ML22154A511

From kanterella
Jump to navigation Jump to search

Summary of May 19, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request
ML22154A511
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/07/2022
From: Michael Mahoney
NRC/NRR/DORL/LPL2-2
To:
Florida Power & Light Co, Nextera Energy
Mahoney M, NRR/DORL/LPL2-2
Shared Package
ML22117A011 List:
References
EPID No. L-2021-LLI-0002
Download: ML22154A511 (4)


Text

June 7, 2022 LICENSEE: Florida Power and Light/NextEra FACILITIES: Turkey Point Nuclear Generating Unit Nos. 3 and 4

SUBJECT:

SUMMARY

OF MAY 19, 2022, MEETING WITH FLORIDA POWER AND LIGHT/NEXTERA ON TURKEY POINT IMPROVED TECHNICAL SPECIFICATION CONVERSION LICENSE AMENDMENT REQUEST (EPID NO. L-2021-LLI-0002)

On May 19, 2022, a virtual Observation public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Florida Power and Light/NextEra (FPL, the licensee). The purpose of the meeting was to discuss the license amendment request (LAR) for Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point) to convert to improved standard technical specifications in accordance with NUREG-1432, Combustion Engineering Plants, Revision 5 (improved technical specification (ITS) Revision 5). The meeting notice and agenda, dated April 27, 2022, are available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML22117A011. A list of attendees is provided in the Enclosure.

The following items were discussed during the meeting:

Shared systems interdependencies in proposed ITS 3.8.4.

Questions regarding proposed ITS 3.3.5, related to current technical specification (CTS) requirements.

Use of term Required Actions (can be referred to as default actions) in the TS Bases, for example D.1 in TS Bases 3.1.6.

Members of the public were not in attendance.

Please direct any inquiries to me at 301-415-3867, or Michael.Mahoney@nrc.gov.

/RA/

Michael Mahoney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES MAY 19, 2022, PUBLIC MEETING WITH FPL/NEXTERA IMPROVED STANDARD TECHNICAL SPECIFICATION CONVERSION Name Organization Michael Mahoney U.S. Nuclear Regulatory Commission (NRC)

Victor Cusumano NRC Caroline Tilton NRC Clinton Ashley NRC Craig Harbuck NRC Khadijah West NRC Andrea Russell NRC Robert Elliott NRC Matthew Hamm NRC Tarico Sweat NRC William Maher Florida Power and Light Company (FPL)

Steve Franzone FPL Michael Coen FPL Gregg Ellis Excel Services Corporation (Excel)

Christina Long Excel Jerry Riste Excel Charles DeDeaux Excel Enclosure

Package: ML22154A499 Meeting Notice: ML22117A011 Meeting Summary: ML22154A511 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NAME MMahoney RButler DWrona DATE 06/07/2022 06/07/2022 06/07/2022