| | title = Insp Rept 50-416/88-05 on 880307-11.No Violations Noted. Major Areas Inspected:Offgas Sys Hydrogen Control & Offsite Dose Assessments During Charcoal Bed Bypass | | | title = Forwards Confirmatory Measurement Results Re Spiked Liquid Samples Sent for Selected Radiochemical Analyses as Suppl to Insp Rept 50-416/88-05.Comparative Results in Agreement for H-3 & Fe-55 Analyses |
| | author name = Kahle J, Marston R | | | author name = Decker T |
| | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) | | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| | addressee name = | | | addressee name = Kingsley O |
| | addressee affiliation = | | | addressee affiliation = SYSTEM ENERGY RESOURCES, INC. |
| | docket = 05000416 | | | docket = 05000416 |
| | license number = | | | license number = |
| | contact person = | | | contact person = |
| | document report number = 50-416-88-05, 50-416-88-5, NUDOCS 8804150357 | | | document report number = NUDOCS 8810250452 |
| | package number = ML20151E619
| | | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE |
| | document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS | | | page count = 4 |
| | page count = 14 | |
| }} | | }} |
|
| |
|
Line 19: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:. | | {{#Wiki_filter:_ _ _ _ _ _ _ _ _ - _ _ _ |
| | . |
| ' | | ' |
| . | | OCT 0 71988 diu'4) |
| ' ,/# " "'*'
| | - |
| y''
| | ,. |
| | System Energy Resources, In / ATTN: Mr. O. D. Kingsley, J Vice President Nuclear Operations P. O. Box 23054 Jackson, MS 39205 Gentlemen: |
| | SUBJECT: DOCKET NO. 50-416, CONFIRMATORY MEASUREMENT RESULTS, SUPPLEMENT TO INSPECTION REPORT NO 50-416/88-05 As part of the NRC Confirmatory Measurements Program, spiked liquid samples were sent on June 2, 1988, to your Grand Gulf Facility for selected radiochemical analyse We are in receipt of your analytical results transmitted to us by your letter dated August 2,1988, ard the comparison of your results to the known values are presented in Enclosure 1 for your information. The acceptance criteria for the comparisons are listed in Enclosure In our review of the data, comparative results were in agreement for H-3 and Fe-55 analyses and disagreement for Sr-89 and Sr-90 analyse These results were discussed with Mr. J. Lassiter of your Grand Gulf facility by telephone |
| | , conversation on September 8, 1988. Mr. Lassiter requested that an additional liquid sample spiked with Sr-89 and Sr-90 be sent to your facility for reanalysis. The additional spiked sample is due to be shipped to your facility within the next 30 days and we request that the analyses be completed as soon as practicable but no later than 60 days from receipt of the sample. Results should be sent to: U.S. Nuclear Regulatory Commission, Attn: Mr. J. B. Kahl These results and any results from previous years pertaining to these analyses will be discussed at future NRC inspection |
| | |
| | Sincerely, |
| | ' |
| | Thomas R. Decker, Acting Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards Enclosures: |
| | 1. Confirmatory Measurement Cocparisons Criteria for Comparing Analytical Measurements Cc w/encls: (See page 2) |
| | 8910250452 681007 i PDR ADOCK 05000416 g 0 PEC (( |
| | un |
|
| |
|
| | .* |
| * | | * |
| /.j P/
| | , . |
| m
| | * |
| 'f UNITED STATES NUCLEAR REGULATORY COMMISSION REGION ll 4, 101 MARIETTA ST., .....,o ATLANTA GEORGIA 30323 | | . |
| , | | System Energy Resources, In cc w/encis: |
| APR 0 71988 Report No.: 50-416/88-05 Licensee: System Energy Resources, In Jackson, MS 39205 Docket No.: 50-416 License No.: HPF-29
| | IT.H.Cloninger.VicePresident, Nuclear Engineering and Support |
| -
| | /W.T.Cottle,GGNSSiteDirector dC R. Hutchinson, GGNS General Manager JJ. G. Cesare, Director, Nuclear Liccasing ; |
| . .
