Forwards Annual FSAR Update for Quad-Cities Station
ML20055D474
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 06/29/1990
From: Kovach T
COMMONWEALTH EDISON CO.
To: Murley T
Office of Nuclear Reactor Regulation
Shared Package
ML20055D476 List:
References
NUDOCS 9007060340
Download: ML20055D474 (6)


Text

r -

< N) Commonwealth Edison

[.. l h \ ) 1400 Do:no:]Opus Cr:ve,Place lHinois 60515 sv

. June 29, 1990

)

{

Dr. Thomas E. Hurley Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATIN: Document Control Desh

Subject:

Quad Cities Station Units 1 and 2 Annual Update to final Safety Analysty Report for Operating Licenses DpR-29 and DDR-30 EC_DotteLHe1.,_M-25LamLM-255

Reference:

(a) December 15, 1980 letter from 0.G. Eisenhut to All Licensees.

(b) June 30, 1989 letter from T.J. Lovach to U.S. Nuclear Reg:llatory Commission.

Dr. Murley:

In accordance with the requirements of 10CfR50.71(e), Conanonwealth Edison hereby submits the annual FSAR update for Quad Cities Units I and 2. Units 1 and 2 have a common FSAR, and therefore, the revision contains information for both units.

a The UFSAR has been prepared in accordance with guidance provided by the

-May 9, 1980 federal Register Notice and Reference (a). Consistent with that guidance, this update has been prepared in the original FSAR format with the original level of detall. No; attempt'has been made to revise the format or content to conform wtth the recommendations contained in Regulatory Guide 1.70.

Commonwealth Edison has; applied its established procedures to identify the information required to be submitted for this revision, including todifications to

.the facility as described.in the'llfSAR that have been made since the last submittal 4 (Reference (b)). In our judgment, the information provided accurately piesents those changes made since the(pipvious submittel which are necessary to reflect

-information and analyses submilled to the NRC, and that all changes requiring NRC l . approval have been reviewed by the NRC. For all other changes, there are safety evaluations on-site to document the Station's determination that prior NRC approval was not required.

I 0

{ 9007060340 900629 0 DR. ADOCK 0500 4

p.

ktk' 4 Dr. T.E. Hurley June 29, 1990 A summary of 10CFR50.59 safety evaluations is provided to the Commission on a monthly basis in accordance with 10CFR50.59(b)(2)1 therefore, the requirement of 10CFR50.71(e)(2)(11) has been met.

Attachment A contains a brief description of the basis for the change.

Attachment B provides direction for the replacement of pages.

In accordance with the regulations, future revisions to the UFSAR will continue to be provided on an annual basis.

To the best of my knowledge and belief, the submitted changes to the UFSAR are true and correct. In some respects these statements are not based on my personal knowledve but upon information furnished in the regular course of business by other Commonwealth Edison employees. Such information has been reviewed in accordance with Company practice and I believe it to be reliable.

In accordance with the requirements of 10CFR50.71(e), one signed original and ten (10) additional copies of the UFSAR revisions are provided. Please direct any questions you may have regarding this matter to Ms. R. Stols (708/515-7283).

Very truly yours,

. Kovach Nuclear L censing Manager cc: A.B. Davis, Regional Administrator - Region III L.N. 01shan, Project Manager - NRR (w/o enclosure)

Senior Resident Inspector - Quad Cities Attachment A: Description of the Changes B: Instructions for Page Change Enclosure Imw/ZNLD41

AUACifERLA DESCRIPT10lLOLCHAltl5

.129Q_UESAR SECIl0N/PAGE QLECRIPTION Table of Contents Revised to reflect updated sections.

-Expanded to include illustrations and tables.

List of Currently Effective Changes Developed to ensure UFSAR Manuals are complete and current.

Page 2-9 Revised makeup requirement values during a loss of Lock and Dam 14..

1-18, 1-41 Table 5.2.5, 5-21, 6-30, Revised to reflect the removal of Figure 6.2.8 Figure 6.2.10c, 10-1, the Head Spray System per 10-24, 10-25, 10-26 Modification M4-1(2)-88-028B.

Chapter 3 and 14, 4-4, 4-8, 4-40, Administrative changes to clarify 4-44, 4-44a 4-45 through 4-48, 4-52, text and correct grammatical and 4-55, 4-62, 4-62a, 4-64, 4-65, 4-71, typographical errors.

4-75, 4-76 Updated analytical and calculational Figur', 4-13.14a, 4-3.14b, 4-3.15a. methodologies for transient analyses 4 ' . " . 4. 3.16a , 4. 3.16b utilized by General Electric.

Removed outdated information which is no longer applicable.

Updated fuel and control rod types to reflect current core conditions.

Streamlined information by providing references to information source.

4-82, Figure 4.5.1 Revised RCIC System description to reflect the removal of the air operator on valve 1-1301-50 (Modification 4-1-88-052A).

Figure 5.2.1, 5.2.2 Added previously missing figures..

5-21, 10-30 Revised to reflect the modification 4-1(2)-88-27A which removed the CRD return line.

Figure 4.5.1, figure 6.2.16a Revised to reflect Hodifications 6-54, 7-131, 7-140 M4-1(2)-84-21A and B, and M4-1(2)-88-37B which reduced the number of room temperature switches and setpoints for the HPCI and RCIC system isolation function and removed the RCIC square root converter.

