Forwards Safety Evaluation Accepting Revised Temp Profile, Per GE EAS-98-0887, Drywell Temp Analysis for Pilgrim Nuclear Power Station. Profile Requested to Be Documented in Next Updated FSAR
ML20235V731
Person / Time
Site: Pilgrim
Issue date: 03/03/1989
From: Mcdonald D
Office of Nuclear Reactor Regulation
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20235V732 List:
References
TAC-67809, NUDOCS 8903100313
Download: ML20235V731 (2)


Text

- _ - _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

_ March 3,1989 y

Docket No. 50-293 z

L Mr. Ralph G. Bird Senior Vice President-Nuclear Boston Edison Company.

! Pilgrim Nuclear Power Station i RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360

Dear'Mr. Bird:

SUBJECT:

REVISED TEMPERATURE PROFILE - PILGRIM

Reference:

-TAC No. 67809 By let+er dated March 15, 1988, you provided General Electric Repcet, EAS-98-0887. "Drywell Temperature Analysis for Pilgrim Nuclear Power Station." The report provided the revised temperature profile for the dry-well and was reviewed by;the NRC staff to determine if the drywell airspace temperature profile is acceptable for equipment qualification purposes.

Supplemental information was provided by letter dated September 7, 1988.

We have completed our review of your submittals and concluded that the analysis (EAS-98-0887) provides a reasonable basis for determining the drywell airspace temperature profile used for equipment qualification. This finding is based on the conservative assumption that manual spray initiation occurs 30 minutes into an event. Details of our review which support our finding of acceptability are included in the enclosed safety evaluation (SE). We noted in our SE that the instrumentation for both the temperature and pressure monitors is safety grade.. We request that this be documented in the next update of the Pilgrim Updated Final Safety Analysis Report.

This completes our activities related to the above referenced TAC number.

Sincerely, Original Signed)$

Daniel G. Mcdonald, Senior Project Manager Project Directorate I-3 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation j i

Enclosure:

J As stated cc w/ enclosure: See next page DISTRIBUTION:"Doctitif31ei NRC& Local PDRs, PDI-3 r/f, MRushbrook, DMcDonald, RWessman, Glaines, BBoger, EJordan, BGrimes 0GC, ACRS(10), JWiggins,Rgn.I n b 0FC :PDI-3 :PDI-3 :DIR'/PDI-3  :  :  :  :

.....:.. . ..y.: :______......:........ ___: .... ____..:..____ .....:...........

NAME :MRu ld :RWessman  :  :  :  :

bffik'  :... ________: ...........:.........___:. ___ ......:.......__...:. ___..__..

DATE :3/7/89 :3/"3 /89 :3/3/89  :  :  :  :

/ 0FFICIAL RECURD COPY 8903100313 890303 6 PDR ADOCK 05000293 d P PDC f

~

o j ,

e Mr. Ralph G. Bird .

Boston Edison Pilgrim Nuclear Power Station cc:

~

Mr. K..L. Highfill Mr. Ralph G. Bird Station Director Senior Vice President - Nuclear Pilgrim Nuclear Power Station Boston Edison Company RFD #1 Rocky Hill Road Pilgrim Nuclear Power Station Plymouth, Massachusetts 02360 RFD#1, Rocky Hill' Road

! Plymouth, Massachusetts 02360 Resident Insnector's Office .

Mr. Richard N. Swanson, Manager U. S. Nuclear. Regulatory Comission Nuclear Engineering Department -

Post Office Box 867 Boston Edison Company Plymouth, Massachusetts 02360 25 Braintree Hill Park Braintree, Massachusetts 02184 Chairman, Board of Selectmen i

11 Lincoln Street Ms. Elaine D. Robinson Plymouth, Massachusetts 02360 Nuclear Information Manager Pilgrim Nuclear Power Station Office of the Commissioner RFD #1, Rocky Hill Road

Massachusetts Department of. Plymouth, Massachusetts 02360 Environmental Quality Engineering One Winter Street Charles V. Barry Boston, Massachusetts 02108 Secretary of Public Safety Executive Office of Public Safety Office of the Attorney General One Ashburton Place.

One Ashburton' Place Boston, Massachusetts 02108 20th Floor Boston, Massachusetts 02108

' Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, Massachusetts 02111 Pegional Administrator, Region I U. S. Nuclear Regulatory Comission 475 Allendale Road King. of Prussia, Pennsylvania 19406 j' Mr. James D. Keyes Regulatory Affairs and Programs Group Leader

-Boston Edison Company 25 Braintree Hill Park Braintree, Massachusetts 02184 l

l .

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ l