ML22098A093

From kanterella
Jump to navigation Jump to search

Nextera/Fpl Redacted Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (Public Version)
ML22098A093
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/13/2022
From:
Florida Power & Light Co
To: Marshall M
NRC/NRR/DORL/LPL2-2
Marshall M
References
Download: ML22098A093 (16)


Text

Turkey Point Unit 3 and Unit 4 Reactor Protection System Engineered Safety Feature Actuation System Nuclear Instrumentation System Replacements Safety System Replacement Project LAR NRC 9th Pre-submittal Meeting Telecon April 13, 2022 CLOSED MEETING 1

FRAMATOME INC. PROPRIETARY Pages 8 through 11 from this document (these pages are herein referred to as this document) are the property of Framatome Inc. (Framatome) or its affiliates and are to be considered proprietary and may not be reproduced or copied in whole or in part. This document shall not be furnished to others without the express written consent of Framatome and is not to be used in any way which is or may be detrimental to Framatome. This document and any copies that may have been made must be returned to Framatome upon request.

2

Agenda - Closed Session

  • License Amendment Request (LAR) Content
  • Alternate Review (AR) Process Deviations

- Pre-Submittal Defense-in-Depth and Diversity Submittal

- Supplements Scope Schedule

- Technical Specification Surveillance Reduction

  • Project Schedule Review

- HFE specific activities with emphasis on PV2

- Overall Phase Schedule

- SER requested issuance

  • Questions and Comments 3 Non-proprietary information suitable for public disclosure

Introductions - On the Call today Florida Power & Light Contract and Support

  • FPL Nuclear Licensing
  • Steve Catron - Licensing Fleet
  • Brian Haynes - Licensing Lead Director
  • Ted Quinn - Licensing Engineer
  • Jarrett Mack - Fleet Licensing Lead
  • Jacek Novakowski - Human Factors
  • FPL Nuclear Engineering Lead
  • Brian Dunn - Director - Fleet Design
  • Bill Hannaman - Licensing Engineer
  • Phillip Barnes - Design Manager (HFE)
  • Wesley Frewin - Digital Design Supervisor
  • Sargent & Lundy (3rd Party review)
  • Warren Busch - Project Engineer
  • Pareez Golub
  • FPL PTN Operations
  • John McCague
  • Jim Goodrich - Unit Supervisor 4 Non-proprietary information suitable for public disclosure

Submitted Documents per ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (1 of 4)

  • Intro/Justification/Safety Analysis
  • Detailed Description
  • Technical Evaluation

- Existing Plant System Description (D1)

- Existing and New Architecture (D2)

- New Safety System Equipment

- New System Functions (D2.3)

- Functional Allocation (D2.4)

- New Augmented Quality System Functions

- System Interfaces (D2.5)

- Defense-In-Depth and Diversity (D2.6)

- Setpoint Methodology and Calculations (D2.7)

- Response Time Performance 5 Non-proprietary information suitable for public disclosure

Submitted Documents per ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (2 of 4)

  • Technical Evaluation (Cont.)

- Summary System Development Process (D.4)

- Equipment Qualification (D.3)

- Applying a Referenced Topical Report (D.5)

- Tricon Plant Specific Action Items (D.5)

- Human Factors Engineering (B.1.4)

- Tests and Self Diagnostics

- System Failure Analysis

- Fundamental Design Principles in the new Architecture

- Compliance with IEEE Std. 603-1991 and IEEE 7-4.3.2-2003 (D.6)

- NRC ISG-04 Compliance Matrix

- Reliability

- Secure Development and Operational Environment (D.8) 6 Non-proprietary information suitable for public disclosure

Submitted Documents per ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (3 of 4)

  • Technical Evaluation (Cont.)

- Summary of Vendor Oversight Plan (C2.2)

- Technical Specification Surveillance Reduction (a non ISG-06 item)

  • Regulatory Evaluation Basis

- Applicable Regulatory Requirements/Criteria

- Precedent

- No Significant Hazards Consideration Analysis

- Environmental Consideration Analysis

- Conclusions 7 Non-proprietary information suitable for public disclosure

Submitted Documents per ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (4 of 4)

  • ATTACHMENTS

- Markup Technical Specification Pages

- Markup Technical Specification Bases (Information Only)

- Tricon Topical 4.3 and SVDU 2.0 Qualification Summary Reports

- RPS/ESFAS/NIS System Requirements Specification (SyRS)

- Technical Specification Surveillance Reduction Report/FMEDA

- Framatome Affidavit in support of Attachments

- Listing of Regulatory Commitments End of Topic 8 Framatome Proprietary Information - Withhold from Public Disclosure Per 10 CFR 2.390

Alternate Review Process Deviations 9 Non-proprietary information suitable for public disclosure

Human Factors Engineering - LAR Content 10 Non-proprietary information suitable for public disclosure

Project Schedule 11 Non-proprietary information suitable for public disclosure

Action Items and Follow-up for April 13th Closed Meeting

  • Action Items and Follow-up 12 Non-proprietary information suitable for public disclosure

Questions?

13 Non-proprietary information suitable for public disclosure

Acronym List Alternate Review AR Conceptual Design Test PV1 Defense-in-Depth and Diversity D3 Engineered Safety Features Actuation System ESFAS Failure Modes, Effects and Diagnostic Analysis FMEDA Florida Power and Light FPL Human Factor Engineering HFE Institute of Electrical and Electronic Engineers IEEE Integrated System Validation ISV Interim Staff Guidance ISG License Amendment Request LAR 14 Non-proprietary information suitable for public disclosure

Acronym List (continued)

Nuclear Instrumentation System NIS Nuclear Regulatory Commission NRC Preliminary Design Test PV2 Reactor Protection System RPS Safety Evaluation Report SER System Requirements Specification SyRS Safety Visual Display Unit SVDU Turkey Point PTN Vendor Oversight Program VOP 15 Non-proprietary information suitable for public disclosure

Any reproduction, alteration, transmission to any third party or publication in whole or in part of this document and/or its content is prohibited unless Framatome has provided its prior and written consent.

This document and any information it contains shall not be used for any other purpose than the one for which they were provided. Legal action may be taken against any infringer and/or any person breaching the aforementioned obligations 16