Provides Schedule for Completion of Installation of Mods to Plants Reactor Water Level Instrumentation,Per Generic Ltr 84-23.Penetrations Will Be Installed During Outage 13 for Dresden & During Outage 12 for Quad-Cities
ML20059F031
Person / Time
Site: Dresden, Quad Cities  Constellation icon.png
Issue date: 08/27/1990
From: Stols R
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
GL-84-23, NUDOCS 9009110067
Download: ML20059F031 (2)


Text

_. . .- .

p ga ,

j .; --

U ~:

  • t ..

[ _c

$ C:mmonwealth' Edison 1400 Opus Plac3 - . ..

~

' (' Down:rs Grova, Illinois 60515 1

. r.

August 27,1990 g

u Dr. Thomas E. Murley OfYice of Nuclear Reactor Regulation

..U.S. Nuclear Re latory Commission Washington, D.G.- 20555 j j

J ATrN: Document Control Desk .j

Subject:

Quad Cities Station Units 1 and 2 Dresden Station Units 2 and 3 Reactor Level Reference Leg Modification; Generic Letter 84-23 1 L NRC Docket Nos. 50-254/265 and 50-237/24%  ;

L L- .

References:

.(a) Letter from G.L. Alexander to H.R. Denton p dated December 4,1984, i

(b) Letter from R. Stols to T.E. Murley  !

dated August 3,1989. ,-i j

Dr. Murley: -l Reference (a) provided our response to Generic Letter 84-23 " Reactor Vessel ]

j

> Water Level Instrumentation in BWRs" which requested that all BWR operating plants furnish a description of their plans to improve reactor water level j metrumentation. The Generic Letter specifically requested information on reference - i leg overheating and mechanical level indication equipment replacement. Reference ]

, L(b) provide the latest schedule for completion of the modification to resolve the issue H on reference leg overheating.

,]

~ The scope of the reference leg modification includes the addition of new ; J!

E containment penetrations, condensing chambers and instrument lines from the- 1 e'

reactor, vessel nozzle to the vessel instrument racks located outside of the drywell. N

. Conunonwealth Edison has identified (through required design reviews) that, in order to achieve the required degree ofinstrument accuracy, pping slope orientation -l in ~Rical. Therefore, to achieve the accurate instrument response; the piping j i miation should be designed based on measurements from the aa-bidA drywell ion. The penetrations will, therefore, be installed during the Refueling ]y

, described in reference (b) and the modification will be completed n the iuent Refueling outage for each unit. j]

4 s

C',enqUvJ 9009110067 900827 T 0 0\ l PDR ADOCK 05000254 'h4 P. PNV & [i \\0 '

e

3 c..(.% -

' August 27,1990 -

. Dr. T.E. Murley While other desim issues have been identified during the review process. '

Coimnonwealth Edison believes that the issues can be resolved within the constraints of the revised scheduled.

The schedule for installation of the Modification is as follows:

Penetration Modification Installation _Complation.

DresdenUnit 2 Outage 12 (10/90) Outage 13 Unit 3 Outage 12 (3/91) - Outage 13 Quad Cities Unit 1 Outage 11 (11/90) Outage 12 Unit 2 Outage 11(6/91) Outage 12 If there are any questions or comments, please direct them to me at (708) 515 7283.

Very truly yours, 9

Rita Stols Nuclear Licensing Administrator

cc: - A.B. Davis, Regional Administrator

", 1 L.N. Olshan, Project Manager

' B.L. Siegel, Project Manager

' ~ S. DuPont, Senior Resident Inspector (Dresden)

T. Taylor, Senior Resident Inspector (Quad Cities) ,

be: