Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARPMNS20201328, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2020-12-0909 December 2020 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML20338A0472020-12-0909 December 2020 December 9, 2020 FPL Slides Rps/Esfas Nuclear Instrumentation Project stage: Request PMNS20201397, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2020-12-16016 December 2020 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21011A2382021-01-11011 January 2021 Slides for January 13, 2021 Presubmittal Meeting with NextEra Concerning Digital I&C Closed Non-Proprietary Project stage: Request ML21011A2232021-01-22022 January 2021 Requests for Withholding Information from Public Disclosure Project stage: Other PMNS20210136, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-02-0404 February 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21047A2102021-02-16016 February 2021 NRC Presubmittal Meeting Telecon February 18, 2021 Open Meeting - FPL Safety System Replacement Project LAR - Nonproprietary Project stage: Meeting PMNS20210305, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade at Turkey Point Nuclear Generating, Unit Nos. 3 and 42021-03-29029 March 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade at Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Project stage: Request ML21054A0012021-03-29029 March 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade Project stage: Meeting ML21096A0772021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification Project stage: Request ML21096A0612021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification - Open Project stage: Request ML21099A1052021-04-23023 April 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance PMNS20210737, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-05-28028 May 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21159A1652021-06-0404 June 2021 Affidavit for Nextera Tricon Presentation for Turkey Point 5th Presubmittal Meeting Project stage: Meeting ML21159A1892021-06-0909 June 2021 Non-Proprietary - FPL NRC Presubmittal Meeting June 9th Closed Slides Project stage: Meeting ML21159A1712021-06-0909 June 2021 FPL NRC Presubmittal Meeting June 10th Week Open Session Project stage: Meeting ML21176A0102021-06-29029 June 2021 Summary of Drop-in Meeting with NextEra-Florida Power and Light to Discuss Pending Submittals Related to Digital Instrumentation and Controls and Improved Standard Technical Specifications for Turkey Point Nuclear Plant, Units 3 & 4 (EPID L Project stage: Meeting ML21172A2712021-06-29029 June 2021 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Withholding Request Acceptance PMNS20210933, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-07-12012 July 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21200A1472021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Closed Public Project stage: Request ML21200A1562021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Open Project stage: Request ML21190A1862021-08-0202 August 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point Units 3 and 4 Project stage: Meeting ML21232A0172021-08-20020 August 2021 Licensees Non-Proprietary Presentation (2 of 2) for August 23 and 25, 2021 Public Meeting Project stage: Meeting ML21279A0962021-08-20020 August 2021, 23 August 2021, 15 October 2021 Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 Project stage: Request ML21235A0932021-08-23023 August 2021 Licensees Non-Proprietary Presentation (1 of 2) for August 23 and 25, 2021 Public Meeting Project stage: Meeting PMNS20211047, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control License Amendment Request for Turkey Point Nuclear Generating Unit Nos. 3 and 42021-08-23023 August 2021 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control License Amendment Request for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Meeting ML21279A0432021-10-15015 October 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 Project stage: Meeting ML21246A0212021-11-23023 November 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point Units 3 and 4 Project stage: Meeting ML21214A1192021-11-23023 November 2021 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Withholding Request Acceptance ML21302A0052021-12-23023 December 2021 Email to Nextera/Fpl Re Discussion of Availability of Human Factor Validation Information to Support the Planned Turkey Point Digital I&C