ML22145A393
ML22145A393 | |
Person / Time | |
---|---|
Site: | Saint Lucie, Turkey Point |
Issue date: | 05/25/2022 |
From: | Jeffrey Hamman NRC/RGN-II/DRP/RPB3 |
To: | David Dumbacher NRC/RGN-II/DRP/RPB3 |
References | |
Download: ML22145A393 (1) | |
Similar Documents at Saint Lucie, Turkey Point | |
---|---|
Category:Meeting Summary
MONTHYEARML24185A1262024-07-10010 July 2024
[Table view]Summary of Meeting with Florida Power and Light on License Amendment Requests Regarding the Spent Fuel Criticality Analysis in Support of Planned Transition to 24-Month Fuel Cycles for St. Lucie, Unit 2 ML24128A2102024-05-0707 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting Regarding Saint Lucie ML23276A1852023-09-25025 September 2023 Subsequent License Renewal Draft EIS Public Meetings: Meeting Summary ML23221A3782023-08-16016 August 2023 Summary of Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Transition to a 24-Month Fuel Cycle ML23166A0042023-06-15015 June 2023 Summary of Meeting Concerning 2023 Annual Assessment of the Saint Lucie and the Turkey Point Nuclear Plants ML23058A4262023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML23087A0692023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 ML23108A2752023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 ML23068A0712023-04-28028 April 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 (EPID L-2022-LLA-0105) - Nonproprietary ML23107A2312023-04-18018 April 2023 Summary Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23081A5022023-03-28028 March 2023 Summary of Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Transition to a 24-Month Fuel Cycle ML23066A0872023-03-15015 March 2023 Summary of Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23069A0282023-03-15015 March 2023 Summary of January 31, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23044A4172023-03-0606 March 2023 Summary of January 17, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23048A0492023-03-0303 March 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML22357A0742023-01-19019 January 2023 Summary of December 1, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests ML22350A7082023-01-17017 January 2023 Summary of November 21, 2022, Presubmittal Meeting with Florida Power and Light on St. Lucie License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML22349A0012023-01-0505 January 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 ML22327A2402022-12-0808 December 2022 Summary of October 27, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests ML22276A2302022-10-0606 October 2022 Summary of September 13, 2022, Public Meeting with FPL Concerning Supplemental Information Needed for Acceptance of License Amendment Request to Replace Instrumentation with Digital Systems on Turkey Point, Units 3 and 4 ML22263A0122022-09-27027 September 2022 Summary of August 29, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests (EPID Nos. L-2021-LLI-0000 and L 2021 Lli 0002) ML22144A0022022-09-14014 September 2022 Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency Plan ML22238A2762022-08-29029 August 2022 Summary of August 17, 2022, Meeting with Florida Power and Light/Nextera to Discuss a Turkey Point Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker ML22229A5252022-08-24024 August 2022 Summary of August 11, 2022, Mtg. with Florida Power & Light/Nextera on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Request (EPIDs L-2021-LLI-0000 & -0002) ML22228A2352022-08-23023 August 2022 Summary of July 28, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22228A2032022-08-22022 August 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22195A1752022-07-27027 July 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22186A0812022-07-15015 July 2022 Summary of June 22, 2022, Partially Closed Meeting with Florida Power and Light to Discuss Planned License Amendment Request Related to Fire Protection Program Changes ML22167A1852022-06-30030 June 2022 Summary of June 6, 2022, Meeting with Duke Energy to Discuss Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI) 191 ML22160A3792022-06-30030 June 2022 Summary of May 