ML20205F456

From kanterella
Revision as of 23:21, 6 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Util Transmitting Summary of 15 Changes Incorporated in Boston Edison/Qa Manual Vol Ii. Changes Acceptable
ML20205F456
Person / Time
Site: Pilgrim
Issue date: 08/05/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lydon J
BOSTON EDISON CO.
References
NUDOCS 8608190208
Download: ML20205F456 (2)


Text

_

m .

AUG 051986 Docket No. 50-293 Boston Edison Company M/C Nuclear ATTN: Mr. James M. Lydon Chief Operating Officer 800 Boylston Street Boston, Massachusetts 02199

Subject:

Annual Review of Boston Edison Quality Assurance Manual - (BEQAM)

Volume II

Reference:

BECo Letter No.86-087, From W. D. Harrington to T. E. Murley, ,

July 7, 1986,

Subject:

Annual Report of Changes to the Boston Edison Quality Assurance Program Description

Dear Mr. Lydon:

We received the above referenced letter which transmitted a summary of fifteen changes incorporated in BEQAM Volume II in accordance with the requirements of 10 CFR 50.54(a). The actual changes were forwarded to this office by means of Change Information Notice Transmittal Nos. 85-09 through 86-05. Tnese changes included transfer of the Nuclear Management Services Department from the VP-Nuclear Operations to the VP-Nuclear Engineering and Quality Assurance, explicit references for resolving supplier deficiencies, four changes to modify and strengthen the audit program and several minor changes to clarify program requirements and reflect changes in documents referenced in BEQAM Volume II.

The Region I staff reviewed the summary report and the actual changes provided in revisions to the BEQAM Volume II sections, as identified on page vil (Revi-sion 47) of the manual and found these changes to be acceptable as they did not reduce the commitments of your previously approved Quality Assurance Program description.

The effectiveness of your QA Program implementation will continue to be the subject of routine regional inspections.

If you have any questions concerning the above, please contact R. W. Winters at 215-337-5244.

Sincerely, Cinal St8 ned Bvt 8608190208 860805 Stewart D. Ebneter, Director PDR ADOCK 05000293 Division of Reactor Safety P PDR 0FFICIAL RECORD COPY OL PILGRIM QA - 0001.0.0 QCk ,

07/29/86 t

Boston Edison Company M/C Nuclear 2 cc:

L. Oxsen, Vice President, Nuclear Operations A. E. Pedersen, Station Manager Paul Levy, Chairman, Department of Public Utilities Chairman, Board of Selectmen Plymouth Civil Defense Director J. D. Keyes Senator Edward P. Kirby The Honorable Peter V. Forman Sharon Pollard IE/QUAB Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Massachusetts (2) bec:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP S. Ebneter, DRS L. Bettenhausen, DRS P. K. Eapen, DRS R. Winters, DRS DRP Licensing Assistant (w/ concurrences)

W. Raymond, SRI, Vermont Yankee T. Shediosky, SRI, Millstone 1&2 H. Eichenholz, SRI, Yankee P. Leech, LPM, NRR Robert J. Bores, DRSS 45 D RI:DRP Winters /pj RI@) S I:DRS I:DRS RI:DRS Eapen lStrosnider Bettenhausen Ebneter 7/23/86 7/D/86 789/86 g/[/86 7/$/86 0FFICIAL RECORD COPY OL PILGRIM QA - 0002.0.0 07/28/86 0

-