Responds to NRC Re Violations Noted in Insp Repts 50-254/98-21 & 50-265/98-21.Corrective Actions:Revised Site ISI Procedure Qcap 0410-06, ISI Plan Implementation for Third Ten Year Insp Interval
ML20205M251
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/09/1999
From: Dimmette J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-254-98-21, 50-265-98-21, SVP-99-063, SVP-99-63, NUDOCS 9904150192
Download: ML20205M251 (6)


Text

T 0,nunonwcann sam >n company (Juad Ones (,cocraung $ution 22710 2(Keih Ascouc North Girdou 11. 612 62 9~ su a ci 3ow,s . m i s

SVP-99-063 April 9,1999 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operatlag License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Reply to a Notice of Violation NRC Inspection Report Nos. 50-254/98021 and 50-265/98021

References:

(1) Letter f rom S.A. Reynolds (USNRC) to O.D. Kingsley (Comed),

dated March 5,1999, "NRC Inspection Report 50-254/98021(DRS); 50-265/98021(DRS) and Notice of Violation" (2) Letter from J. P. Dimmette, ,lr. (Comed), SVP-99-019, to USNRC, dated February 11,1999, "lSI improvement Plan" Enclosed is the Commonwealth Edison (Comed) Company reply to a Notice of .

I Violation (NOV) as requested in the Referenced (1) Inspection Report.

The inspection Report cited one Severity Level IV violation. The violation cited that the '

i licensee had failed to identify to the NRC those welds where complete examination coverage was determined to be impractical along with the basis for that determination for the Second Ten Year Inservice Inspection (ISI) Program Interval which ended in )

1993. j Our response to the NOV is provided in the attachment to this letter.

'l d

., . s -

4 i

9904150192 990409 PDR ADOCK 05000254 0 PM * ,

A nncom company ,

I, l l

April 9,1999 U.S. Nuclear Regulatory Commission

. Page 2  !

This letter contains the following commitments with regard to the NOV.

=

We will submit the relief request (s) for those ASME Section XI weld examinations performed to date during the Third ISI Program interval where the coverage achieved was less than or equal to 90%. Specifically, this includes the first period of the Third ISI Program interval and two refueling outages that have been completed in the second period of the Third ISI Program Interval. The review of examinations completed and the evaluation of percent coverage achieved is in progress. The relief request (s) will be prepared and submitted no later than October 30,1999.

=

For those welds for which a relief request has not yet been submitted for the current Third ISI Program Interval, we will submit a general relief request in accordance with 10 CFR 50.55a that will cover those welds for which an examination of greater than 90 percent of the weld volume was not achieved during the Second ISI Program Interval. This general relief will only be needed until the end of the Third ISI Program Interval, at which time the complete population of I I

welds will have been examined and appropriate specific relief requests will have been submitted. This general relief request will be submitted by May 14,1999.

As agreed to by teleconference between Mr. Steven Dort (Comed) and Mr. Christopher Miller (U.S. NRC) held on April 5,1999, the submittal date for this letter was extended from April 5,1999, to April 9,1999.

Should you have any questions conceming this letter, please contact Mr. Wally Beck, Acting Regulatory Assurance Manager, at (309) 654-2241, extension 3100.

Resp . tfully, )

i

~

jn+rnL Joel P. Dimmette, Jr.

Site Vice President Quad Cities Nuclear Power Station ,

1

Attachment:

Reply to a Notice of Violation cc: Regional Administratcr- NRC Region ill NRC Senior Resident inspector- Quad Cities Nuclear Power Station l l

\

u_

o i

l Attachment Reply to a Notice of Violation SVP 99-063 i (Page 1 of 4) l l

NOTICE OF VIOLATION

, Quad Cities Technical Specification 4.0.E requires that the " inservice inspection of l ASME Code Class 1, Class 2, and Class 3 components . .shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a (g)."

10 CFR 50.55a (g)(5)(iv) requires, "Where an examination requirement by the code or i

addenda is determined to be impractical by the licensee and is not included in the revised inservice inspection program as permitted by paragraph (g)(4) of this section, the basis for this detemlination must be demonstrated to the satisfaction of the Commission not later than 12 months after the expiration of the initial 120-month period of operation and each subsequent 120-month period of operation during which the examination is determined to be impractical."

Contrary to the above, as of December 18,1998, the licensee had not included in a revised Inservice inspection (ISI) program nor demonstrated to the satisfaction of the NRC, the basis for their determination that the code required examination was impractical for the Unit 2 Reactor Pressure Vessel (RPV) nozzle weld N88, the Unit 1 RPV nozzle weld N1 A, and the recirculation system tee to valve weld 02BS-F6.

This is a Severity Level IV Violation (Supplement 1). (50-254(265)/98021-01)

REASON FOR THE VIOLATION The violation was caused by our misinterpretation of the applicability of 10 CFR 50.55a(g) that requires that relief be obtained for ISI Program Non-Destructive ,

Examinations (NDEs) that accomplish less than essentially 100 percent coverage. The 4 timeliness of response to this issue rcas inadequate because required procedural changes were not implemented urf 12 months after identification of the issue.

