ML20206L878

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation on Util Responses to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1 Re Maint & Test Procedures for safety-related Equipment & on-line Functional Testing of Reactor Trip Sys.Responses Acceptable
ML20206L878
Person / Time
Site: Pilgrim
Issue date: 08/12/1986
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Lyddon J, Lydon J
BOSTON EDISON CO.
Shared Package
ML20206L882 List:
References
GL-83-28, TAC-42948, TAC-53785, TAC-54095, NUDOCS 8608200393
Download: ML20206L878 (2)


Text

__ ._

August 12, 1986 Docket No.: 50-293 DISTRIBUTION:

?

i'NRC W~PDR NThompson Mr. James M. Lydon Local PDR JZwolinski Chief Operating Officer PD#1 Rdg File Pleech Boston Edison Company RBernero CJamerson 800 Boylston Street OGC-BETH(infoonly) ACRS, 10 Boston, Massachusetts 02199 EJordan DHavercamp, R:I BGrimes JChung, R:I

Dear Mr. Lydon:

JPartlow GHolahan Pilgrim File

SUBJECT:

GENERIC LETTER 83 28, ITEMS 3.1.1, 3.1.2, 3.2.1, 3.2.2, 4.5.1 (TAC NUMBERS 42948,53785,54095)

RE: Pilgrim Nuclear Power Station I

In Generic Letter 83-28, we requested that you review the maintenance and testing procedures at Pilgrim Station for safety-related components in the reactor trip system (Items 3.1.1 and 3.1.2) and all other safety-related equipment (Items 3.2.1and3.2.2). We also requested that you review the i provisions for on-line functional testing of the reactor trip system, 1

including independent testing of the diverse trip features (Item 4.5.1).

The Boston Edison Company's responses relative to the above items have been reviewed and found acceptable. Enclosed is a copy of the staff's Safety Evaluation supporting this conclusion.

5 This concludes the staff's action relative to these items with respect to Pilgrim Station.

1 Sincerely,

! ^

Ariginal

~

signed by: )

John A. ZwolirIski, Director BWR Project Directorate #1 Division of BWR Licensing

Enclosure:

1 As stated I

i cc w/ enclosure:

1 See next page 8608200393 060912 PDR ADOCK 05000293 P PDR

!OFC :BWD#1: DBL :BWD#1: DBL :BWD#1: DBL  :

. _____:__..... ____:._____ Q __:____________:.__ ________::___________.::  : ______..__

i NAME :CJamerson/dn PLeechi :JZwolinski  :  :

i _____:_________\

'DATE:%/'\/86  : $/ ll /86  : 8 /nL/86  :  :  :  :

! O t+w ,

Mr. James M. Lydon Boston Edison Company Pilgrim Nuclear Power Station CC*

Mr. Alfred E. Pedersen, Station Manaaer Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360 Resident Inspector's Office

11. S. Nuclear Regulatory Commission Post Office Box 867 Plymouth, Massachusetts 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, Massachusetts 02360 Office of the Commissioner Massachusetts Department of Environmental Quality Engineering One Winter Street Boston, Massachusetts 02108 Office of the Attorney General 1 Ashburton Place 19th Floor Boston, Massachusetts 02108 Mr. Robert M. Fallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, Massachusetts 02111 Regional Administrator, Reaion I U. S. Nuclear Pegulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. James D. Keyes Boston Edison Company 25 Braintree Hill Office Park Braintree, Massachusetts 02184

.