| | JR. T. Lally, Manager of Quality ,%ssurance Middle South Services, In JR.B.McGehee, Esquire i |
| Facility Name: Grand Gulf Inspection Conducted: March 7-11, 1988 Inspectors:
| | , Wise Carter, Child, Steen and Caraway l 1N. S. Reynolds, Esquire |
| R. R. Marston N
| | / Bishop, Cook, Purcell & Reynolds R. W. Jackson, Project Engineer State of Mississippi jbecw/encls: |
| Date Signed Accompanying P,ers nnel: C. A. Hughey Approved by: bid
| | 1 NRC Resident Inspector l a(DRS.TechnicalAssistant |
| . Kahle, Section Chief e//f/8 Date 6igned ision of Radiation Safety and Safeguards SUMMARY Scope: This special, announced inspection was conducted in the areas of offgas '
| | , , |
| system hydrogen control and offsite dose assessments during charcoal bed bypasse Results: No violations or deviations were identified.
| | ; L. Kintner, NRR l Document Control Desk |
| | | . |
| t i
| | O |
| a hDR AB8Fofo882T6 DCD o
| | ! |
| | | ; |
| .
| | I l |
| *
| | . |
| .
| |
| ,
| |
| .
| |
| REPORT DETAILS Persons Contacted Licensee Employees R. Brinkman, Radiological Engineer
| |
| *J. Cross, Site Director
| |
| *C. Elisaesser, Operations Coordinator
| |
| *R. Hutchinson, General Manager J. Lassetter, HP/ Chemistry Specialist
| |
| *A. McCurdy, Manager, Plant Operations
| |
| *J. Parrish, Chem / Rad Superintendent G. Smith, Plant Chemist
| |
| *J. Summers, Compliance Coordinator Other licensee employees contacted included engineers, technicians, cperators, and office personne Other Organizations L. Nesbitt, General Electric Company Nuclear Ragulatory Commission
| |
| *R. Dutcher, Senior Resident inspector
| |
| *J. Mathis, Resident Inspector
| |
| * Attended exit interview Exit Interview The inspection scope and findings were summarized on March 11, 1988, with those persons indicated in Paragraph 1. The inspector described the areas
| |
| - 4.nspected and discussed in detail the inspection findings listed below.
| |
| | |
| ,
| |
| ' | | ' |
| No dissenting conments were received from the license The licensee did not identify as proprietary any of the material provided to or reviewed by the inspector during this inspection.
| | ! |
| | | . |
| l Licensee Action on Previous Enforcement Matters This subject was not addressed in the inspection.
| | II g fp I fth |
| | | ; SA3amovitz /g9Kahle HDahje 10/p /88 // 10 7 /88 10/) /88 |
| . Introduction On February 27, 1988, while changing from the "B" to the "A" steam jet air ejector (SJAE), operations personnel noticed a sudden loss of offgas Flow and spiking of the hydrogen (H,) inline analyzers located in the offgas syste This was caused by a sudden burn of excess 2H within the offgas
| | ; |
| | |
| l | | l |
| ?
| | ,_ _ . |
| _ _ _ _ _ - _ _ - _ _ _ _ - - _ _ _ - _ _ - _ _ _ _ _ _ - _ _ _ - _ _ _ _ _
| |
|
| |
|
| _ _ _ _ _ _ _ _ . _ _ _ _ | | _ _ , _ _ _ _ . ._ _ . _ _ -. _ _ _ _ _ - _ _ . - _ |
| .. . ..
| | . _ - - - _ - .~_ .. |
| | . . |
| | ' |
| . | | . |
| -
| | f I |
| .
