Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARPMNS20201328, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2020-12-0909 December 2020 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML20338A0472020-12-0909 December 2020 December 9, 2020 FPL Slides Rps/Esfas Nuclear Instrumentation Project stage: Request PMNS20201397, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2020-12-16016 December 2020 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21011A2382021-01-11011 January 2021 Slides for January 13, 2021 Presubmittal Meeting with NextEra Concerning Digital I&C Closed Non-Proprietary Project stage: Request ML21011A2232021-01-22022 January 2021 Requests for Withholding Information from Public Disclosure Project stage: Other PMNS20210136, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-02-0404 February 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21047A2102021-02-16016 February 2021 NRC Presubmittal Meeting Telecon February 18, 2021 Open Meeting - FPL Safety System Replacement Project LAR - Nonproprietary Project stage: Meeting PMNS20210305, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade at Turkey Point Nuclear Generating, Unit Nos. 3 and 42021-03-29029 March 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade at Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Project stage: Request ML21054A0012021-03-29029 March 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade Project stage: Meeting ML21096A0772021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification Project stage: Request ML21096A0612021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification - Open Project stage: Request ML21099A1052021-04-23023 April 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance PMNS20210737, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-05-28028 May 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21159A1652021-06-0404 June 2021 Affidavit for Nextera Tricon Presentation for Turkey Point 5th Presubmittal Meeting Project stage: Meeting ML21159A1892021-06-0909 June 2021 Non-Proprietary - FPL NRC Presubmittal Meeting June 9th Closed Slides Project stage: Meeting ML21159A1712021-06-0909 June 2021 FPL NRC Presubmittal Meeting June 10th Week Open Session Project stage: Meeting ML21176A0102021-06-29029 June 2021 Summary of Drop-in Meeting with NextEra-Florida Power and Light to Discuss Pending Submittals Related to Digital Instrumentation and Controls and Improved Standard Technical Specifications for Turkey Point Nuclear Plant, Units 3 & 4 (EPID L Project stage: Meeting ML21172A2712021-06-29029 June 2021 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Withholding Request Acceptance PMNS20210933, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-07-12012 July 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21200A1472021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Closed Public Project stage: Request ML21200A1562021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Open Project stage: Request ML21190A1862021-08-0202 August 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point Units 3 and 4 Project stage: Meeting ML21232A0172021-08-20020 August 2021 Licensees Non-Proprietary Presentation (2 of 2) for August 23 and 25, 2021 Public Meeting Project stage: Meeting ML21279A0962021-08-20020 August 2021, 23 August 2021, 15 October 2021 Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 Project stage: Request ML21235A0932021-08-23023 August 2021 Licensees Non-Proprietary Presentation (1 of 2) for August 23 and 25, 2021 Public Meeting Project stage: Meeting PMNS20211047, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control License Amendment Request for Turkey Point Nuclear Generating Unit Nos. 3 and 42021-08-23023 August 2021 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control License Amendment Request for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Meeting ML21279A0432021-10-15015 October 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 Project stage: Meeting ML21246A0212021-11-23023 November 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point Units 3 and 4 Project stage: Meeting ML21214A1192021-11-23023 November 2021 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Withholding Request Acceptance ML21302A0052021-12-23023 December 2021 Email to Nextera/Fpl Re Discussion of Availability of Human Factor Validation Information to Support the Planned Turkey Point Digital I&C License Amendment Request Project stage: Other PMNS20220162, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 42022-02-25025 February 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 4 Project stage: Meeting ML22063A4482022-03-0202 March 2022 Nextera/Fpl Affidavit for Proprietary Presentation