6-73, 6-76, 6-77, 6-79, 6-80, 6-83 Replaced "DG/HPCI" failure with figures 6.2.21 " battery" failure as a result of the 6.2.22 SAFER /GESTR LOCA Analysis NEDC-31345P 6.2.23 rev. 1 6.2.24 6.2.25 6.2.26

ATIAQ9ERLA_icontinuedl I 7-63, figure 7.4.16 Revised the RBH trip level setpoints  ;

as a result of the analysis, NEDC  ;

31449 Extended Operating Domain and  ;

Equipment Out-of-Service submitted to  ;

support Technical Specification  !

Amendments 103 (DPR-29) and 104  !

(DPR-30). i 8-22, 8-23 Added the functional description for I the new protective relays installed on Motor Control Center 28/29-5  !

(Modification M4-2-89-165).

+

8-24, 8-27 Revised the description of the ground detection system.  ;

8-25 Revised the battery ampere-hour j rating to 142 ampere hours per  !

Hodification M4-1(2)-88-043.

Figure 10.14.1 Added previously missing figure. I 10.92, 10.93, 10.94 Grammatical correction because the section was previously written in '

future tense.

figures 12.1.3/12.1.4 Revised figures to incorporate 12.1.5 location of the new BWR Chemistry 12.1.6 Sample Panels and Equipment Room. -

12.1.8 (Modification M4-1(2)-87-003A, B, C) 12.1.11 P

13-1, 13-2, 13-3, 13-4 bidated station organization figure 13.1.1 liformation to reflect reorganization l

which occurred in early, 1989.

l i

l l

l l

l

AUACMERLB JP90lSMLUPMII Instrntion_forlase_. Changes >

t Remove Insert Table of Contents 1-22 Table of Contents 1-40 List of Currently

-- Effective Pages 1-58 1-18 1-18 1-41 1-41  ;

2-9 2-9 2-10 2-10 Chapter 3 Chapter 3 i 4-4 4-4 4-8 4-8 4-40 4-40 4-44 4-44

-- 4-44a Figure 4.3.14a figure 4.3.14a @ 4-44a figure 4.3.14b Figure 4.3.14b @ Figure 4.3.14a Figure 4.3.15a --

i Figure 4.3.15b -- 4 4-45 4-45 4-46 4-46 Figure 4.3.16a figure 4.3.15a @ 4-46 Figure 4.3.16b Figure 4.3.15b @ Figure 4.3.15a 4-47 4-47 4-48 4-48 4-52 4-52 4-55 4-55 4-62 4-62

-- 4-62a @ Figure 4.4,1b 4-64 4-64 '

4-65 4-65 4-71 4-71 i 4-75 4-75 -

4-76 4-76 ,

figure 4.5.1 -Figure 4.5.1 @ 4-76 4-82 4-82

-- Figure 5.2.1 0 5-3

+ -- Figure 5.2.2 0 5-13 5-21 5-21 Table 5.2.5 Sheet 1 of 10 Table 5.2.5 Sheet 1 of 10 @ 5,-22 Figure 6.2.8 Figure 6.2.8 @ 6-23 6-30 6-30 l

Figure 6.2.10c Figure 6.2.10", @ Figure 6.2.10b Figure 6.2.16a figure 6.2.16a @ 6-52 6-54 6-54 6-73 6-73 Figure 6.2.21 Figure 6.2.21 @ 6-75 Figure 6.2.22 Figure 6.2.22 @ Figure 6.2.21 figure 6.2.23 Figure 6.2.23 9 Figure 6.2.22 Figure 6.2.24 Figure 6.2.24 0 Figure 6.2.23 u

Figure 6.2.25 Figure 6.2.25 9 Figure 6.2.24 Figure 6.2.26 Figure 6.2.26 @ Figure 6.2.25 6 6-76 ,

1

@ - Insert after page

AUACINALB_hontinued)

, Remove Intert 6-77 6-77 r 6-79 6-79 6-80 6-80 l

6-83 6-83 7-63 7-63 Figure 7.4.16 Figure 7.4.16 9 7-63 7-131 7-131 -

7-140 7-140 8-22 8-22 ,

8-23 8-23 8-24 8-24 8 8-25 8-27 8-27 10-1 10-1 '

10-24 10-24 10-25 10-25 10-26 10-26 10-30 10-30 10-92 10-92 '

-- Figure 10.14.1 9 10-92  :

10-93 10-93 10-94 10-94 Figure 12.1.3/12.1.4 Figure 12.1.3/12.1.4 9 Figure 12.1.1 t figure 12.1.5 Figure 12.1.5 9 Figure 12.1.3/12.1.4 Figure 12.1.6 Figure 12.1.6 9 Figure 12.1.5 -

figure 12.1.8 Figure 12.1.8 9 Figure 12.1.7 Figure 12.1.11 Figure 12.1.11 9 Figure 12.1.9 1 13-1 13-2 13-2 13-3 13-3 13-4 13-4 Figure 13.1.1 Figure 13.1.1 9 13-4 Chapter 14 Chapter 14 0 - insert after page t

f

/ZNLD/41