| | , |
| | | ENCLOSbRE 1 > |
| l system. Although this burn apparently caused only minor equipment damage, l there was a potential for major equipment damage and personnel injury, exposure, and contaminatio The following paragraphs include a description of the event, the causes and corrective actions related to the burn and the dose assessment l relating to the increase in gaseous radioactivity discharged from the plan . General System Description Design Objectives The offgas system at Grand Gulf was designed to meet the following regulatory objectives:
| | CONFIR!tATORY MEASUREMENT COMPARISONS OF H-3, Fe-55, Sr-89, AND Sr-90 ANALYSES , |
| -
| | l FOR GRAND GULF NUCLEAR PLANT ON AUGUST 2, 1988 [ |
| The ALARA objectives of 10 CFR 50, Appendix 1
| | I ; |
| - The dose restrictions of 10 CFR 20, Appendix B
| | I Licensee NRC Ratio f Isotepe (uCi/ml) (uti/ml) Resolution (Licensee /NRC) r,omparisen [ |
| - General Design Criteria No. 60 (Control of Releases of Radioactive Materials to the Environment) and No. 64 (Monitoring of Radioactive Releases) of 10 CFR 50, Appendix A The primary design objectives of the system were:
| | ! |
| - To recombine hydrogen and oxygen gases produced in the reactor by the radiolytic decomposition of water and therefore reduce explosion hazard To provide sufficient hold-up time for radioactive activation products and fission products to decay prior to releas To minimize the release of the particulate daughter products of noble gase To provide for the controlled release of radioactive gases to the environment during nonnal and off-normal operating condition System Description The inspector reviewed system description:. from the FSAR and current plant drawings, held discussions with licensee representatives, and performed a walkdown of the system with a cognizant licensee representativ (1) There were two redundant offgas processing system trains, each one capable of processing the entire offgas flow from the plant (A and B trains). Each train was composed of systems to process noncondensable gases and to control the release of radioactive
| | . |
| _ _ _ _ - _ . _ _ _ _ _ - _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ -
| | H-3 1.92F-5 1.80t0.04E-5 45 1.07 Agreement l Fe-55 1.77E-5 1.7720.04E-5 44 1.00 Aarcement |
| | - |
| | ! |
|
| |
|
| _ _ _ _ _ _ _ _ _
| | Sr-89 7.78E-5 1.3610.04E-6 34 0.57 Disagreement |
| .,
| | ., |
| - | | Sr-90 5.2SE-6 8.1910.33E-6 25 0.04 Disagreement |
| . | | . |
| | | I l |
| effluents to the env'ronment. The condenser air removal system ,
| | . |
| and the offgas system perform these functions. Neither train )
| | 1 i i |
| contains rotating part (2) Condenser Air Removal System The condenser air removal system consists of a first stage steam jet air ejector (SJAE), an intercondenser and a second stage SJAE. Main steam flows to the air ejectors to:
| | ! |
| - Pump noncondensable gases from the main condenser
| | . |
| - Provide the motive force for the offgas system
| | a a i |
| - Dilute the offgas stream to less than 4% hydrogen concentration, and
| | , t |
| - Remove noncondensables from the offgas flo An intercondenser is located between the first and second stage SJAE The intercondenser is cooled by plant service water (PSW) and functions to remove moisture from the offgas flo The significant gaseous wastes removed from the main turbine condenser by the SJAEs consist of the following:
| |
| - Radiolytic hydrogen and oxygen
| |
| - Condenser air inleakage
| |
| - Nitrogen-13, Nitrogen-16, and Oxygen-19
| |
| - Krypton, Xenon, and Iodine isotopes These gases are produced in the core region and travel to the main condenser along with the main stea (3) Offgas System The offgas system begins at the outlet of the second stage SJAE and ends at a connection to the radwaste ventilation syste The following is a brief sequential discussion of the major system components and their operating function (a) The offgas reheater (heat exchanger) superheats the gases and steam from the second stage SJAE to about 300*F before l entering the recombiner. This increases the recombiner catalyst efficiency by eliminating moisture. Main steam is used as a heat sourc (b) The catalytic recombiner recombines the hydrogen and oxygen produced by radiolytic decomposition by passing the process flow over trays of a platinum alloy catalys The water vapor temperature at the exit of the recombiner is normally in excess of 600'F. Gas flow rate prior to the recombiner is in excess of 100 standard cubic feet per minute (SCFM)
| |
| and is 20 SCFM as it exits the recombiner. This latter
| |
| _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
| |
| | |
| ______-
| |
| .
