ML20126L774

From kanterella
Revision as of 07:03, 11 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Evaluation Re Revs 1 & 3 to 10-yr Inservice Insp Program,Including Request for Relief from Certain Hydrostatic Testing Requirements.Revs 1 & 3 Acceptable
ML20126L774
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/06/1985
From: Varga S
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20126L777 List:
References
NUDOCS 8506200142
Download: ML20126L774 (2)


Text

_ _ _ _ _ _ . _ .-

June 6, 1985 Docket Nos. 50-295 DISTRTRIITin and 50-304 ( g et File , NRC PDR u rux ORB #1 Rdg HThompson ORAB Mr. D. L. Farrar JNorris CParrish Director of Nuclear Licensing OELD EJordan Commonwealth Edison Company BGrimes JPartlow Post Office Box 767 TBarnhart 8 ACRS 10 Chicago, Illinois 60690 CMiles SECY RDiggs Gray File

Dear Mr. Farrar:

SUBJECT:

ZION NUCLEAR POWER STATION UNITS 1 AND 2 - RELIEF FROM FIRST TEN-YEAR INSERVICE INSPECTION AND HYDROSTATIC i TESTING REQUIREMENTS t

! By letters dated November 13, 1984 and January 4,1985, the Comonwealth Edison Company (CECO) submitted Revisions 1 and 3 to the Inservice Inspection Program for Zion Units I and 2 for the first ten-year interval.

The revisions included requests for relief from certain hydrostatic testing requirements.

i We have reviewed these submittals and concluded that Revisions 1 and 3 will not adversely impact the safety of Zion Units 1 and 2 and that the proposed alternate testing is acceptable. Detailed technical assessments are l

contained in the enclosed Safety Evaluation. Based on our conclusion, we hereby grant the relief.

l Sincerely, l /s/SVarga Steven A. Varga, Chief

! Operating Reactors Branch #1 j Division of Licensing i

Enclosure:

As stated cc w/ enclosure:

See next page l

1 i

f

$ ORB #1:Dlw 3RB 1: % C-OR 1:DL i CParrish( JNo(ria%,

r s 5/JS'85 $fp5 5 i Oh8 - l N l$ s

.. ~ 9 ,

. _ , . , , - - - ---,.___-.--.-,--,n --

,-,,.--o.,- -.,--,..--.,.----,....a.

Mr. D. L. Farrar Zion Station Commonwealth Edison Company cc: Robert J. Vollen, Esquire The Honorable John E. Grotberg 109 North Dearborn Street United States House of Chicago, Illinois 60602 Representatives Washington, D.C. 20515 Dr. Cecil Lue-Hing Director of Research and Development Mr. Michael C. Parker, Chief Metropolitan Sanitary District Division of Engineering of Greater Chicago Illinois Department of Nuclear 100 East Erie Street Safety Chicago, Illinois 60611 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 Mr. Phillip P. Steptoe Isham, Lincoln and Beale Counselors at Law Three First National Plaza Sist Floor Chicago, Illinois 60602 Susan N. Sekuler, Esquire Assistant Attorney General Environmental Control Division 188 West Randolph Stre!t, Suite 2315 Chicago, Illinois 60f 01 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety ATTN: Manager, Nuclear Facility Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 U.S. Nuclear Regulatory Commission

, Resident Inspectors Office 105 Shiloh Blvd.

Zion, Illinois 60099 James P. Keppler Regional Administrator - Region III  ;

U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 i

--, ,