ML20133N008

From kanterella
Revision as of 15:59, 3 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-293/85-14 on 850528-31.No Violation Noted
ML20133N008
Person / Time
Site: Pilgrim
Issue date: 08/08/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20133N011 List:
References
NUDOCS 8508130346
Download: ML20133N008 (2)


See also: IR 05000293/1985014

Text

_ _ _ - _ _ _ _ _ _

,y .-

.

gG 0 g $85

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject: Inspection Report No. 50-293/85-14

This refers to the routine safety inspection conducted by Mr. F. Paulitz of

this office on May 28-31, 1985 at Pilgrim Nuclear Power Station, Plymouth,

Massachusetts of activities authorized by NRC License No. DPR-35 and to the

discussions of our findings held by Mr. Paulitz with Mr. C. Mathis and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

During the course of this inspection we reviewed the status of your corrective

actions for noncompliance item 81-22-01 which occurred on September 12, 1981.

The long term corrective actions were not complete nor were they scheduled for

completion in the near future. Subsequently, on July 30, 1985, your correc-

tive action program was discussed in a telephone conversation between Mr. J.

I Durr and Mr. C. Mathis. Mr. Mathis specified a tentative schedule of September

[ 30, 1986 to complete the long term corrective action program. Mr. Mathis

!

committed to sending an approved final schedule to this office for this program

within the next two weeks.

Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signed By:

Jacque P. Durr

/ Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosure: NRC Region I Inspec L on Report Number 50-293/85-14

e508130346 e50808

PDR ADOCK 05000293

G PDR

OFFICIAL RECORD COPY IR PILGRIM 85-14 - 0001.0.0

08/07/85

[G0h l\

-. _ _ -

. .

.

> Boston Edison Company M/C Nuclear 2

cc w/ encl:

A. V. Morisi, Manager, Nuclear Management Services Department

C. J. Mathis, Station Manager ,

.Joanne Shotwell, Assistant Attorney General

Paul Levy, Chairman, Department of Public Utilities

W. J. Nolan, Chairman, Plymouth Board of Selectmen

Plymouth Civil Defense Director

Senator Edward P. Kirby

E. R. MacCormack, Senior Regulatory Affairs and Program Engineer (Receives

Safeguards Only)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector ~:

Commonwealth of Massachusetts (2)

bec w/ enc 1:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enc 1)

L. Tripp, Chief, Section #3A, DRP

.

.

i RI:DRSS RI:DRSS

b

RI:DRSS

l Paulitz/geb Anderson Eb tr

7/10/85 ajg gbbf0FFICI'lL J/ h

ECORD COPY IR PILGRIM 85-14 - 0002.0.0

tf44(f

'

07/18/85

_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ - _ _ _ _ _ - _ .