IR 05000313/1987029

From kanterella
Revision as of 13:06, 11 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Discusses Enforcement Conference Conducted on 871218 W/Util Re Insp Repts 50-313/87-29 & 50-368/87-29 on 870818-20. Meeting Summary Encl
ML20149J072
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/18/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
References
EA-87-227, NUDOCS 8802220261
Download: ML20149J072 (4)


Text

.* o FEB i 81988 Docket N License N NPF-46 EA No.287-227 Arkansas Power &' Light Company

. ATTN: .Mr. Gene Campbell Vice President ~, Nuclear Operations P.O. Box 551 Little Rock, Arkansas 72203 Gentlemen:

This refers to the Enforcement Conference conducted in the NRC Region IV Office on December 18, 1987, with you and other members of your staff, and Region IV and Office of Nuclear Reactor Regulation personnel. This conference was related to the findings of the NRC inspection conducted during the period August 18-20, 1987, which were documented in our NRC Inspection Report 50-313/87-29; 50-368/87-29, dated December 3, 198 The subjects discussed at this meeting are described in the enclosed Meeting Sumar In accordance with Section 2.790 of the NRC's "Rules of Practice " Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Roo Should you have any questions concerning this matter, we will be pleased to discuss them with yo

Sincerely, Original Signed By A. B. Deach L. J. Callan, Director Division of Reactor Projects

Enclosure:

Meeting Summary

REGION IV ARKANSAS POWER & LIGHT COMPANY NRC Attendees: J. Callan, Director, Division of Reactor Projects A. Beach, Deputy Director, Division of Reactor Projects J. Milhoan, Director, Division of Reactor Safety D. Hunter, Chief Technical Support Section W. Seidle, Chief, Operational Programs Section W. Johnson, Senior Resident Inspector G. Dick, Project Manager, NRR H. Scott, Enforcement Staff J. Gagliardo, Chief, Operations Branch R. Hall,. Deputy Director, Division of Radiation Safety and Safeguards J. Tapia, Project Engineer, Division of Reactor Projects Licensee Attendees: T. G. Campbell, Vice President Nuclear D. Howard, Manager Licensing L. W. Humphrey, General Manager, Nuclear Quality C. H. Turk, Superintendent Nuclear Engineering R. W. Howerton, Manager Design Service R. Lane, Manager Engineering J. Levine, Executive Director D. E. James, Licensing Supervisor

,