| |
| -
| |
| .
| |
| | |
| flow rate remains constant through the rest of the offgas syste (c) The superheated water vapor and inleakage air mixture from the recombiner flows through the offgas condenser where the bulk of the water vapor is cooled (160 F), condensed and remove This condenser (heat exchanger) is cooled by Turbine Plant Cooling Water (TPCW) flow through the tube sid (d) The process flow enters a water separator where entrained water droplets are removed as the flow passes through a stainless steel wire mesh de-entraining elemen (e) Two redundant inline hydrogen analyzers continuously monitor the H7 concentrations in the offgas process flow prior to entering the hold-up line. If a preset value on the monitors is exceeded, a main control room annunciator is actuated. An inline pretreatment radiation monitor also monitors the radioactivity of the process flow prior to entering the hold-up line. A more detailed discussion of these monitors is included in Paragraph (f) A hold-up line, consisting of a straight run of piping 500 feet long and 6 inches I.D. provides a delay of approximately seven and one-half minutes to allow for the decay of short-lived radionuclide (g) The cooler condenser (heat exchanger) cools the process flow by means of a glycol refrigeration system to as low as possible without freezing (35 F). This removes moisture from the process flow.
| |
| | |
| l (h) Another moisture separator removes any moisture droplets in the process ficw that are not removed in the cooler condense (i) A high efficiency particulate air prefilter element (aluminum separator and glass fiber filter elements)
| |
| removes particulate daughter products of fission product gases from the process flo (j) Any additional moisture is removed by passing the process flow through one of four desiccant dryer beds. The dryer beds are regenerated on a regular basis using an electric heater / dryer chiller system. The dewpoint of the process flow after the desiccant cryers is normally about -80 (k) Two redundant dewpoint analyzers continuously monitor the process flow relative humidit Excess moisture in the
| |
| _ _ _ _ _ - _ _ _ _ _ _ _
| |
| | |
| .
| |
| .-
| |
| -
| |
| .
| |
| | |
| process flow reduces the adsorption efficiency of noble gases on the charcoal bed (1) . The gas coolers further cool the process flow prior to entering the charcoal adsorber beds by means of a glycol refrigeration system. This cooling helps increase charcoal adsorption efficienc (m) Eight charcoal adsorber vessels, each containing about three tons of charcoal, adsorb radioactive fission product gases (xenon and krypton) thereby allowing significant delay and allowing for their deca Any particulate daughter products, aloag with radioactive isotopes c~
| |
| iodine, are retained in the charcoal beds. The gas coolers and adsorber beds are enclosed in a refrigerated vault kept at 0 A bypass line is constructed around the gas coolers and adsorber beds and is used during startu (n) Two redundant post-treatment radiation monitors continuously monitor radiation levels within the process stream. These monitors provide for automatic termination of offgas releases in case of high radiation levels in the process strea A more detailed discussion of these monitors is included in Paragraph (o) The process flow is then filtered through high efficiency particulate air (HEPA) after-filters to remove any remaining particulate daughter products and carbon dus (p) The final effluent from the offgas system is incorporated into the radwaste ventilation system which is monitored for radioactivity prior to release to the environment. A more detailed discussion of the radiation monitors is included in Paragraph (q) Several water-filled loop seals are located along each train to prevent gas escape from the process flow through various system drain c. Radiologicai Monitoring Systems The following systems were evaluated:
| |
| (1) Offgas Pretreatment Radiation Monitoring System This system monitors radioactivity in the condenser offgas at the inlet to the hold-up piping after it has passed through the offgas condenser and moisture separator. A continuous sample is extracted from the offgas pipe via a sample lin It is then i
| |
| t | |
| - - - , _ _ - -..-.,,,-,., , ,-n..~.-, - , , - - - - . ~ . -
| |
| | |
| .
