Commonwealth Edison -
".4
- ~m ouad Cites Nuclear Power Staton'-
-( g-22710 206 Avenue North v
ooroova, Illinois 61242-9740 -
- Telephone 309/654-2241 RLB-90-204 August 9, 1990-U.S. Nuclear Regulatory Commission L
-ATTN:
Document Control' Desk =
Hashington, D.C.
20555
-1 d
Subject:
-Quad Cities Nuclear Station Unit 2 I
Summary Status of Fuel Performance ti NRC Docket Number 50-265 Enclosed is the~Special' Report.:" Quad-Cities Nuclear Power. Station', Unit 2,:
Summary Status of Fuel Performance,-End of Cycle 10, May,fl990.
This report is submitted to_ you..in accordance with the-Special Report j
Requirements of Table 6.6-1. Docket Number 50-265', DPR-30.
- j)
Very truly yours,-
if R.L.-Bax-j Station Manager-i Enclosure c-cc:
A.B. Davis, Regional Administrator T. Taylor, Senior Resi. dent Inspector p.'
R; Stols, Commonwealth Edison P -}g[.
, j, D. Galle, Commonwealth Edison t
.H. Naughton,. Commonwealth Edison 0\\0
'W j
-g-q 'a Of
-RLB/jmt 9008160218 900809 PDR ADOCK 05000265
..i<.P PDC y
m d
QUAD-CITIES NUCLEAR POWER STATION.
UNIT THO.
SUMMARY
STATUS OF FUEL PERFORMANCE-END OF CYCLE TEN MAY 1990 At the.end of this reperting period.. Quad-Cities Unit'Two had: completed Ten.
Reactor cycles of operation. During thatitime, 2347 fuel-assemblies lhad-seen 6
duty in the Unit Two core.
No. sipping was performed on reload fuel assemblies at the. End of Cycle Ten.
. This' decision was based-on-chemical and radiochemical data. collected'during
~
Cycle Ten.. which showed no indication--of leakage-or fuel failure.
- For ~ Unit Two Cycle Eleven,168 new LYU-GE9B '(barrier clad) assemblies were 100 percent visually inspected and: loaded.
t C'