ML20245J144

From kanterella
Revision as of 20:50, 14 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That 880921 & 890302 Responses to NRC Bulletin 88-007 & Suppl 1, Power Oscillations in BWRs Meet Requirements of Both Bulletins
ML20245J144
Person / Time
Site: Pilgrim
Issue date: 04/25/1989
From: Mcdonald D
Office of Nuclear Reactor Regulation
To: Bird R
BOSTON EDISON CO.
References
IEB-88-007, IEB-88-7, TAC-72796, NUDOCS 8905040014
Download: ML20245J144 (2)


Text

,

April 25,1989 e

. Dock:t flo. 50-293 Mr. Ralph G. Bird Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station RFD#1, Rocky Hill Road Plymouth, Massachusetts 02360

Dear Mr. Bird:

]

SUBJECT:

RESPONSE T0 flRC BULLETIll NO. 88-07, SUPPLEMENT 1

Reference:

TAC Number 72796 On June 15, 1988 and December 30, 1988, the NRC staff issued Bulletin No.

88-07, and Eulletin No. 88-07, Supplement 1, " Power Oscillations in Boiling Water Reactors (BWRs)." The purpose of the June 15 bulletin was to request that holders of operating licenses for BWRs ensure that adequate operating procedures and instrumentation are available and adequate operating training is provided to prevent the occurrence of uncontrolled power oscillations during all modes of BWR operation.

In the December 30 bulletin we provided additional information concerning power oscillations in BWRs, and requested that adriressees take action to ensure that the safety limit, for the plant minimuru critical power ratio (MCPR) is not violated.

In letters dated September 21, 1988 and March 2, 1989, you responded to NRC Bulletin No. 88-07, and NRC Bulletin No. 88-07, Supplement 1, describing ,

completion of all required activities. The details provided in your letter I indicate that the actions necessary to provide reasonable assurance that un- l controlled power oscillations will not occur at the Pilgrim facility have been i taken. Therefore, you have fulfilled the requirements of both bulletins. l This ccrrpletes our effort under TAC No. 72796.

Sincerely, Original Signed by:

Daniel G. Mcdonald, Senior Project Manager Project Directorate I-3 Division of Reactor Projects I/II cc: See next page PDI-3 r/f, MDLynch, NRC& Local PDRs, MRushbrook, Distribution:'DocketFile(10),EJordan,BGrimes,JWiggins,Rgn.I,BBoger,SVarga DMcDonald, RWessman, ACRS

[ PILGRIM / BULLETIN 88-07 SUP. ')

DTtTPDI 3, :PDI-g :PDI-3  :  :  :  :

,s NAME:MRty.bburook: ld:RWe ian :  :  :  :

DATEkbb9 k /b9 kh/89 $ _

0FFICIAL RECORD COPY 8905040014 890425 IO' PDR ADOCK 05000293 ' dp o PDC \

~

q

.c ,

- E j 3 . .t.:. d

--( ,

.. 'l ,

  1. Mr.' Ralph G.; Bird )
!' Boston Edison -Pilgrim Nuclear Power Station icc: q l

Mr. K. L. Highfill .Mr. Ralph G. Bird )

Station Director Senior Vice President - Nuclear l

- Pilgrim Nuclear Power Station Boston Edison Company 1 RFD #1 Rocky Hill Road Pilgrim Nuclear Power Station' Plymouth, Massachusetts 02360 RFD#1, Rocky Hill Road Plymouth, Massachusetts 02360 j i

Resident' Inspector's Office Mr. Richard N. Swanson, Manager U. S. Nuclear Regulatory Commission Nuclear Engineering Department Post Office Box 867 Boston Edison Company Plymouth, Massachusetts 02360 25 Braintree Hill Park Braintree, Massachusetts 02184 1 Chairman, Board of Selectmen 11 Lincoln Street

'J Ms. Elaine D. Robinson '

Plymouth,; Massachusetts 02360 Nuclear Information Manager Pilgrim Nuclear Power Station Office of the Commissioner RFD #1, Rocky Hill Road Massachusetts Department of Plymouth, Massachusetts 02360 Environmental Quality Engineering One Winter Street Charles V. Barry ,

Boston, Massachusetts 02108- Secretary of Public Safety l Executive Office of Public Safety Office of the Attorney General One Ashburton Place One Ashburton Place Boston, Massachusetts 02108  ;

20th Floor-Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health ~

150 Tremont Street, 2nd Floor Boston, Massachusetts 02111 Regional Administrator, Region I U. S. Nuclear Regulatory Comission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. James D. Keyes Regulatory Affairs and Programs Group Leader 3 Boston Edison Company 25 Braintree Hill Park Braintree, Massachusetts 02184