IR 05000267/1985012

From kanterella
Revision as of 17:04, 21 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/85-12
ML20129B471
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/23/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20129B476 List:
References
NUDOCS 8507290167
Download: ML20129B471 (1)


Text

,_ _ _ _ _ _ __. . _ _ - - - _ _ _ _ _ _ _ _ _ _ _ - _ ________ _

'

,

JUL 2 31985 In Reply Refer To:

Docket: .50-267/85-12 Public Service Company of Colorado ATTN: 0. R. Lee, Vice President Electric Production P. O. Box 840 Denver, Colorado 80201-0840 Gentlemen:

Thank you for your letter of June 5,1985, in response to our letter and Notice of Violation dated May 7,1985. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintaine

Sincerely, Original Signed By E. H. Jchnson E. H. Johnson, Chief Reactor Project Branch cc:

J. W. -Gahm, Manager, Nuclear Production Division Fort St. Vrain Nuclear Station 16805 WCR 191 Platteville, Colorado 80651

~ Singleton, Manager, Quality Assurance Division-(same address)

Colorado Radiation Control Program Director bec distrib. by RIV:

RPB .

R. P. Denise, DRSP Resident Inspecto R. D. Martin, RA Section Chief, RPB/A E. Haycraft, LA D. Weiss,LFMB(AR-2015) RSTS Operator RIV File . M. E. Skow, RPB/A RIV:RPB/ RPB gn" JPJaudon/lk EHJohn{ sonB507290167 850723 g/,,/85 t1 1/13/85 DR ADOCK 0500 g

- _ _ - _ _

'l1