24, 2022, Closed Meeting with Florida Power and Light to Discuss Planned License Amendment Request Related to Reactor Coolant Pump Seal Replacements ML22154A5202022-06-0909 June 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22154A5112022-06-0707 June 2022 Summary of May 19, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22145A3932022-05-25025 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting 20220434 ML22137A2512022-05-19019 May 2022 Summary of Pre-Application Meeting with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 ML22129A1812022-05-11011 May 2022 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point, Units 3 and 4 ML22118A3582022-05-10010 May 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22089A1382022-04-0505 April 2022 Summary of March 24, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22066A7852022-03-23023 March 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22070A5632022-03-21021 March 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request ML22054A0082022-03-0303 March 2022 Summary of February 17, 2022, Partially Closed Meeting with Florida Power and Light to Discuss Intake Cooling Water Discharge Piping Proposed Alternative ML22020A4032022-02-0707 February 2022 Summary of November 17, 2021, Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests (EPIDs L-2021-LLI-0000 and L-2021-LLI-0002) ML22020A4052022-01-24024 January 2022 Summary of January 14, 2022, Teleconference with Florida Power & Light Co. Regarding Verbal Authorization of Request for Alternative to the Requirements of ASME Code for Examination of Closure Head CEDM Housing 27 Canopy Seal Weld ML21342A3752022-01-0606 January 2022 Summary of Meeting with Florida Power and Light/Nextera on Proposed Improved Technical Specification Conversions ML21337A1962021-12-16016 December 2021 Public Scoping Meeting Summary for the Environmental Review of the Subsequent License Renewal Application for St. Lucie Plant, Units 1 and 2 ML21327A1802021-12-0707 December 2021 Summary of August 25, 2021 Observation Public Meeting with FPL to Discuss Proposed Alternative Report for the Intake Cooling Water System ML21246A0212021-11-23023 November 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point Units 3 and 4 ML21337A2062021-11-0303 November 2021 Environmental Scoping Meeting Related to the St. Lucie Plant, Units 1 and 2, Subsequent License Renewal Application ML21279A0432021-10-15015 October 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 ML21285A0412021-10-13013 October 2021 Summary of September 29, 2021 Meeting with the U.S. Fish and Wildlife Service Regarding Crocodile Monitoring at Turkey Point 2024-07-10 Category:Memoranda MONTHYEARML24128A2102024-05-0707 May 2024
[Table view]Public Meeting Summary - 2023 Annual Assessment Meeting Regarding Saint Lucie ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML23166A0042023-06-15015 June 2023 Summary of Meeting Concerning 2023 Annual Assessment of the Saint Lucie and the Turkey Point Nuclear Plants ML22276A2302022-10-0606 October 2022 Summary of September 13, 2022, Public Meeting with FPL Concerning Supplemental Information Needed for Acceptance of License Amendment Request to Replace Instrumentation with Digital Systems on Turkey Point, Units 3 and 4 ML22238A3142022-08-0707 August 2022 Documentation of Approval for Longer Review Period for Turkey Point Digital Instrumentation and Control License Amendment Requests Acceptance Review ML22188A0862022-07-0707 July 2022 SLRA - Audit Report ML22145A3932022-05-25025 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting 20220434 ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21337A1962021-12-16016 December 2021 Public Scoping Meeting Summary for the Environmental Review of the Subsequent License Renewal Application for St. Lucie Plant, Units 1 and 2 ML21159A1352021-06-0808 June 2021 Public Meeting Summary Regarding the Saint Lucie Nuclear Plant, Units 1 and 2, Docket No. 50-335 and 389, and the Turkey Point Nuclear Generating Station Units 3 and 4, Docket No. 50-250 and 50-251; Meeting Number 20210505 ML20315A2642020-12-14014 December 2020 November 5, 2020, Summary