Forwards Insp Repts 50-313/90-10 & 50-368/90-10 on 900514-0601.No Violations or Deviations Identified
ML20055D166
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/27/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Carns N
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20055D167 List:
References
NUDOCS 9007050072
Download: ML20055D166 (3)


See also: IR 05000313/1990010

Text

-

'

, .

e

!

p

JUN 27 IIED

i,

In Reply Refer 10:

Dockets: 50-313/90-10

50-368/90-10

Arkansas Nuclear One

ATTH: Neil $. Carns, Vice

President Nuclear

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by the Nuclear Regulatory Commission (NRC)

during the period of May 14 through June 1,1990, of activities authorized by

NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One (ANO), Units 1

and 2.

At the conclusion of the inspection, our findings were discussed with

Mr. J. Yelverton and other members of your staff.

The purpose of this inspection was to evaluate the ability of the service

water systems for ANO, Units 1 and 2, to perform their safety functions,

in

addition, a limited assessment was performed of the engineering support provided

to ANO. Within these areas, the inspection consisted of selective examination

of procedures and representative records, interviews with personnel, and

observations by the inspectors. The inspection findings are documented in the

enclosed inspection report. This report includes specific inspection followup

fordiagnosticevaluationteamfindings(referenceDiagnosticEvaluationTeam

Report issued December 21,1989).

We have also examined actions you have taken with regard to other previously

identified inspection findings. The status of these items is discussed in

paragraphs 3.3.3 and 3.3.8 of the enclosed report.

Within the areas inspected, no violations or deviations were identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original S6gnod By:

Samuel J. Collins

Samuel J. Collins, Director

Division of Reactor Projects

Enclosure:

(seenextpage)

i

RIV:PPS Q L

C:MQPS g

D:DR4

D

'

'

PWagner /

IBarnes

L) Callan

J

1110s

(p41/90

6/H/90

h hp/90

f,kd0

0007050072 9006?7

'

FDR

ADOCK 05000315

O

F DC.

a

'

'

'

'

.,

+1

.

j, ' ,J. .

-

Y

! Arkansas Nuclear.One

-2;

'

h,

i

-Enclosure:

,3'

Appendix - NRC Inspection Report

L,

50-313/90-10 w/ Attachment:

50-36B/90-10.w/ Attachment

M

cc w/ enclosure:

[!l

Entergy Operations, Inc.

.ATTH: Donald C. Hintz, Executive

.

,

k.

Vice President

4

P.0; Box 31995-

1

p

Jackson, Mississippi 39286

.,

0

  • > _

ATTN:: Gerald W. Muench, Vice President

Entergy Operations, Inc.

'

,

.

Operations Support

'

.P.O. Box 31995

Jackson, Mississippi 39286

Arkansas Nuclear One-

' ATTN: Early Ewing General Manager

'

Technical Support and Assessment

P.O. Box 608~

Russellville,-Arkansas 72801

.

Arkansas Nuclear One

"

ATTN: Jerry Yelverton, Director

Nuclear Operations

Ro'ute 3, Box 137G

Russellville, Arkansas 72801

r

Combustion Engineering, Inc...

,

ATTN: Charles B. Brinkman, Manager

Washington Nuclear Operations

12300.Twinbrook Parkway, Suite 330

_Rockville, Maryland 20852

. Honorable Joe W. Phillips

. ,

l-

County Judge of. Pope County

l~

Pope County Courthouse

Russellville, Arkansas 72801

Bishop, Cook,_ Purcell & Reynolds

' ATTN:, Nicholas S. Reynolds,~Esq.

.

1400 L Street, N.W.

Washington, D.C.

20005-3502

.,-

.

}

w

!

i

>

.u

,

,'

.

.

'P

' Arkansas Nuclear One

-3-

' Arkansas Department of Health.

ATTN: Ms. Greta.Dieus Director

Division of Environmental Health

m,

Protection

'

4815 West Markem Street

Little Rock, Arkansas 72201

I

Babcock & Wilcox

Nuclear Power Generation Division

,

ATTN: Mr. Robert B. Borsum

1700 Rockville Pike, Suite 525

L

Rockville, Maryland 20852

'

U.S. Nuclear Regulatory Comission

'

ATTN:- Senior Resident Inspector

,

1 Nuclear Plant Road

"

Russellville, Arkansas 72801

U.S. Nuclear Regulatory Comission

!

ATTN: Regional Administrator, Region IV

611 Ryan Plaza Drive. Suite 1000

Arlington, Texas 76011

4

0

' bectoDMB(IE01)

bec distrib, by RIV:

  • R. D. Martin:
  • Resident Inspector
  • DRSS-FRPS
  • SectionChief(DRP/A)

'

Lisa.Shea,RM/ALF

  • RIV File
  • DRP
  • MIS System-
  • RSTS Operator
  • Project Engineer (DRP/A)

'

  • DRS
  • T. Alexion, NRR Project Manager (MS:

13-E-21)

  • C

Posiusny, NRR Project Manager (MS:

13-D-18)

  • I. Barnes

. i

'

  • P. Wagner

,

L

- *T..Stetka

  • L. E11ershaw
  • L.-Gilbert
  • w/766:

.

t

'

.

r

w

~m

m-

-

-

p

y

,

,q.-..,-

-

w

w..

'