For the Second Ten Year ISI Program Interval,1983-1993, our interpretation of the i requirements resulted in the conclusion that relief was not required because the

! examinations were performed to the extent practical within the constraints of design, geometry and fabrication. Specifically, Quad Cities Nuclear Power Station, Unit 2 RPV Nozzle-to-Shell weld N8B generally has an Outside Diameter (OD) radius on the nozzle which precludes Ultrasonic Testing (UT) angle beam and straight beam scanning from l the nozzle side of the weld. Due to the geometric condition, scanning is limited to the RPV shell side of the weld. Also, interferences were encountered that limit the extent of scanning from the shell side of the weld.  ;

This misinterpretation is the same as that cited in NRC Information Notice (IN) 98-42, l

" implementation of 10 CFR 50.55 a(g) inservice Inspection Requirements."

l l

L U

i i l Attachment t

Reply to a Notice of Violation SVP 99-063 (Page 2 of 4) l l

CORRECTIVE STEPS TAKEN AND RESULTS ACHIEVED Corrective actions taken as a result of the root cause analysis include the following. l

  • Site ISI procedure, OCAP 0410-06, " Inservice Inspection Plan Implementation for Third Ten Year Inspection Interval," we.s revised to require the iSI Coordinator to record all welds whcse UT results did not meet the requirements of the applicable section of the approved ISI Program and to ensure that a relief request is submitted to the NRC at or before the end of the ISI 10 year interval. This was completed in September,1998. Subsequently, a common corporate procedure, NSP-ER-3016,

" Implementing Procedure for Conduct of Inservice inspection Activities," was implemented that supercedes the site specific procedure, and assigns specific responsibilities for assuring that relief requests are submitted as required.

  • Comed Nondestructive Testing procedure, NDT-C-30, " Ultrasonic Examination of l Reactor Vesses Welds to NRC Reg Guide 1.150," was revised to require calculating and recording the percent weld volume scanned and a determination of whether the percent of weld volume scanned meets ISI Program requirements. The purpose of NDT-C-30 is to detect, locate and evaluate discontinuities within the weld and adjacent base material utilizing UT techniques. To address the coverage issues, j Comed procedure, NDT-Z-1," Method for Calculating ASME Section XI Examination Coverage for Volumetric and Surface Examinations," was created and implemented in August,1998. The proceduro requires that the ISI Coordinator be notified in ,

writing if any welds receive less than essentially 100% coverage (i.e., s 90% as defined in Code Case N-460). Therefore, examinations that are less than the required coverage will be documented, using a standardized approach, and a relief request will be submitted for those limited exams.

(

l The above corrective actions address ISI Programmatic relief request issues and timeliness issues by enhancing the procedural controls for ISI relief request submittals.

On January 8,1999, an evaluation of the effect of this deficiency on operability of the affected components and their respective systems was initiated. The evaluation concluded that an operability concern does not exist based on the following considerations.

  • There were no reportable indications detected for the affected components during examinations in either the Second or Third ISI Program Interval. To date, examination of approximately 55% of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (B&PV), Section XI, " Inservice inspection and Testing," component populaticn is complete for the Third ISI Program Interval.

e a

Attachment Oply to a Notice of Violation SVP 99-063 (Page 3 of 4)

= There are no outstanding generic, failure mechanisms associated with the Nozzle-to-Shell welds. It should be noted that all the feedwater nozzles were modified during earlier refueling outages to prevent thermal fatigue cracking addressed in NUREG 0619, "BWR Feedwater Nozzle and Control Rod Drive Retum Line Nozzle Cracking."

Specialized augmented examinations of the feedwater nozzles were completed satisfactorily as scheduled.

. in general, the inside surface of the Nozzle-to-Shell weld, where flaws, if present, would most likely initiate, are examined during the UT examination.

. in addition to the efforts described above, limited access exams received augmented techniques to increase coverage and detectability of flaws during the recently completed refueling outage 01R15. Specifically, six Nozzle-to-Shell welds, one RPV top head to flange weld and approximately 55 various piping weld configurations 1 were examined utilizing augmented techniques. No reportable indications were )

detected.

To date, for the Third ISI Program Interval, we have completed five refueling outages (01 R13,01R14,01R15 for Unit 1 and O2R13, O2R14 for Unit 2). These inspections j represent approximately 55% of the total population required to be examined during the interval. The components examined during the Third ISI Program interval are essentially the same components examined during the Second ISI Program Interval.

CORFIECTIVE STEPS TAKEN TO AVOID FURTHER VIOLATIONS l We will submit the relief request (s) for those ASME B&PV, Section XI weld examinations performed to date during the Third ISI Program Interval where the coverage achieved was less than or equal to 90% Specifically, this includes the first period of the Third ISI Program Interval and two refueling outages that b We been completed in the second period of the Third ISI Program Interval. The review of examinations completed and the evaluation of percent coverage achieved is in progress. The relief request (s) will be prepared and submitted no later than October 30,1999.

For those welds for which a relief request has not yet been submitted for the current Third ISI Program interval, we will submit a general relief request in accordance with 10 CFR 50.55a that will cover those welds for which an examination of greater than 90 percent of the weld volume was not achieved during the Second ISI Program Interval.

This general relief will only be needed until the end of the Third ISI Program Interval, at which time the complete population of welds will have been examined and appropriate specific relief requests will have been submitted. This general relief request will be submitted by May 14,1999.  !

l All planned milestones of the ISI Program improvement Plan, detailed in Reference (2), l are completed or on schedule.  !

1

c

.O l

i i

l Attachment Reply to a Notice of Violation SVP 99-063 (Page 4 of 4)

DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED l Quad Cities Nuclear Power Station will be in full compliance on May 14,1999, at which j time a general relief request for the remaining Second ISI Program Interval welds will be

! submitted.