Summary of August 25, 2021 Observation Public Meeting with FPL to Discuss Proposed Alternative Report for the Intake Cooling Water System
ML21327A180
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/07/2021
From: Ellen Brown
Plant Licensing Branch II
To:
Florida Power & Light Co
Brown E
References
EPID L-2021-LRM-0080
Download: ML21327A180 (3)


Text

December 7, 2021

LICENSEE: Florida Power & Light Company, et al.

FACILITY: Turkey Point Nuclear Generating Unit No. 3

SUBJECT:

SUMMARY

OF AUGUST 25, 2021 PARTIALLY CLOSED MEETING WITH FLORIDA POWER AND LIGHT TO DISC USS PROPOSED ALTERNATIVE FOR THE UNIT 3 INTAKE COOLING WATER SYSTEM (EPID: L-2021-LRM-0080)

On August 25, 2021 a partially closed observation meeting was held virtually between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Florida Power & Light Company, et al. The purpose of the meeting was to discuss the proposed submittal of an application to request approval for a repair to identified damage on the Turkey Point Nuclear Generation Station (TPN) Unit 3 intake cooling water (ICW) discharge line spool piece. The meeting notice and agenda, dated August 10, 2021, are available in the Agencywide Documents Access and Management System (A DAMS) at Accession No. ML21222A037. The licensee presented information (ADAMS Accession No. ML21237A009). A list of attendees is provided in the Enclosure.

The licensee provided an overview of the current status of the system and the results of the licensees prompt operability determination. Given that back in April the licensee had declared that the system was considered operable but degraded, options for its repair where being developed. The licensee discussed three options. The first was the removal of the flaw by drilling and tapping the cast iron piping and then installing a threaded solid plug. This option would not need prior NRC approval. The second option was to restore the ICW piping flange to its original design by replacing the bolted flange spool. The third method was the installation of bolted clamp assembly on top of the affected spool piece, that would in effect become the new American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code boundary.

The NRC staff questioned how long it would take before the licensee would make a decision and which option was the most likely. The licensee indicated that they were leaning towards the third option and the decision was expected to be made in about 4 weeks. The licensee explained the basis for option three was centered on the fact that it had the lowest operational risk for the TPN units. The NRC staff had approved a design similar to the proposed earlier last year and questioned whether there were any issues with that repair. At the time, the licensee has had no issues. The NRC staff noted to the licensee, that should the third option be selected as it was a bolted versus welded repair, information related to the bolting would be essential for an efficient NRC staff review.

The NRC staff found the discussion very informative and helpful. Members of the public were not in attendance and no Public Meeting Feedback forms were received.

Any questions, concerns, or feedback about the meeting should be directed to 301-415-2315.

/RA/

Eva Brown, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket No. 50-250

Enclosure:

List of Attendees

cc: Listserv

LIST OF ATTENDEES

AUGUST 25, 2021 MEETING WITH FLORIDA POWER AND LIGHT

CONCERNING TURKEY POINT NUCLEAR GENERATING UNIT 3

PROPOSED INTAKE COOLING WATER REPAIR

NRC

David Wrona Keith Hoffman Matthew Mitchell Eva Brown

FPL Donna Renee Slivon Stavroula Mihalakea Shane Webb Robert Hess Jarrett Mack Carlos A. Figueroa

Enclosure

Meeting Notice ML21222A037; Meeting Summary ML21327A180 Handouts ML21237A009

  • via electronic concurrence OFFICE DORL/LPLII-2/PM DORL/LPLII-2/LA DORL/LPLII-2/BC NAME EBrown RButler* DWrona*

DATE 11/23/2021 11/30/2021 12/7/21