| |
| -
| |
| , | | , |
| - | | ! |
| . | | l l l |
| | l a |
| | ' f l ! |
| | l i ! |
| | ! ! |
| | ' |
| | : |
| | l l |
| l | | l |
| | | ! |
| passed through a sample chamber and sample panel before being returned to the suction side of the steam jet air ejector (SJAE). The sample panel can be purged with room air to check detector response to background radiation. The sample panel measures and indicates sample line flow. A Geiger-Muller (GM)
| | ! |
| tube is positioned adjacent to the vertical sample chamber and monitoring is provideg locally and to the control room. The monitor range is 1-10 mR/hr on a six decade log scale. The principal gases detected are Kr-85, Kr-87, Kr-88, Xe-133m, and Xe-13 Three trip circuits provide alarm functions onl Readings are displayed on a r9diation monitor and actuate the
| | : |
| ; following control room annunciators: Offgas high-high, offgas high, and offgas downscale. High or low sample line flow measured at the sample panel actuates a control room offgas
| | l i |
| | |
| sample high-low flow annunciator. The radiation level output of
| |
| '
| |
| the monitor can be directly correlated to the concentration of the noble gases by using the semiautomatic vial sample panel to obtain a grab sample. The sample is analyzed in the plant counting room with the multichannel analyzer (MCA) and the results correlated with the monitor readin (2) Carbon Bed Vault Monitor The carbon vault is monitored for gross gamma radiation levels with a single channe16 GM tube monitor. The monitor reads out over a range of 1-10 mR/hr over a six decade logarithmic scal The principal nuclides detected are Xe-135, Xe-135m, Kr-87, and Kr-8 The channel includes a sensor and converter, an indicator and trip unit, and a locally mounted auxiliary ut.i The indicator and trip unit is located in the control room. The channel provides for both loeg1 and remote readout of gama radiation over a range of 1-10 mR/hr. The indicator and trip unit has one adjustable upscale trip for alarm and one downscale tri The trip circuits may be verified by means of test signals or through use of portable gamma source A licensee representative stated that the decector was located near the room ventilation exhaust duc (3) Offgas Post-treatment Radiation Monitor This system monitors radioactivity in the offgas piping downstream of the offgas charcoal adsorbers and upstream of the offgas system discharge valve. A continuous sample is passed through the offgas post-treatment sample panel for monitoring and sampling and returned to the effgas system pipin The sample panel has a pair of filters (one for particulate collection and one for halogen collection) in parallel (with respect to the flow) with two identical gross radiation detection assemblies (for determination of noble gases). Each gross radiation detection assembly consists of a shielded chamber, a set of GM tubes and a check sourc Two radiation
| |
| | |
| .
| |
| -
| |
| .
| |
| -
| |
| .
| |
| | |
| monitors in the control room displag the measured gross radiation level over a range of 10-10 over five decades on a logarithmic scal The principal nuclides detected are Kr-85 and Xe-13 The sample panel shielded chambers can be purged with room air to check detector response to background radiation. The sample panel measures and indictes sample line flow. A check source for each detection assemoly operated from the control room can be used to check operability of the gross radiation chambe Each radiation monitor has three trip circuits: two-upscale (high-high-high, and high) and one downscale (low). Each trip is visually displayed on the radiation monito These three trips actuate corresponding control room annunciators: offgas post-treatment high-high-high radiation offgas post-treatment high radiation, and offgas post-treatment downscale. A trip circuit on the recorder actuates an offgas post-treatment high-high radiation annunciato High or low sample flow actuates a control room annunciato A trip auxiliary unit in the control room takes the high-high-high and downscale trip setpoint and initiates closure of the offgas system discharge and drain valves if its logic is satisfied. A vial sampler panel similar to the pretreatment sampler panel is provided for grab sample collection to allow isotopic analysis and gross monitor calibratio (d) Offgas and Radwaste Building Ventilation Radioactivity Monitoring System The system monitors for gaseous radioactivity in the offgas and Radwaste Building discharge, including radwaste storage tank vents for gross radiation level, and collects halogen and particulate samples. The gross radiation detection assembly consists of a shielded chamber, a beta sensitive GM tube, and a check source. A radiation monitor in the control room analyzes and visually dgsplays the measured gross radiation level over a range of 10-10 cpm. The sample panel shielded chamber can be purged with room air to check detector response to background radiation. The sample panel measures and indicates sample line flow. /, check source operated from the control room can be used to check operability of the gross radiation channe The radiation (high-high and monitor high) andhas onethree trip (circuits; downscale low). two upscale
| |
| | |
| .
