Summary of 860520 Meeting W/Util Re Progress in Whipjet Program (Use of leak-before-break Assumption on balance-of- Plant Piping).List of Attendees Encl
ML20205S596
Person / Time
Site: Beaver Valley
Issue date: 05/29/1986
From: Tam P
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
TAC-62883, NUDOCS 8606120683
Download: ML20205S596 (4)


Text

._

=

'e May 29, 1986 Docket No. 50-412 OISTRIRllTION (NiMe"TTHEg' '0 ELD P. Tam NPC~PDR"" "

local PDR E. Jordan APPLICANT <

Puquesne Light Company et al.

PAD #2 Rdg B. Grimes J. Particw ACRS (101 FACILITY:

Beaver Valley Unit ?

L. Aubenstein NRC Participants SUNECT:

SUMMARY

OF MEETING ON PA) 20, 1986 - FOURTH PROGRESS REPORT ON WHIP.1ET The subiect treeting was held to discuss with Duquesne Light Company (DLC) its balance-of-plant piping) program (use of leak-before-break assumption on progress in the WHIP 1El Previous ineetings were held on March 4, March 12, and April 10, 1986. is tt:e agenda of the meeting, Enclosure 2 is the meeting attendee list.

Prior to the meeting, DLC infomally provided to the staff a copy of a revised draft progress report dated May 14, 1986. Sitrce the draf+ is not yet considered a fomal report, and since it will be submitted in final fem in the near i

future, it is not being included as part of this summary. Those whc wish to t eceive e copy of that droft report should contact the pro,iect managar.

The contents of the draft report was the subject of discussion during the meetino. This revised draft report was rubmitted as a result of the third progress report meeting, and the staff's formal petition transmitted by letter dated May 1, 1986. Staff coments on the draft report and technical concerns were noted by Duquesne Light personnel, Future ineetings and site visits will be needed but no decision has been reached on the dates.

Peter S. Tam, Project Manager PWR Prnfect Directorate !?

Division of PWR Licensing-A Office of Nuclear Peactor Pegulation i

Enclosures:

As stated cc: See next page LORh PM: pan #2 7

DPldYer PTam:hehI 5/

/86 5/27/86 i

8606120683 860529

  1. ~

PDR ADOCK 05000412 A

PDR

2 Mr. J. J. Carey Duquesne Light Company Beaver Valley 2 Power Station ec:

Gerald Charnoff, Esq.'

Mr. R. E. Martin, Manager Jay E. Silberg, Esq.

Regulatory Affairs Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 1800 M Street, N.W.

Beaver Valley Two Project Washington, DC 20036 P. O. Box 328 Shippingport, Pennsylvania 15077 Mr. C. W. Ewing, Quality Assurance Zori Ferkin Manager Assistant Counsel Quality Assurance Department Governor Energy Council Duquesne Light Company 1625 N. Front Sinet P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 Director, Pennsylvania Emergency Management Agency Room B-151 Transportation & Safety Building Harrisburg, Pennsylvania 17120 Mr. T. J. Lex Mr. Thomas Gerusky Westinghouse Electric Corporation Bureau of Radiation Protection Power Systems PA Department of Environmental P. O. Box 355 Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063 1

Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. O. Box 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr. W."Troskoski U. S. NRC John A. Lee, Esc.

P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin.

Pittsburgh, Pennsylvania 15279 U. S. NRC, Region I 631 Park Avenue King of Prussia, Pennsylvania 15229

- ~ ~

' L oic (c.s are 1

i BEAVER VALLEY UNIT 2 WHIPJET Progress Report Meeting No.

4 May 20, 1986, 9:00 a.m.

Phillips Building', Room' P116 e

A..

Opening Statements (NRC, Duquesne ~ Light Co. )

a

' i B..

Technical discussion -- Review of May 14 Draft Report.

I.

Representativeness of plant materials to test taaterials II.

Test methods related to development of J-R curves I I.I.

. Susceptibility to corrosion and fatigue IV.

Fatigue crack growth analysis V.

Ferritic pipe upper shelf energy temperature VI.

Positive displacement pumps VII.

. Fracture mechanics computer program validation VIII.

PICEP/ Leak detection t

C.

NRC caucus on above items D.

Summary i

LUNCH N

E Technical discussion -- Thermal and fluid transients E,

Sched'uling -- future meetings?,

site visits?

o N

9 4

4 4

N

b *1 C [o r r e '2 u

Beaver Valley Unit 2 WHI PJET Progress Report Meeting No. 4 Name Organization BU-t<t L iania A

WufpuM/ 9ss 0 oj. Qv, A.)Rc

.n tse oc,et M4ADN Mrc.dT,.4FFAuts 1 L.C.

4'au, g &w 4,c. sea. su

<w/*'"t*

,yr nu s,.

y 2,.,. a ' E

.o. z. c.

y u.htu m t.. s - =

Rom t b b.cm-ce.

Davic) QuiRoney ti n

h

'l H g eiy c t.aw w c5-1.

m ou bf

%l8 h

%8ets Gpi Mb bospMr ac/Dw/czb Q

D./.C.

4 q%

c t Art 3/B N.

UEMS'{h' S1. UJCe A.

O y.. Cxe u R C_[?W R-6/' G 6 Vim deamu.3 0

& fl lg

$[Q bbsers lS* %

T EA CA 6 % :: j,

dKRAM ZAHooR.

tdoueTecH coRPcurun

$0tw l'L N It C/ya/(?- AlG.h US T CHCW LR C_

i BasY Eas r vac/pcom_4/sa o

/heen,t)dkarma

.1%"E 9' ta&rez evG 6 ceeP

~

Nevef

[EA Fi=7'

% Lttwy

^'LC(tut-Alu fo4 Gadle vovci acel (ar<,t )