of Drop-In Meeting with Nextera-Florida Power and Light to Discuss Pending Submittals Related to Digital Instrumentation and Controls and Improved Standard Technical Specifications ML20150A4732020-05-29029 May 2020 EOC Meeting Summary ML19330G0542019-11-22022 November 2019 Reconciliation - Analysis of EDO Response to ACRS Ltr - Response to ACRS Report on the Safety Aspects of the SLR Application of the Turkey Point Nuclear Generating Units 3 & 4 - December 2019 Fc Meeting ML19121A6072019-05-0101 May 2019 Summary of Public Meeting with Turkey Point Nuclear Plant to Discuss Annual Assessment of the Turkey Point Nuclear Plant with Public for Period of January 1, 2018 - December 31, 2018 ML19121A6102019-05-0101 May 2019 Public Meeting Summary - St Lucie Nuclear Plant, Docket Nos. 50-389 and 50-335 ML18360A4452018-12-26026 December 2018 06/18/18 Summary of Interagency Meeting Related to Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML18221A2652018-08-0909 August 2018 Referral Memorandum from the Secretary to the Atomic Safety and Licensing Board Panel ML18144A1242018-05-24024 May 2018 Summary of Public Meeting Concerning Annual Assessment of Turkey Point Nuclear Generating Station Unit 3 and Unit 4, for Period of January 1, 2017 December 31, 2017 ML18144A1452018-05-24024 May 2018 Public Meeting Summary - St. Lucie Nuclear Plant Docket Nos. 50-335 and 50-389 ML18074A2522018-04-12012 April 2018 Status of Subsequent License Renewal Application ML17103A0342017-04-12012 April 2017 Summary of Category 1 Public Meeting to Discuss the Significance Determination Process for a Finding at St. Lucie, Unit 1 ML17082A5102017-04-0606 April 2017 Verbal Authorization of Relief Request No. 5 for Repair of High Head Safety Injection Recirculation Test Line - Fifth 10-Year Inservice Inspection Interval ML18187A0332016-07-19019 July 2016 County Resolution to Seek a Commitment from FPL to Discontinue Use of the Cooling Canal System at the Turkey Point Power Plant ML16097A1302016-04-0404 April 2016 March 29, 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Saint Lucie ML16097A1402016-04-0404 April 2016 March 30, 2016, Summary of Public Meeting Turkey Point Nuclear Plant ML23333A0162016-03-0707 March 2016 Att H - MDC Report on Biscayne Bay Wq at Turkey Point CCS (March 4, 2016)-1 ML15320A5512015-11-23023 November 2015 SER MF5835 ML15240A1542015-09-0808 September 2015 Staff Observations of Sump Strainer Head Loss Testing at Alden Laboratory for Generic Safety Issue 191 ML15222A5332015-08-10010 August 2015 Regulatory Audit in Support of Relief Request 1, Revised, for Fifth Ten-Year Inservice Inspection Interval ML14163A6522014-06-19019 June 2014 Summary of May 29, 2014, Public Meeting with NextEra Energy, Inc. and Florida Power & Light Company Regarding Proposed Amendment to Transition Fuel Type at St. Lucie Unit 2 ML14156A2132014-06-0404 June 2014 Public Meeting Summary - St. Lucie Nuclear Plant Docket Nos. 50-335 and 50-389 ML14156A2212014-06-0404 June 2014 Public Meeting Summary - Turkey Point Nuclear Generating Station Docket Nos. 50-250 and 50-251 ML13059A5522013-03-0101 March 2013 3/14/13 - Forthcoming Meeting with Florida Power and Light Company Regarding Steam Generator Performance at St. Lucie Nuclear Plant, Units 1 and 2 ML12222A0392012-08-0909 August 2012 8/16/2012 Cancellation Notice of Forthcoming Conference Call with NextEra Energy and Florida Power and Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Proto ML12213A0612012-08-0101 August 2012 8/16/12 Forthcoming Conference Call with NextEra Energy and Florida Power & Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol ML12150A2992012-06-0505 June 2012 May 17, 2012, Summary of Teleconference Held Between the U.S. Nuclear Regulatory Commission, U.S. Fish and Wildlife Service, and Florida Power & Light Co. to Discuss the Terms of the Biological Opinion at the St. Lucie Plant, Units 1 and 2 ML1204005162012-02-0909 February 2012 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML11251A0052011-09-0909 September 2011 9/21/11 Notice of Forthcoming Meeting with Florida Power and Light Regarding St. Lucie Nuclear Plant, Units 1 and 