ML20205C029: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:- ;    - ,.
                                        ,                                                July 31,1986
                                ,                                                                          1
  ,                                        m Docket No. 50-293 M:. James'M. Lydon                                                                                !
Chief Operating Officer Roston Edison Company 800 Boylston Street Boston, Massachusetts 0219.'
 
==Dear M.. Lydon:==
 
==SUBJECT:==
Generic letter 83-28, Item 1.2 Post-Trip Review (TAC #53619)
Re:              Pilgrim Nuclear Power Station By letter dated November 7, 1983, the Boston Edison Company responded to our Generic Letter 83-28 with regard to required actions based upon the generic implications of the Salem ATWS events. We have completed our review of your response concerning Item 1.2 and conclude that the post-trip review data and infonnation capabilities are acceptable.
A copy of our Safety Evaluation relative to this matter is enclosed.
Sincerely, QBIGINAL SIGiED B'l John A. Zwolinski, Director BWR Proiect Directorate #1 Division of BWR Licensing
 
==Enclosure:==
 
As stated DISTRIBUTION xDocket Eile NRC PDR Local PDR BWD1 Rdg.
RRernero OGC-Beth. (Info only)
EJordan        GHolahan BGrimes JPartlow NThompson JZwolinski Fleech CJamerson ACRS (10)                    8608120232 860731 POR      ADOCK 05000293 ABournia                      p                    PDR JKramer Pilgrim File LM OFC : DBL:PD#1        : DBL:PD#1                  #1  :              :            :          :
_ ---_&  yg            _______:-_-_ -_-____:__________--:-__----___--:---------__
NAME :CJamerso        :Pleech          -
____linski
                                              >o        :              :            :          :
DATE :~7 /3L/86        :'7 / 11/86                      :              :            :          :
: 7 /V1,/86
 
Mr. James M. Lydon Boston Edison Company                      Pilgrim Nuclear _ Power Station cc:
Mr. Alfred E. Pedersen, Station Manager Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360 Resident Inspector's Office U. S. Nuclear Regulatory Commission Post Office Box 867 Plymouth, Massachusetts 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, Massachusetts 02360 Office of the Commissioner Massachusetts Department of Environmental Quality Engineering One Winter Street Boston, Massachusetts 02108 Office of the Attorney General 1 Ashburton Place 19th Floor Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, Massachusetts 02111 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406    .
Mr. James D. Keyes Roston Edison Company 25 Braintree Hill Office Park Braintree, Massachusetts 02184 l
l l
l
                      -                      . _  _          ~ . _ .            . - - . -}}

Revision as of 06:23, 30 December 2020

Forwards Safety Evaluation Accepting Util 831107 Response to Generic Ltr 83-28,Item 1.2, Post-Trip Review
ML20205C029
Person / Time
Site: Pilgrim
Issue date: 07/31/1986
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Lydon J
BOSTON EDISON CO.
Shared Package
ML20205C034 List:
References
GL-83-28, TAC-53619, NUDOCS 8608120232
Download: ML20205C029 (2)


Text

- ; - ,.

, July 31,1986

, 1

, m Docket No. 50-293 M:. James'M. Lydon  !

Chief Operating Officer Roston Edison Company 800 Boylston Street Boston, Massachusetts 0219.'

Dear M.. Lydon:

SUBJECT:

Generic letter 83-28, Item 1.2 Post-Trip Review (TAC #53619)

Re: Pilgrim Nuclear Power Station By letter dated November 7, 1983, the Boston Edison Company responded to our Generic Letter 83-28 with regard to required actions based upon the generic implications of the Salem ATWS events. We have completed our review of your response concerning Item 1.2 and conclude that the post-trip review data and infonnation capabilities are acceptable.

A copy of our Safety Evaluation relative to this matter is enclosed.

Sincerely, QBIGINAL SIGiED B'l John A. Zwolinski, Director BWR Proiect Directorate #1 Division of BWR Licensing

Enclosure:

As stated DISTRIBUTION xDocket Eile NRC PDR Local PDR BWD1 Rdg.

RRernero OGC-Beth. (Info only)

EJordan GHolahan BGrimes JPartlow NThompson JZwolinski Fleech CJamerson ACRS (10) 8608120232 860731 POR ADOCK 05000293 ABournia p PDR JKramer Pilgrim File LM OFC : DBL:PD#1  : DBL:PD#1 #1  :  :  :  :

_ ---_& yg _______:-_-_ -_-____:__________--:-__----___--:---------__

NAME :CJamerso :Pleech -

____linski

>o  :  :  :  :

DATE :~7 /3L/86  :'7 / 11/86  :  :  :  :

7 /V1,/86

Mr. James M. Lydon Boston Edison Company Pilgrim Nuclear _ Power Station cc:

Mr. Alfred E. Pedersen, Station Manager Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360 Resident Inspector's Office U. S. Nuclear Regulatory Commission Post Office Box 867 Plymouth, Massachusetts 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, Massachusetts 02360 Office of the Commissioner Massachusetts Department of Environmental Quality Engineering One Winter Street Boston, Massachusetts 02108 Office of the Attorney General 1 Ashburton Place 19th Floor Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, Massachusetts 02111 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 .

Mr. James D. Keyes Roston Edison Company 25 Braintree Hill Office Park Braintree, Massachusetts 02184 l

l l

l

- . _ _ ~ . _ . . - - . -