| |
| -
| |
| .
| |
| -
| |
| .
| |
| | |
| 6. Event Description On Friday, February 26, 1988, at approximately 1630 hours, preparations were begun by operations personnel for changeover from "B" SJAE to "A" SJA A 20 SCFM air purge was placed through the "A" SJAE until the changeover froa the "B" SJAE at about 1700 hours the. next evening, Saturday, February 27, 1988. At the time of the changeover on' Saturday, the following conditions existed:
| |
| - Plant was at 100% power
| |
| -
| |
| Preheater "B" outlet temperature was 305*F Preheater "A" outlet temperature was 295 F
| |
| -
| |
| Recombiner "A" outlet temperature was 395 F Recombiner "B" outlet temperature was 600*F
| |
| -
| |
| Preheater "B" steam pressure was 110 psig Preheater "A" steam pressure was 100 psig
| |
| - Offgas flow rate was 40 SCFM (including purge flow)
| |
| - Post-treatment radiation monitor was indicating 60-65 cpm
| |
| -
| |
| "A" H analyzer was in auto in "zero purge" mode
| |
| "B" analyzer was in manual and "sample" mode reading 0.2-0.5 H2 conce tratio After placing the second stage of the "A" SJAE in service, the steam supply pressure was being raised to the normal operating pressure of 130 psig, when operations personnel received a second stage low steam flow alar Steam supply pressure was reduced to 80 psig while instrument (I&C) technicians were called to vent the pressure transmitter This venting cleared the alarms and steam supply pressure was brought back up to 130 psi The final step in changcover from the "B" to the "A" SJAE was begun by
| |
| "bumping" open the suction valve (F003A) from the low pressure condenser to the first stage "A" SJAE, as per procedure. As offgas flow to "A" recombiner increased "B" recombiner temperature started to decrease as expected. However, there was no corresponding incresse in "A" recombiner temperature. (The 2H,+0 9 to 2H 9 0 recombination is an exothermic reaction).
| |
| | |
| The "A" reconbiner pressure differential was normal; therefore, operations personnel continued to "bump" open F003A in an attempt to increase offgas flow and therefore raise "A" recombiner outlet temperatur At about 1745 hours, operations personnel noticed spiking of both in-line hydrogen analyzers (analyzers indicate 0-5% 9H ) and a loss of offgas flo Water induction into the recombiner was sGspected at that tim OperaLions personnel opened the "B" drain valves and then the "A" recombiner drain valves as per procedure. Subsequently, offgas flow indication returned. The hydrogen monitors were reset within ten minutes after flow retur The " A" recombiner outlet temperature quickly increased to 600'F (normal operating tenperature) from an indicated 400* It was later discovered that the recorder could not indicate below 400'F because of recorder mechanical problem . _ _ _ .
| |
| ,
| |
| *
| |
| -
| |
| .
| |
| -
| |
| .
| |
| | |
| The first charcoal adsorber beds in each of the two parallel trains were determined. to be hot imediately after the bur Charcoal adsorber bed D012B was at 140 F and and D012A was at 110'F. (Offgas flows in parallel through two trains of four charcoal beds and one gas cooler each).
| |
| | |
| Inline dewpoint indicators also pegged out high. It was later determined that high system temperature during the burn had destroyed the electrodes associated with the instrument Because of the hydrogen burn, plant power was reduced to 75%. Health physics personnel were requested to survey offgas system areas. No significant increases in airborne radiation levels were detected, indicating that no offgas system loop seals had been blown. This was also an indication that no major pressure transients occurred during the burn because any system pressure exce.eding approximately six (6) psig dould have blown loop seals. Normal system operating pressure was one (1) psi By 1845 hours, the charcoal treatment system was bypassed. Plant power had been reduced to 55% to help ensure that offgas process flow radiation levels stayed below radiation monitor trip-points.