2 Extended Power Uprate ML11231A7172011-08-25025 August 2011 Notice of Forthcoming Meeting with Florida Power and Light Company (FPL) Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. ML11182A0142011-07-0101 July 2011 Forthcoming Meeting with Florida Power & Light Company Regarding St. Lucie Nuclear Plant, Unit 1 to Discuss Extended Power Uprate License Amendment Request That Is Currently Under Review ML1117101092011-06-22022 June 2011 Independent Spent Fuel Storage Installation Physical Security Plan and Verification of ASM Incorporation ML11160A0482011-06-10010 June 2011 Notice of Forthcoming Meeting with Florida Power & Light, to Discuss Turkey Point Extended Power Uprate License Amendment Request Currently Under Review ML1109006712011-04-21021 April 2011 Acceptance of License Amendment Request for an Extended Power Uprate (Epu), St Lucie Nuclear Plant ML1107405982011-03-16016 March 2011 Notice of Forthcoming Meeting with Florida Power & Light, Turkey Point, Units 3 & 4, to Discuss Extended Power Uprate License Amendment Request That Is Currently Under Review ML1106104272011-03-0707 March 2011 Notice of Forthcoming Pre-Application Meeting with Florida Power & Light Company and NextEra Energy Regarding Turkey Point, Units 3 and 4, St. Lucie, Units 1 and 2, Point Beach, Units 1, and 2, and Duane Arnold ML1100704852011-02-0404 February 2011 Close-out of National Fire Protection Association Frequently Asked 07-0030 on Establishing Recovery Actions ML1035405732010-12-21021 December 2010 Acceptance of License Amendment Request for an Extended Power Uprate (Epu), St. Lucie Nuclear Plant, Unit 1 ML1031205002010-11-10010 November 2010 Notice of Forthcoming Teleconference with Florida Power & Light to Discuss Differences Between the Turkey Point Spent Fuel Pool Criticality Analysis License Amendment Request Currently Under Review & Draft Division of Safety Systems Interim ML1030100892010-11-0505 November 2010 Verbal Authorization of Relief Request No. 8, Transfer Canal Drain Line Piping Repairs ML1030502252010-11-0505 November 2010 Verbal Authorization of Relief Request No. 9, Visual Examination of Containment Liner Repair 2024-05-07 |
Text
May 25, 2022 MEMORANDUM TO: David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects FROM: Jeffrey Hamman, Senior Project Engineer Reactor Projects Branch 3 Jeffrey D. Digitally signed by Jeffrey D. Hamman Division of Reactor Projects Hamman Date: 2022.05.25 10:12:00 -04'00'
SUBJECT:
PUBLIC MEETING
SUMMARY
- 2021 ANNUAL ASSESSMENT MEETING REGARDING THE SAINT LUCIE NUCLEAR PLANT, UNITS 1 AND 2, DOCKET NO. 50-335 AND 389, AND THE TURKEY POINT NUCLEAR GENERATING STATION UNITS 3 AND 4, DOCKET NO. 50-250 AND 50-251. MEETING NUMBER 20220434 On May 3, 2022, the Nuclear Regulatory Commission (NRC) conducted a live virtual meeting concerning the Saint Lucie and Turkey Point Nuclear Plants. The purpose of the meeting was to provide opportunities for the public to discuss the annual assessment for the period of January 1, 2021, through December 31, 2021.
In response to the COVID-19 coronavirus and updated Federal Government guidance on travel and social distancing, the meeting was held remotely through the Microsoft Teams application.
Additionally, a call-only telephone bridge line was available. The following documents related to the meeting are available in ADAMS: Meeting Notice (ML22111A050).
The meeting was conducted from 3:00 PM to 4:00 PM local time. Meeting attendees consisted of representatives from the NRC, Florida Power and Light, local media and members of the public. Due to the nature of the meeting, no official list of attendees is included. NRC staff were available for questions following each presentation. There was minimal interaction with the public which was consistent with the typical annual assessment meetings conducted near the station.
The meeting was listed in the Public Meeting Feedback System under Meeting Code 20220434 and as of the date of this memo, no feedback responses were submitted.
Docket Nos.: 50-335, 50-389, 50-250 and 50-251 License Nos.: DPR-67, NPF-16, DPR-31 and DPR-41 CONTACT: Jeff Hamman, RII/DRP/RPB3 404-997-4573