ML20153C099
| ML20153C099 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 02/13/1986 |
| From: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20153C102 | List: |
| References | |
| NUDOCS 8602180264 | |
| Download: ML20153C099 (2) | |
See also: IR 05000249/1986003
Text
-
-
-
,
.-
.
.
FEB 131986
Docket No. 50-249
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. R. A. Westberg of
this office on February 3 through 6, 1986, of activities at Dresden Nuclear
Power Station, Unit 3, authorized by Operating License No. DPR-25 and to the
discussion of our findings with Mr. D. Scott and others of your staff at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
cIC,m,,(. 31t 23 B'l L. E*
Luis A. Reyes, Chief
Operations Branch
Enclosure:
Inspection Report
~
No. 50-249/86003
R602180264 e'60213
l'DR
ADOCM 05000249
See Attached Distribution
G
RIJI
/'III
RI I
III
RIII
L$
h P
<t Y
)
Wethber /mab
Hawkins
Hasse
Boy
eye
02/13/8
g
-
180)
'
-
..
,<
.
FEB 131986
- Commonwealth Edison Company
2
-Distribution
cc'w/ enclosure:
D. L. Farrar, Director
of_ Nuclear Licensing
D. J. Scott,' Plant Manager -
DCS/RSB (RIDS)
Licensing Fee Management Branch
4
Resident Inspector, RIII
'Phyllis Dunton, Attorney
~
General's Office, Environmental
'
Control Division