Forwards Safety Insp Rept 50-293/87-27 on 870623-0803.No Violation Noted.Expresses Concern Re Weakness in Site Access Program Not Corrected Until Prompted by NRC
ML20238E933
Person / Time
Site: Pilgrim
Issue date: 09/09/1987
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20238E936 List:
References
NUDOCS 8709150298
Download: ML20238E933 (2)


See also: IR 05000293/1987027

Text

_ - - _ _ _ _

>

SEP 091987

Docket No. 50-293

Boston Edison Company

ATTN: Mr. Ralph G. Bird

Senior Vice President-Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject: Inspection Report No. 50-293/87-27

This refers to the routine safety inspection (50-293/87-27) conducted by

Dr. M. McBride, Mr. J. Lyash and Mr. T. Kim of this office on June 23, 1987 to

August 3,1987 at the Pilgrim Nuclear Power Station, Plymouth, Massachusetts. 3

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter.

We are concerned that weakness in your site access progran was not corrected

until prompted by the NRC. Although steps were planned to strengthen the

program at Pilgrim in the long term, weaknesses which could have reduced daily

security effectiveness were not resolved promptly by your staff. I want to

stress that we evaluate your immediate as well as long term corrective actions

in our performance assessments. ,

Your cooperation with us in this matter is appreciated.

Sincerely,  !

Oricinc2. Sicacd Dy r

William Kane, Director

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report No. 50-293/87-27

gs" h

0

0FFICIAL RECORD COPY IR PILGRIM 87-27 - 0001.0.0

09/02/87 [j[

'

--- -

- i

. _ . _ _ _ _ _ _ _ _ _ _ _ _

I

ha.

Boston Edison Company 2 i

SEP 091987 j

i

CC W/ encl l

K. P. Roberts, Nuclear Operations Manager

Paul Levy, Chairman, Department of Public Utilities  !

Chairman, Board of Selectmen i

'

Plymouth Civil Defense Director l

J. D. Keyes, Boston Edison Regulatory Affairs and Programs j

E. D. Robinson, Nuclear Information Manager

R. N. Swanson, Nuclear Engineering Department Manager i

The Honorable E. J. Markey

'

Senator Edward P. Kirby .

The Honorable Peter V. Forman l

'

Sharon Pollard, Secretary of Energy Resources

Rachel Shimshak, MASSPIRG

Public Document Room (PDR) 1

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector  :

Commonwealth of Massachusetts (2)  !

l

bec w/ encl: .

,

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl) { i

Section Chief, DRP

R. Wessman, PM, NRR

R. J. Bores, DRSS

R. Keimig, DRSS (See Sections 3.c and 4.d)

H. Williams, DRP (See Secticn 4.d)

!

i

DRP RI:DRP RI: DRPH

McBride/mjd iggins Bettenhau n Rf 'e

Ka

[9/"/87 9/ F/87 9/g/87 9///87

QFFICIAL RECORD COPY IR PILGRIM 87-27 - 0002.0.0

09/04/87