| |
| | |
| ; | | ; |
| By 1945 hours, nitrogen purging of the charcoal adsorber beds had begu Temperatures peaked at 443'F in bed D012A and 700'F in bed 0012B at about 2300 hours. By March 1, 1988, the bed temperatures had decreased to the 20-30*F range with the nitrogen purge continuing.
| |
|
| |
| 1 On March 2,1988, at about 0900, three beds of the "A" charcoal train were placed back in service. Nitrogen purging of D012A and all of "B" train
| |
| '
| |
| beds continue ;
| |
| Radiological Significance of Event The inspector evaluated the radiological aspects of the event through discussion with licensee representatives, review of records, and examination of radiation sampling, monitoring, and analysis equipment used in conjunction with the offgas system. The inspector also reviewed calculations of monitor setpoints and dose assessment for releases during the event.
| |
|
| |
| ) While the offgas flow was bypassed the Radwaste Building Ventilation Exhaust Radiation Monitor reading peaked at 2.0 E+3 counts per minute (cpm) at 0645 CST on February 29, compared to a pre-event reading of 1.0 E-2 cpm.
| |
|
| |
| 1 The maximum effluent rate (61.9 microcuries per second) occurred at i 0327 CST on February 29. The effluent monitor gross reading peaked at a
| |
| '
| |
| later time due to increasing background radiation. The instantaneous dose rate at the plant boundary corresponding to the maximum source term was 2.10 mrem per year, well within allowable limits.
| |
|
| |
|
| | f , |
| | ! > |
| l | | l |
|
| |
|
| i
| | ' . |
| . _ . _ . . , , _ . , . . _ . _ , , , - - , _ , , . _ _ , _ , , - , . . . . . _ _ - . . ,,.. ~,-_.. _ _ _ _ _ _ | | , . |
| | . . , |
| | .. |
| * | | * |
| . | | . |
| .
| | ENCLOSURE 2 CRITERI A FOR CCMPARING ANALYTIC AL MEASUREVENTS This enclosure provides criteria for co? paring results of capability tests and verification reasurements. The criteria are basec on an empirical relat'.onsnip which ccmbines prior ex;erience and the accu'aey reeds of t*'s pecg'4*- |
| | | In these criteria, the jucgeent limits dercUng agreements of dist;*ee-ent between licensee and NRC results are variable. Inis variability is a function of the NRC's value relative to its associatec uncertainty, referred to in te,is program ss "Resolution"3 increases, the rarge of acceptable differenses tet.een Cor e'sely, pocrer the NRC and licensee values shculd te more restrictiv agree ent between NRC and licensee values must Oe considered acceptable as the resolution decrease For comparison purposes, a ratio 8 of the licersee value to the NRC value for each individual nuclide 15 cc?puted. This ratio is then evaluated for agree-eent based on the calculated resolution. Tre correspoecing resolutionValues and calculated ratics which denote agree ent are listed in Table 1 celc , |
| The inspector reviewed Technical Specification and procedural requirements for the:
| | outside of the agreement ratios for a selected nuclide are ccesicered in disagreetec , |
| Offgas Pretreatment Monitor; Carbon Bed Vault Radiation Monitor; Offgas Post Treatment Monitor;
| | 8 Resolution = NRC Reference Value fcr a Particular Nuclide Associated Lncertainty for the Vafue |
| *
| | - |
| Offgas and Radwaste Building Ventilation Exhaust Radiation Monitor; -{
| | -- ^' |
| Hydrogen Analyz es; and
| | 8 Comparison Ratio s Licensee value : |
| * Charcoal and HEPA filter testing (Offgas Af ter Filters and Radwaste Building Ventilation Exhaust filters).
