ML20155D590: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:~
                                                                                            g)
    !
      .
        f          jog                          UNITED STATES                                f
      4'              o              NUCLEAR REGULATORY COMMISSION
        d              I                      WASHINGTON, D. C. 20655
        e              *
        s.,
            *****
                    /
                                              April 15, 1986
      0;cket No. 50-293
  ,
              Boston Edison Company
              ATTN: Mr. William D. Harrington
                      Vice President, Nuclear
              800 Boylston Street
              Boston, Massachusetts 02199
              Gentlemen:
              SUBJECT:    INSPECTION NO. 50-293/85-35
              Enclosed is the report of the team inspection conducted by Mr. R. C. Wilson
              and other NRC representatives on December 9 to 13, 1985, at your Braintree
              engineering offices and the Pilgrim Nuclear Power Station of activities
              authorized by NRC License No. DPR-35. The team's findings were discussed with
            you and members of your staff at the conclusion of the inspection. The
              inspection reviewed your implementation of a program as required by 10 CFR
              50.49 for establishing and maintaining the qualification of electric equipment
            within the scope of 10 CFR 50.49. Within these areas, the inspection consisted
              of examinations of selected procedures and records, interviews with personnel,
            and observations by the inspectors.
            The inspection determined that you have implemented a program to meet the
              requirements of 10 CFR 50.49. Two deficiencies in your program implementation,
'
            summarized in Appendix A, are classified as Potential Enforcement / Unresolved
              Items and will be referred to the NRC Region I office for further action.
            These deficiencies involve failure to fully document the qualification of
            Barton 288A main steam flow switches and General Electric EB-25 terminal
            blocks. Three additional concerns are classified as Open Items, and a
            feture NRC inspection will review your actions concerning them. Details
            of all the deficiencies and concerns a e discussed in the enclosed
            inspection report.
            Your corrective actions regarding the identified deficiencies and concerns
            should not be delayed pending either a future NRC inspection or further action
            by the NRC Region I office.
                8604170370 860415
                PDR    ADOCK 05000293
                G:                PDR
 
r
  .;                                              ..
      .
  ls'
      ..
        Boston Edison Company              -2-                      April 15,.1986
        We are available to discuss any questions you have concerning this inspection.
                                            Sincerely,
                                                          '
                                                t%<  %<      .k
                                            Gary.G. ech, Chief
                                            Vendor Program Branch
                                            Division of Quality Assurance,' Vendor
                                              and Technical Training Center Programs
                                            Office of Inspection and Enforcement
        Enclosure:
        Inspection Report No. 50-293/85-35
 
E
,
        .v
    .
  4
    &    Boston Edison Company                -2-                      April 15, 1986
        We are available to discuss any questions you have concerning this inspection.
                                            Sincerely,
                                              W    SWW
                                                Gary G.Zech -
                                            Gary G. Zech, Chief
                                            Vendor Program Branch
                                            Division of Quality Assurance, Vendor
                                                and Technical Training Center Programs
                                            Office of Inspection and Enforcement
        Enclosure:
        Inspection Report No. 50-293/85-35
        Eseitibution:
        GW
      $MPDR
        VPB Reading
        DQAVT Reading
        JTaylor
          RVollmer
          BGrimes
          UPotapovs
          SAlexander
,
          GHubbard
          AJohiuon
,        RWilson(2)
          RLaGrange, NRR
          NLe, NRR
          Pleech, NRR
          MTrojovsky,INEL
          ERichards, SNL
          MJacobus, SNL
,
          LCheung, RI
l
          CAnderson, RI
          JDurr, RI
          JThomas, DPC
          VPB:DQAVT      SC/VPB:DQAVT    RI                  PB:0QAVT
!
c
          RWilson:tt    UPotapovs      CAnderson      GGZech
                                                        (/q/86
                                                                          g'
!        t/g/86        f/3/86          4 / 7 /86
                                          ew                                          g60
                                                                                          ,
                                                                                        \
 
                                                          _                    _ _ . --
.
  .
                                                                                        .
.
  -
                                          APPENDIX A
      Potential Enforcement / Unresolved Items
    As a result of the special equipment qualification inspection on December 9
    to 13, 1985, the following items have been referred to NRC Region I as
      Potential Enforcement / Unresolved Items (paragraph' references are to detailed
      portions of the inspection report).
      1.  Contrary to paragraphs (f) and (k) of 10 CFR 50.49 and Section 5.2.5 of
          the D0R Guidelines, at the time of the inspection Boston Edison Company's
          (BECO) files did not adequately demonstrate qualification of Barton 288A
          main steam flow switches because of failure to demonstrate that plant
          accuracy requirements are satisfied. (Paragraph 4.D(1), Item 50-293/
          85-35-1.)
      2.  Contrary to paragraphs (f) and (k) of 10 CFR 50.49 and Section 5.2.5 of
          the 00R Guidelines, at the time of the inspection BEC0's files did not
          adequately demonstrate qualification of General Electric EB-25 terminal
          blocks because of failure to demonstrate that plant performance
          requirements are satisfied.
}}
}}

Latest revision as of 19:55, 17 December 2020

Forwards Insp Rept 50-293/85-35 on 851209-13.Two Deficiencies Involving Failure to Fully Document Qualification of Barton 288A Main Steam Switches & GE EB-25 Terminal Blocks Classified as Potential Enforcement Item
ML20155D590
Person / Time
Site: Pilgrim
Issue date: 04/15/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20155D594 List:
References
NUDOCS 8604170370
Download: ML20155D590 (4)


See also: IR 05000293/1985035

Text

~

g)

!

