ML20211A610

From kanterella
Revision as of 05:18, 2 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safeguards Insp Rept 50-293/86-42 on 861209-11.No Violation Noted.Steps Taken to Correct Violation Noted in Verified
ML20211A610
Person / Time
Site: Pilgrim
Issue date: 02/05/1987
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lydon J
BOSTON EDISON CO.
Shared Package
ML20211A616 List:
References
NUDOCS 8702190200
Download: ML20211A610 (2)


See also: IR 05000293/1986042

Text

,

.

FEB 0 51987

Docket No. 50-293

'

Boston Edison Company M/C Nuclear

ATTN: Mr. James M. Lydon

Chief Operating Officer

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject: Inspection No. 50-293/86-42

This refers to the routine safeguards inspection conducted by Mr. G. C. Smith

of this office at the Pilgrim Nuclear Power Station, Plymouth, Massachusetts

on December 9 - 11, 1986 of activities authorized by NRC License No. OPR-35 and

to the discussions of our findings held by Mr. Smith with Mr. E. J. Ziemanski

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Our inspector also verified the steps you had taken to correct the violation

brought to your attention in a letter dated December 31, 1985. We have no

further questions regarding your action at this time.

I Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Your cooperation with us is appreciated.

Sincerely,

Original Sisned Ey:

Jczes H. Joyner

8702190200 870205 Thomas T. Martin, Director

DR ADOCK 0500 3 Division of Radiation Safety

and Safeguards

l

Enclosure: NRC Region I Inspection Report No. 50-293/86-42

l

OFFICIAL RECORD COPY IR PILGRIM 86-42 - 0001.0.0

01/28/87

T6.'OY

-_.

. .

Boston Edison Company M/C Nuclear 2 FEB 0 51987

cc w/ encl:

L. Oxsen, Vice President, Nuclear Operations

A. E. Pedersen, Station Manager

Paul Levy, Chairman, Department of Public Utilities

Chairman, Board of Selectmen

J. D. Keyes

The Honorable E. J. Markey

Plymouth Civil Defense Director

Senator Edward P. Kirby

The Honorable Peter V. Forman

Sharon Pollard

E. R. MacCormack, Senior Regulatory Affairs and Program Engineer

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

-W. Raymond, SRI, Vermont Yankee

T. Shediosky, SRI, Millstone 1&2

H. Eichenholz, SRI, Yankee

P. Leech, LPM, NRR

Robert J. Bores, DRSS

R. B. Manili, NMSS

i

l

RSS RI

ith/fi RK Joyner

>Y87 $/3 /87 0F/3/87

l

t 0FFICIAL RECORD COPY IR PILGRIM 86-42 - 0002.0.0

01/28/87

l

- - , _. - . _ - . .- . - _ _ - -