ML20129J209

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-293/85-13 on 850520-24 & Notices of Violation & Deviation
ML20129J209
Person / Time
Site: Pilgrim
Issue date: 07/16/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20129J213 List:
References
CON-#487-5020 2.206, IEB-80-10, NUDOCS 8507220382
Download: ML20129J209 (2)


See also: IR 05000293/1985013

Text

r ,

, .-

JUL 161985

Docket No. 50-293 License No. OPR-35

Boston Edison Company M/C Nuclear

ATTN: Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject: Inspection Report No. 50-293/85-13

A routine radiological safety inspection was conducted by Mr. R. L. Nimitz

on May 20-24, 1985 of your Pilgrim Nuclear Power Station. The findings

of the inspection were discussed with Mr. A. L. Oxsen at the conclusion

of the inspection.

This inspection covered implementation of your Radiological Improvement

Program, radiological controls for fuel pool work, radioactive waste

management, and the implementation of IE Bulletin 80-10 requirements.

One violation of NRC requirements was identified in the area of adherence

to station approved procedures for fuel pool work. We acknowledge that

corrective action was taken to address the immediate concerns associated

with the problem. However, we are concerned about the violation because

it is similar to violations previously identified; and because it had

existed for an extended period of time (about a month) prior to being

identified by the NRC. Please reply to this matter in accordance with

the enclosed Appendix A, addressing the action taken or planned to

improve personnel adherence to procedures and oversight of on-going

radiological work. ,

A deviation from the requirements of IE Bulletin 80-10 was also '

identified. This deviation involved failure to evaluate certain **

nonradioactive systems and establish appropriate sampling and analysis

programs for these systems in order to identify radioactive contamination

in a timely manner to preclude any unmonitored, undetected radioactive

effluent releases. Please reply to this matter in accordance with the

enclosed Appendix B.

,

The replies requested by this letter are not subject to clearance by the

Office of Management and Budget under the Paperwork Reduction Act of

1980, PL 96-511. .

8507220382 B50716

PDR ADOCK 05000293 ,

G PDR

OFFICIAL RECORD COPY

h

59

- - - - _ _ _

_.

' '

.

,

l

,

Boston' Edison Company 2

Your coorperation with us in these matters is appreciated.

Sincerely,

Original Signed WI

a f

Division of Radiation afety

and Safeguards

Enclosures: Appendix A, Notice of Violation

Appendix B, Notice of Deviation

NRC Region I Inspection Report No. 50-293/85-13

cc w/ encl:

A. V. Morisi, Manager, Nuclear Management Services Department

C. J. Mathis, Station Manager

Joanne Shotwell, Assistant Attorney General

Paul Levy, Chairman, Department of Public Utilities

W. J. Nolan, Chairman, Plymouth Board of Selectmen

Plymouth Civil Defense Director

Senator Edward P. Kirby

E.- R. MacCormack, Senior Regulatory Affairs and Program Engineer (Receives

Safeguards Only)

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bec w/ encl:

Region I Docket Room (with concurrences)

f

.

t

RI:DRSS

Nimitz/mmb

RI:DRSS

Myers

RI[:DRSS R )RSS

e ak BelJamy Ma n

7/9/85 7 / 81 / 8 5

7/p/85

,

////85 7/

l

W $M

5

OFFICIAL RECORD COPY

IR PILGRIM 85-13 - 000I.1.0

07/08/85

.