Independent Spent Fuel Storage Installation Physical Security Plan and Verification of ASM Incorporation
ML111710109
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/22/2011
From: Wastler S
NRC/NSIR/DSP/DDMS/MWISB
To: Eric Benner
NRC/NMSS/SFST/LID/RIOB
Garner Douglas 415-6786
References
IR-11-407
Download: ML111710109 (2)


Text

June 22, 2011 MEMORANDUM TO: Eric Benner, Branch Chief Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards FROM: Sandra Wastler, Branch Chief /RA/

Materials Waste and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF THE TURKEY POINT NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION PHYSICAL SECURITY PLAN AND VERIFICATION OF ASM INCORPORATION On June 2, 2011, a Security Inspection conducted by Douglas Garner, Physical Security Specialist from U.S. Nuclear Regulatory Commission (NRC) Headquarters verified that the Independent Spent Fuel Storage Installation located at the Turkey Point Nuclear Power Plant has successfully met the objectives outlined in the TI 2690/009 and IP 81311. The Inspection Report numbers for this report are 05000250/2011407 and 05000251/201407. Based on our review, we have determined that the Turkey Point Nuclear Power Plant Physical Security Plan has met the performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55, the October 2002 order and the Additional Security Measures imposed by the NRC.

CONTACT: Douglas Garner, DSP/NSIR (301) 415-6786

June 22, 2011 MEMORANDUM TO: Eric Benner, Branch Chief Rules, Inspections, and Operations Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards FROM: Sandra Wastler, Branch Chief /RA/

Materials Waste and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF THE TURKEY POINT NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION PHYSICAL SECURITY PLAN AND VERIFICATION OF ASM INCORPORATION On June 2, 2011, a Security Inspection conducted by Douglas Garner, Physical Security Specialist from U.S. Nuclear Regulatory Commission (NRC) Headquarters verified that the Independent Spent Fuel Storage Installation located at the Turkey Point Nuclear Power Plant has successfully met the objectives outlined in the TI 2690/009 and IP 81311. The Inspection Report numbers for this report are 05000250/2011407 and 05000251/201407. Based on our review, we have determined that the Turkey Point Nuclear Power Plant Physical Security Plan has met the performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55, the October 2002 order and the Additional Security Measures imposed by the NRC.

CONTACT: Douglas Garner, DSP/NSIR (301) 415-6786 DISTRIBUTION:

DSP r/f ADAMS Accession No.: ML111710109 OFFICE DSP/MWISB MWISB/BC NAME D. Garner S. Wastler DATE 06/ 22 /11 06/ 22 /11 OFFICAL RECORD COPY