ML20209F861

From kanterella
Revision as of 07:48, 5 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Requests 860916 Meeting in Boston,Ma to Discuss,In Detail, Response to Questions Provided During Fifth Progress Rept Meeting on Whipjet Issues
ML20209F861
Person / Time
Site: Beaver Valley
Issue date: 09/09/1986
From: Tam P
Office of Nuclear Reactor Regulation
To: Carey J
DUQUESNE LIGHT CO.
References
TAC-62883, NUDOCS 8609120288
Download: ML20209F861 (2)


Text

-

September 9,1986 Docket No. 50-412 DISTRIBUTION

-Docket 3 Filers P. Tam NRC PDR' ~ " D. Miller Local PDR ACRS (10)

Mr. J. J. Carey, Vice President PAD #2 Rdg Tech Branch Duquesne Light Company T. Novak Gray File Nuclear Group OGC-Bethesda J. Brammer Post Office Box 4 E. Jordan G. Bagchi Shippingport, PA 15077 B. Grimes E. Sullivan J. Partlow

Dear Mr. Carey:

N. Thompson, DHFT

Subject:

Beaver Valley Unit 2 - Request For Meeting at Stone and Webster Offices to Discuss WHIPJET Issues As a result of the fifth progress report meeting on WHIPJET (use of leak-before-break assumption on balance of plant piping), we indicated that we would like to discuss in detail your response to questions provided to your staff during the progress report meeting.

We therefore request your cooperation in a meeting to be attended by your staff and contractors, and NRC personnel.

The meeting will be held at Stone and Webster's office in Boston on September 16, 1986. Mr. J. Szyslowski of your staff has been working with -

us on the arrangements for this meeting.

Thank you for your cooperation. g,/

Peter S. Tam, Project Manager PWR Project Directorate #2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation cc: See next page ckO 1r PM: PAD #

PTam:he ,(

P S2R LRubenstein 9/j/86 9/7/86 I 9/9/86 860912O288 860909 PDR ADOCK 05000412 A PDR

  • D Mr. J. J. Carey Duquesne Light Company Beaver Valley 2 Power Station cc:

Gerald Charnoff, Esq. Mr. R. E. Martin, Manager Jay E. Silberg, Esq. Regulatory Affairs Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 1800 M Street, N.W. Beaver Valley Two Pro,iect Washington, DC 20036 P. O. Box 328 Shippingport, Pennsylvania 15077 Mr. C. W. Ewing, Quality Assurance Zori Ferkin Manager Assistant Counsel Quality Assurance Department Governor Energy Council Duquesne Light Company 1625 N. Front Street P. O. Box 186 Harrisburg, PA 1510S Shippingport, Pennsylvania 15077 Director, Pennsylvania Emergency Management Agency Rcom B-151 Transportation & Safety Building Harrisburg, Pennsylvania 17120 Mr. T. J. Lex Mr. Thomas Gerusky Westinghouse Electric Corporation Bureau of Radiation Protection Power Systems PA Department of Environmental P. O. Box 355 Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. O. Box 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr. W. Troskoski U. S. NRC John A. Lee, Esq.

P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street

Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15279 i

ll. S. NRC, Region I

( 631 Park Avenue

King of Prussia, Penn.ylvania 15729 l

i e

-- --- --