  • John McCague
  • Warren Busch - Project Engineer
  • FPL PTN Operations
  • Jim Goodrich - Unit Supervisor Non-proprietary information suitable for public disclosure 3

Background/Meeting Purpose

  • License Amendment Request for Turkey Point Units 3 & 4 Reactor Protection, Engineered Safety Feature Actuation System, and Nuclear Instrumentation System Replacements
  • Seven Pre-submittal meetings to date discussing:

- Vendor Oversight Plan (1/13/21, 2/18/21, 4/8/21, 7/22/21, 8/23/21)

- ISG-06 Rev 2 process / LAR content (12/9/20, 1/13/21, 6/9/21, 7/22/21, 8/23/21)

- Protection System Architecture (2/18/21, 4/8/21)

- Human System Interface (12/9/20, 4/8/21)

- Human Factors Engineering Program Plan (12/9/20, 4/8/21, 8/25/21)

- Cyber Security (4/8/21)

- Surveillance Reduction (4/8/21, 8/25/21)

- Diversity and Design in Depth Evaluation (2/18/21, 6/9/21, 7/22/21, 8/25/21)

- Diverse Actuation System (2/18/21, 7/22/21 )

- Equipment Qualification and Dedication (8/25/21)

- LAR / Life Cycle Phase Schedule (2/18/21, 4/8/21, 6/9/21, 8/25/21)

  • Observation Meeting. Availability of Human Factors Engineering (HFE)

Information, 2/2/2022

  • Purpose is to update the schedule for replacement Protection System development and implementation, LAR and LAR supplement submittals and HFE activities Non-proprietary information suitable for public disclosure 4

Implementation Outage Schedule

  • Lead Unit 3 Installed in Fall 2024
  • Following Unit 4 Installed in Spring 2025
  • Requested SER Issuance 2nd Quarter 2024 TURKEY POINT UNITS 3&4 PROTECTION SYSTEM REPLACEMENT INSTALLATION TIMELINE 2024 2025 FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY Notes: Timeline resolution is Month to Month Durations and targets are for planning Outage duration is not representative Unit 3 6 Months RFO RFO (Refueling Outage) 334 U3 Equipment OnSite Requested SER Issuance Unit 4 6 Months RFO 435 U4 Equipment OnSite 5 Non-proprietary information suitable for public disclosure

Licensing Amendment Request (LAR) and Supplements

  • LAR Submittal (2nd Quarter 2022)

- ISG-06 Revision 2 basis for LAR content

  • LAR Supplements

- Surveillance Reduction (December 2022)

- Equipment Qualification (June 2023)

- ITS Tech Spec Mark-ups (October 2023)

  • Requested SER issuance (April 2024)

Non-proprietary information suitable for public disclosure 6

Human Factors Engineering - Plan Changes

  • Adjusted based on NRC review approach discussed 2/2/22
  • Recognition of Pre- and Post - Safety Evaluation Activities
  • Three successive, coordinated validation review points

- Conceptual Design Test - (PV1)

- Preliminary Design Test - (PV2)

- Integrated System Validation (ISV)

  • Combination of Full Scope Glass Top Simulator and modified U3 Certified Simulator
  • Tracking Human Engineering Deficiencies (HED)
  • Increase in Coordination

- NRC, pre-submittal and post-submittal meetings

- Idaho National Laboratories / Industry Non-proprietary information suitable for public disclosure 7

Full Scope Glass Top Simulator

  • Available for Project Use 4th Quarter 2022 Non-proprietary information suitable for public disclosure 8

Full Scope Glass Top Simulator

  • Development and Testing Activities

- Dynamic display testing with functional plant model

- Testing of critical scenarios and draft operating procedures

- Testing of time critical operator actions

- Testing of system and component level failures

- Procedure development

- Operator training (partial)

Non-proprietary information suitable for public disclosure 9

End of Open Session

  • Comments and Questions Non-proprietary information suitable for public disclosure 10