.

f jog UNITED STATES f

4' o NUCLEAR REGULATORY COMMISSION

d I WASHINGTON, D. C. 20655

e *

s.,

/

April 15, 1986

0;cket No. 50-293

,

Boston Edison Company

ATTN: Mr. William D. Harrington

Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

SUBJECT: INSPECTION NO. 50-293/85-35

Enclosed is the report of the team inspection conducted by Mr. R. C. Wilson

and other NRC representatives on December 9 to 13, 1985, at your Braintree

engineering offices and the Pilgrim Nuclear Power Station of activities

authorized by NRC License No. DPR-35. The team's findings were discussed with

you and members of your staff at the conclusion of the inspection. The

inspection reviewed your implementation of a program as required by 10 CFR

50.49 for establishing and maintaining the qualification of electric equipment

within the scope of 10 CFR 50.49. Within these areas, the inspection consisted

of examinations of selected procedures and records, interviews with personnel,

and observations by the inspectors.

The inspection determined that you have implemented a program to meet the

requirements of 10 CFR 50.49. Two deficiencies in your program implementation,

'

summarized in Appendix A, are classified as Potential Enforcement / Unresolved

Items and will be referred to the NRC Region I office for further action.

These deficiencies involve failure to fully document the qualification of

Barton 288A main steam flow switches and General Electric EB-25 terminal

blocks. Three additional concerns are classified as Open Items, and a

feture NRC inspection will review your actions concerning them. Details

of all the deficiencies and concerns a e discussed in the enclosed

inspection report.

Your corrective actions regarding the identified deficiencies and concerns

should not be delayed pending either a future NRC inspection or further action

by the NRC Region I office.

8604170370 860415

PDR ADOCK 05000293

G: PDR

r

.; ..

.

ls'

..

Boston Edison Company -2- April 15,.1986

We are available to discuss any questions you have concerning this inspection.

Sincerely,

'

t%<  %< .k

Gary.G. ech, Chief

Vendor Program Branch

Division of Quality Assurance,' Vendor

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosure:

Inspection Report No. 50-293/85-35

E

,

.v

.

4

& Boston Edison Company -2- April 15, 1986

We are available to discuss any questions you have concerning this inspection.

Sincerely,

W SWW

Gary G.Zech -

Gary G. Zech, Chief

Vendor Program Branch

Division of Quality Assurance, Vendor

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosure:

Inspection Report No. 50-293/85-35

Eseitibution:

GW

$MPDR

VPB Reading

DQAVT Reading

JTaylor

RVollmer

BGrimes

UPotapovs

SAlexander

,

GHubbard

AJohiuon

, RWilson(2)

RLaGrange, NRR

NLe, NRR

Pleech, NRR

MTrojovsky,INEL

ERichards, SNL

MJacobus, SNL

,

LCheung, RI

l

CAnderson, RI

JDurr, RI

JThomas, DPC

VPB:DQAVT SC/VPB:DQAVT RI PB:0QAVT

!

c

RWilson:tt UPotapovs CAnderson GGZech

(/q/86

g'

! t/g/86 f/3/86 4 / 7 /86

ew g60

,

\

_ _ _ . --

.

.

.

.

-

APPENDIX A

Potential Enforcement / Unresolved Items

As a result of the special equipment qualification inspection on December 9

to 13, 1985, the following items have been referred to NRC Region I as

Potential Enforcement / Unresolved Items (paragraph' references are to detailed

portions of the inspection report).

1. Contrary to paragraphs (f) and (k) of 10 CFR 50.49 and Section 5.2.5 of

the D0R Guidelines, at the time of the inspection Boston Edison Company's

(BECO) files did not adequately demonstrate qualification of Barton 288A

main steam flow switches because of failure to demonstrate that plant

accuracy requirements are satisfied. (Paragraph 4.D(1), Item 50-293/

85-35-1.)

2. Contrary to paragraphs (f) and (k) of 10 CFR 50.49 and Section 5.2.5 of

the 00R Guidelines, at the time of the inspection BEC0's files did not

adequately demonstrate qualification of General Electric EB-25 terminal

blocks because of failure to demonstrate that plant performance

requirements are satisfied.