ML20153C099

From kanterella
Revision as of 04:32, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-249/86-03 on 860203-06.No Violation Noted
ML20153C099
Person / Time
Site: Dresden Constellation icon.png
Issue date: 02/13/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20153C102 List:
References
NUDOCS 8602180264
Download: ML20153C099 (2)


See also: IR 05000249/1986003

Text

- -

,

-

.- .

.

FEB 131986

Docket No. 50-249

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. A. Westberg of

this office on February 3 through 6, 1986, of activities at Dresden Nuclear

Power Station, Unit 3, authorized by Operating License No. DPR-25 and to the

discussion of our findings with Mr. D. Scott and others of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

cIC,m,,(. 31t 23 B'l L. E*

Luis A. Reyes, Chief

Operations Branch

Enclosure: Inspection Report ~

No. 50-249/86003 R602180264 e'60213

l'DR ADOCM 05000249

See Attached Distribution G PDR

RIII

RIJI /'III RI I III

hWethber

P

/mab

<t Y

Hawkins

)

Hasse

L$

Boy eye

02/13/8 g

180)

'

-

-

.. ,<

.

FEB 131986

- Commonwealth Edison Company 2

-Distribution

cc'w/ enclosure:

D. L. Farrar, Director

of_ Nuclear Licensing

D. J. Scott,' Plant Manager -

DCS/RSB (RIDS)

Licensing Fee Management Branch 4

Resident Inspector, RIII

'Phyllis Dunton, Attorney ~

General's Office, Environmental

'

Control Division