License Amendment Request Project stage: Other PMNS20220162, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 42022-02-25025 February 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 4 Project stage: Meeting ML22063A4482022-03-0202 March 2022 Nextera/Fpl Affidavit for Proprietary Presentation for March 7, 2022, Public Meeting Project stage: Meeting ML22082A2222022-03-23023 March 2022 Terrapower Slide Presentation for Met Tower Water Supply Public Meeting Project stage: Request PMNS20220150, Pre-application Meeting with Terrapower to Discuss the Meteorological Data and Plant Water Source for the Natrium Plant Design2022-03-28028 March 2022 Pre-application Meeting with Terrapower to Discuss the Meteorological Data and Plant Water Source for the Natrium Plant Design Project stage: Meeting ML22101A2042022-04-0606 April 2022 Nextera/Fpl Affidavit for Proprietary Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request Project stage: Meeting ML22101A2262022-04-11011 April 2022 NRC Staff Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request Project stage: Meeting ML22098A0932022-04-13013 April 2022 Nextera/Fpl Redacted Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (Public Version) Project stage: Meeting ML22098A0902022-04-13013 April 2022 Nextera/Fpl Non-Proprietary Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (EPID L-2021-LRM-0007) (Slides) Project stage: Meeting ML22129A1812022-05-11011 May 2022 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 Project stage: Meeting ML22137A2512022-05-19019 May 2022 Summary of Pre-Application Meeting with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 Project stage: Meeting ML22189A2092022-07-20020 July 2022 March 30, 2022, Summary of Public Meeting with Terrapower, LLC to Discuss the Meteorological Data and Plant Water Source for the Natrium Reactor Project stage: Meeting 2021-06-09
[Table View] |
Text
1 Turkey Point Unit 3 and Unit 4 Reactor Protection System Engineered Safety Feature Actuation System Nuclear Instrumentation System Replacements Non-proprietary information suitable for public disclosure Safety System Replacement Project LAR NRC 6th Pre-submittal Meeting Telecon July 22, 2021 CLOSED MEETING
2 Agenda - Closed Portion
- Diverse Actuation System Architecture and Reliability
- Modification Code Year Discussion for LAR
- Project LAR and Life Cycle Update
- Action Items/Follow-up Non-proprietary information suitable for public disclosure
3 Diverse Actuation System (DAS) Background Diverse Actuation System Non-proprietary information suitable for public disclosure
4 DCS/DAS Architecture (Conceptual)
Non-proprietary information suitable for public disclosure
5 DAS System Inputs (Conceptual)
Non-proprietary information suitable for public disclosure
6 DAS System Output Logic (Conceptual)
Non-proprietary information suitable for public disclosure
7 DCS/DAS Reliability DCS Experience Reliability Features Non-proprietary information suitable for public disclosure
8 DCS Application Features DAS Application Features end of topic DCS/DAS Reliability Non-proprietary information suitable for public disclosure
9 Leak-Before Break Analysis for PTN 3&4 D3 Report in accordance with BTP 7-19, Rev 8 Large Break LOCA Event (UFSAR Section 14.3.2.1)
- Automatic DAS actuation not required by D3 because of crediting Leak-Before Break (LBB)
Supported by NRC Safety Evaluation Report (ML19310D777),
approved Dec. 4, 2019 for Section 4.7.3 (ML19310D777), LBB Analysis for Reactor Coolant System Piping and 4.7.4, LBB Analysis for Class 1 Aux Piping (ADAMS No. ML19191A057)
The evaluation addresses all potential pipe breaks sized 10 inches or above.
Review of primary piping identified no intermediate pipe sizes susceptible to breaks or cracking between 4 and 10 inches.
Non-proprietary information suitable for public disclosure
10 Leak-Before Break Analysis for PTN 3&4 D3 Report Large Break LOCA Event All piping locations considered in the LBB evaluation, approved by NRC, exhibit a minimum leakage rate of 10 GPM.
NUREG-1061 Vol. 3 recommends that the leakage detection system be capable of measuring 1/10th of the minimum leakage rate. TP 3&4 plant leak detection capability SER approved at 1 GPM.
Small Break LOCA Event (UFSAR Section 14.3.2.2) end of topic Non-proprietary information suitable for public disclosure
11 Modification Code Year Discussion in RPS/ESFAS/NIS LAR Major Codes and Standards Commitment Listing No.
Code and Standard No.