for March 7, 2022, Public Meeting Project stage: Meeting ML22082A2222022-03-23023 March 2022 Terrapower Slide Presentation for Met Tower Water Supply Public Meeting Project stage: Request PMNS20220150, Pre-application Meeting with Terrapower to Discuss the Meteorological Data and Plant Water Source for the Natrium Plant Design2022-03-28028 March 2022 Pre-application Meeting with Terrapower to Discuss the Meteorological Data and Plant Water Source for the Natrium Plant Design Project stage: Meeting ML22101A2042022-04-0606 April 2022 Nextera/Fpl Affidavit for Proprietary Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request Project stage: Meeting ML22101A2262022-04-11011 April 2022 NRC Staff Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request Project stage: Meeting ML22098A0932022-04-13013 April 2022 Nextera/Fpl Redacted Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (Public Version) Project stage: Meeting ML22098A0902022-04-13013 April 2022 Nextera/Fpl Non-Proprietary Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (EPID L-2021-LRM-0007) (Slides) Project stage: Meeting ML22129A1812022-05-11011 May 2022 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 Project stage: Meeting ML22137A2512022-05-19019 May 2022 Summary of Pre-Application Meeting with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 Project stage: Meeting ML22189A2092022-07-20020 July 2022 March 30, 2022, Summary of Public Meeting with Terrapower, LLC to Discuss the Meteorological Data and Plant Water Source for the Natrium Reactor Project stage: Meeting 2021-06-09
[Table View] |
Text
1 Turkey Point Unit 3 and Unit 4 Reactor Protection System Engineered Safety Feature Actuation System Nuclear Instrumentation System Replacements Non-proprietary information suitable for public disclosure Safety System Replacement Project LAR NRC 7th Pre-submittal Meeting Telecon August 23 and August 25, 2021 OPEN SESSION
2
- Steve Catron - Licensing Fleet Manager
- Jarrett Mack - Fleet Licensing Lead
- David Stoia - Turkey Point Site Licensing Lead
- Brian Dunn - Fleet Design Director
- Phil Barnes - Design Engineering Manager
- Wes Frewin - Fleet Digital Design Supervisor
- Warren Busch - Project Engineer
- Philip Tiemann - Fuels / Safety Analysis
- Jim Goodrich - Operations Unit Supervisor
- Ron Legrand - Project Manager
- Brian Haynes - Licensing Lead
- Ted Quinn - Licensing Engineer
- Jerry Mauck - Licensing Engineer
- Ron Jarrett - Licensing Engineer
- Michael Howard - Safety Analysis
- Jacek Nowakowski - Human Factors
- Troy Soaper - Equipment Qualification
- Mark Harvey-Director of Quality Assurance
- McKeag Johnson - NIS Design Engineer
- Sargent & Lundy -Third Party Review
- Pareez Golub Introductions - Project Team Non-proprietary information suitable for public disclosure
3 Agenda - Open and Closed Sessions Open Session
- Vendor Oversight Plan and LAR Summary
- Documents to be Submitted and Documents Available
- Follow-up - Open Items Closed Session
- Components not Addressed in Approved SER
- Equipment Qualification and Dedication
- Human Factors Engineering Program Update
- Application of Leak Detection in D3 Evaluation
- Command Prioritization
- Surveillance Reduction Activities
- Schedule Update
- Action Items and Follow-up Non-proprietary information suitable for public disclosure
4 Vendor Oversight Plan - Table of Contents Non-proprietary information suitable for public disclosure
5 Vendor Oversight Plan / LAR VOP Summary - Scope Vendor Oversight Plan VOP LAR Summary (Draft)
Non-proprietary information suitable for public disclosure
6 Control of Vendor Oversight Plan / LAR Summary Vendor Oversight Plan VOP LAR Summary (Draft)
7 Vendor Oversight Plan / Summary Interfaces Non-proprietary information suitable for public disclosure Vendor Oversight Plan VOP LAR Summary (Draft)
8 Vendor Oversight Plan - Document Reviews VOP Attachment 3 Provides:
- Specific Documents to be reviewed
- Schedule Task Identification for the activity
- Reference to documentation of completion of the oversight activity
- Updated based on planning changes, completion of tasks Example of Attachment 3 showing 6 of 202 documents Non-proprietary information suitable for public disclosure
9 Vendor Oversight - Traceability Letter Number tracking References to specific transmittal of documents Comment Resolution Sheets with resolution acceptance attached end of topic
10 Documents to be Submitted and Documents Available FPL/Framatome has plans for 3 different classifications for documents included in or associated with the LAR:
- Items to be submitted and docketing with the LAR
- Items to be available through access for remote viewing
- Items subject to audit or inspection All documents can be audited or inspected by the NRC.
