ML20244B171

From kanterella
Revision as of 04:38, 23 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to 720928 Request for Review of Section 6 Tech Specs Reporting Requirements Per Safety Guides 16 & 21. Submits Review Schedule for Each Facility
ML20244B171
Person / Time
Site: Dresden, Quad Cities, 05000000
Issue date: 12/01/1972
From: Brian Lee
COMMONWEALTH EDISON CO.
To: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20235B311 List: ... further results
References
FOIA-87-111 NUDOCS 8010020882
Download: ML20244B171 (2)


Text

- __ _ - - .

c. ', +<

p

'l Wau!in iqiycy3 j '

' Commonwealth Edison Company ONE FIRST NATIONAL PLAEA

  • C H I C A G O. fLLINCIS Address teph so

, POST OFFIC E SOE Fe 7

  • CNIC AO O, ILilR Ol4 4049 0 December 1, 1972' O

. .T. a s,

, f' . l N El .i , ..; g 0-4, \

,,, , j Mr. D. J. Skovholt l,1 *,

s '{- ') /

Assistant Director for D 7h ' p'[ Q g(5)

/,-

g% ,O,h ,)

1 g

Operating Reactors Directorate of Licensing S ,

/

\f, 4 $ / ,Qy/

'M \

U.S. Atomic Energy Commission .OI7 h

\No Washington, D.C. 20545 Cr ,

[ ' - T" 'f'

Subject:

Reporting Requirements of the Technical Specifications, Section 6, for Dresden and Quad-Cities Stations, AEC Dkts 50-10, 237, 249,d5Dand 265

Dear tir. Skovholt:

Your letter of September 28, 1972, requested that the reporting requirements in Section 6 of the Technical Specifications be reviewed for consistency with Safety Guides 16 and 21. This letter is in response to that request.

The Quad-cities:. Technical Specifications were discussed with your staff on November 20 through 22, 1972. Although the review and audit portions'of Section 6 were not finalized at that meeting, the reportiing requirements were agreed upon.

Therefore, the next issue of the; Quad-cities Technical Specifications, due to be is3ue'd about December 15, 1972, will comply with yous reques,t.

The Dresden Technical Specifications have not been reviewed at this time as all'of our effort has been focused on Quad-cities Station id'an attempt to resolve all outshnding items prior"to issuance of the 100% power license. After the revised Quad-cities Technipal Specifications are received, with the new reporting requirements, a review of the Dresden reporting requirements will be undertaken.

p f,/-pg,grx} 4 , esss, w

- = a

.? ,

35 ., .

,;. .. m,

. _: commonwealth Edison Company

i. .. ,

Mr. D. J. Skovholt - 2- ,

December 1, 1972 It is anticipated that this review, along with any necessary revisions to appropriate monitoring equipment and procedures,'will take about throe months. Therefore, a proposed Technical Specification change for Dresden Units 2 and 3 will be submitted to the AEC by April 1, 1973.

, ' The Dreuten Unit 1 Technical specifications are presently under review by Commonwealth Edison and your staff.

A. revised reporting requirements section will be. resolved with your staff-for Dresden Unit 1 concurrent with the'Dresden Units 2 and 3 sections.

4: ,

Very truly yours, O

vn0h 0JL T Byron Lee, Jr. l Assistant to the Yresident O

i 4 [

f

~ '

t

- _ _ - _ _ _ _ _ - - _ _ _ - _ _ . _- _- '~'