Title NUREG-0800 Rev 6 Chapter 7 Appendix 7.1-A,C,D or Chapter 3.10 (2016) or 3.11 (2007)
Project Commitment Justification:
Non-proprietary information suitable for public disclosure
12 No.
Code and Standard No.
Title NUREG-0800 Rev 6 Chapter 7 Appendix 7.1-A,C,D or Chapter 3.10 (2016) or 3.11 (2007)
Project Commitment Justification:
Modification Code Year Discussion in RPS/ESFAS/NIS LAR Major Codes and Standards Commitment Listing (continued)
Non-proprietary information suitable for public disclosure
13 No.
Code and Standard No.
Title NUREG-0800 Rev 6 Chapter 7 Appendix 7.1-A,C,D or Chapter 3.10 (2016) or 3.11 (2007)
Project Commitment Justification:
Modification Code Year Discussion in RPS/ESFAS/NIS LAR Major Codes and Standards Commitment Listing (continued)
Non-proprietary information suitable for public disclosure
14 end of topic Modification Code Year Discussion in RPS/ESFAS/NIS LAR Major Codes and Standards Commitment Listing (continued)
No.
Code and Standard No.
Title NUREG-0800 or ISG-06 R/2 Project Commitments Justification Non-proprietary information suitable for public disclosure
15 end of topic Modification Code Year Discussion in RPS/ESFAS/NIS LAR Major Codes and Standards Commitment Listing (continued)
No.
Code and Standard No.
Title NUREG-0800 or ISG-06 R/2 Project Commitments Justification Non-proprietary information suitable for public disclosure
16 Project LAR and Lifecycle Schedule LAR Submittal target Schedule is September, 2021 Design Phase
- August 2021 through November 2021 Equipment Qualification Schedule
- July 2021 through January 2022 Implementation Phase
- October 2021 through April 2022 Factory Acceptant Testing
- May 2022 through October 2022 Human Factor Engineering (HFE)
- April 2021 through October 2022 Non-proprietary information suitable for public disclosure
17 Action Items/Follow-Up Future Meeting Subjects Open items Equipment replacement scope outside Tricon SER Command Prioritization Commercial grade dedication/qualification status Human Factors Engineering and simulator schedule Implementation Items Attachments to the LAR Remaining Follow-up Items Non-proprietary information suitable for public disclosure
18 Questions?
Non-proprietary information suitable for public disclosure
19 Acronym List Non-proprietary information suitable for public disclosure ATWS Mitigation System Actuation Circuitry AMSAC Alternate Review AR Anticipated Transient Without Scram ATWS Branch Technical Position BTP Control Processor CP Diverse Actuation System DAS Defense-in-Depth and Diversity D3 Distributed Control System DCS Engineered Safety Features Actuation System ESFAS Florida Power and Light FPL Feedwater Isolation FWI Human Factors engineering HFE Instrumentation and Control I&C
20 Acronym List (continued)
Non-proprietary information suitable for public disclosure Institute of Electrical and Electronic engineers IEEE Interim Staff Guidance ISG Improved Technical Specifications ITS Leak-Before-Break LBB License Amendment Request LAR Nuclear Instrumentation System NIS Nuclear Regulatory Commission NRC Operator Workstation OWS Regulatory Guide RG Quality Assurance QA
21 Reactor Protection System RPS Residual Heat Removal RHR Safety Evaluation Report SER Safety Injection SI Safety Related SR Safety Requirements Memoranda SRM Standard Review Plan SRP System Requirements Specification SyRS Safety Visual Display Unit SVDU Software Common Cause Failure SWCCF Subsequent License Renewal SLR Turkey Point PTN Vendor Oversight Program VOP Non-proprietary information suitable for public disclosure Acronym List (continued)
22 Any reproduction, alteration, transmission to any third party or publication in whole or in part of this document and/or its content is prohibited unless Framatome has provided its prior and written consent.
This document and any information it contains shall not be used for any other purpose than the one for which they were provided. Legal action may be taken against any infringer and/or any person breaching the aforementioned obligations