- Protocol for exchange of documents Non-proprietary information suitable for public disclosure
11 Submitted Documents based ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (1 of 3)
Intro/Justification/Safety Analysis Detailed Description Technical Evaluation
- Existing Plant System Description (D1)
- Existing and New Architecture (D2)
- New Safety System Equipment
- New System Functions (D2.3)
- Functional Allocation (D2.4)
- New Augmented Quality System Functions
- System Interfaces (D2.5)
- Defense-In-Depth and Diversity (D2.6)
- Setpoint Methodology and Calculations (D2.7)
- Response Time Performance Non-proprietary information suitable for public disclosure
12 Submitted Documents based ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (2 of 3)
Technical Evaluation (Cont.)
- Summary System Development Process (D.4)
- Equipment Qualification (D.3)
- Applying a Referenced Topical Report (D.5)
- Tricon Plant Specific Action Items (D.5)
- Human Factors Engineering (B.1.4)
- Tests and Self Diagnostics
- System Failure Analysis
- Fundamental Design Principles in the new Architecture
- Compliance with IEEE Std. 603-1991 and IEEE 7-4.3.2-2003 (D.6)
- NRC ISG-04 Compliance Matrix
- Reliability
- Secure Development and Operational Environment (D.8)
Non-proprietary information suitable for public disclosure
13 Technical Evaluation (Cont.)
- Summary of Vendor Oversight Plan (C2.2)
- Technical Specification Surveillance Reduction (a non ISG-06 item)
Regulatory Evaluation Basis
- Applicable Regulatory Requirements/Criteria
- Precedent
- No Significant Hazards Consideration Analysis
- Environmental Consideration Analysis
- Conclusions Submitted Documents based ISG-06, Rev 2 AR Process RPS/ESFAS/NIS LAR Table of Contents (3 of 3)
Non-proprietary information suitable for public disclosure
14 Available Documents LAR ATTACHMENTS
- Markup Technical Specification Pages
- Markup Technical Specification Bases (Information Only)
- Equipment Qualification Plan and Available Summary Reports
- Defense-In-Depth and Diversity Analysis (D3)
- HFE Program Plan
- RPS/ESFAS/NIS System Requirements Specification (SyRS)
- Technical Specification Surveillance Reduction Report
- Framatome Affidavit in support of Attachments
- Listing of Implementation Items No Identified New Regulatory Commitments Non-proprietary information suitable for public disclosure
15 Documents for NRC Inspection and Audit (1 of 2)
Vendor Oversight Plan Lifecycle Plans including:
- Project Quality Plan
- Project Management Plan
- Software Quality Assurance Plan
- Software Verification and Validation Plan
- Software Configuration Management Plan
- Software Safety Plan
- Software Development Plan
- Software Integration Plan
- Verification and Validation Test Plan Lifecycle Development Products including:
- Software Requirements Specifications
- Hardware Requirements Specifications
- Software Design Descriptions
- Factory Acceptance Test Procedures Design Documents including:
- Drawings (Architecture, logic, wiring, etc.)
- Calculations (Setpoints, Time Response, Reliability, etc.)
- System Failure Modes and Effects Analysis Non-proprietary information suitable for public disclosure
16 Documents for NRC Inspection and Audit (2 of 2)
HFE Project Plans and Plan Deliverables including:
- Implementation and verification and validation Plans
- Function, Task, and Operating Experience Analyses
- Task Level Implementation Plans and Results Summary Reports Qualification and Commercial Grade Dedication Plans and Plan Deliverables:
- Dedication and Test Procedures
- Test Reports
- Qualification and Commercial Grade Dedication Summary Reports Cybersecurity Plan and Procedures:
- Secure Development and Operating Environment Procedures
- Component vulnerability mitigation assessments FSAR Markups end of topic Non-proprietary information suitable for public disclosure
17 Questions, Comments, and Follow-up Items Non-proprietary information suitable for public disclosure