| | NA7~AeTerence Value TABLE 1 Confirmatory Measurements Acceptance Criteria |
| | | , |
| Operating and surveillance requirements for the offgas pretreatment monitor, the offgas post-treatment monitor, the offgas and radwaste monitor, and the hydrogen analyzers were found in Technical Specification (
| | Resolutions vs. Coeparison Ratio |
| Tables 3.3.7.12-1, ano 4.3.7.12-1. Technical Specification Table 4.4.5-1 provided additional surveillance requirements for the offgas pretreatment monitor. Technical Specification Tables 3.3.7.1-1 and 4.3.7.1-1 provided operating and surveillance requirements for the carbon bed vault radiation monitor, and Technical Specification Tables 3.3.7.5-1 and 4.3.7.5-1 orovided additional operating and surveillance requirements for the Offgas and Radwaste Building ventilation exhaust radiation monitor. Technical Specification Sections 3.11.2 and 4.11.2 also provided operating and surveillance requirements for the monitors and 'ie hydrogen analyzer The inspector selectively reviewed procedures implementing the Technical Specification requirements and reviewed licensee documentation showing that surveillances (calibrations, functional tests, filter testing, and dose calculations) had been performed within the required frequencie The radiation monitors appeared to have been functioning properly at the time of the event. The hydrogen analyzer recorders went offscale (greater than 5 percent) at the time of the event, so grab samples were taken and analyze Procedure 06-CH-IN62-0051, "Offgas Hydrogen Concentration,"
| |
| ' Revision 23, was used for this operation. The first sample was taken at 7:47 pm on February 27. Since licensee personnel were concerned about the operability of the gas chromatograph, a "pop" test was conducted on the
| |
| ' tampl The test indicated that the concentration of hydrogen in the Ople was less than 4 percent by volume. Two more samples were taken over the next five hours and were analyzed on the gas chromatograph, which had tven determined to be operational and and had been functionally checkJd. The results indicated concentrations by volume of 0.03 percent hydrogen and 0.04 percent hydroge The hydrogen analyzers were reading b ck on scale by this tim ~
| |
| CauseW Conclusions / Corrective Actions
| |
| ,
| |
| After the event, tre licensee assembled a task force consisting of the e , Manager-Plant Opera.tions, key onshift personnel involved with the event, 0, .'
| |
| >
| |
| i various pynt derFtment representatives and a vendor (GE) expert in the
| |
| '
| |
| - design ani, operation of the offgas system to determine the root causes,
| |
| '
| |
| i' condusio' )! /and cor.'ective action '
| |
| ,
| |
| '
| |
| b
| |
| ' \
| |
| I l) l\ ,
| |
| j' ' f, ,
| |
| , -
| |
| | |
| n , .-
| |
| -
| |
| <
| |
| *
| |
| .
| |
| | |
| a. Equipment Damage As a result of the ignition, the licensee noted the following equipment damage:
| |
| (1) The inservice prefilter had been damaged with partial melting of the aluminum separator material. The filter was subsequently removed and the other filter was placed in servic (2) The inline dewpoint indicator electrodes had been destroye (These electrodes were considered to be possible ignition sources.)
| |
| | |
| (3) About 25 pounds total of charcoal (calculated value) was burned in the charcoal beds. Each bed contains approximately 3 tons of charcoal. The licensee considered this an insignificant loss and did not plan to replace or add charcoal.
| |
| | |
| b. Causes and Corrective Actions (1) Intercondenser Fouling
| |
| '
| |
| During the week prior to the ignition, plant performance monitoring personnel had noted a degradation of plant efficiency. Low pressure (LP) condencer pressure had equalized with intermediate pressure (IP) condenser pressure resulting in a 5-6 megawatt loss in plant electrical outpu This degradation was the result of fouling problems within the i intercondenser of the inservice "B" SJAE. Flow through both intercondensers is cooled by Plant Service Water (PSW).
| |
| | |
| Biological fouling within the Intercondenser (tube-side) lowered its ability to condense first stage SJAE effluent and therefore maintain sufficient pressure differential across the air ejector. This degradation was the main reason for initiating i
| |
| the swap to the "A" SJA Biocides and dispersants added to the PSW in the past had been ineffective in preventing intercondenser fouling. Periodic mechanical or hydraulic cleaning had been required to keep these
| |
| .
| |
| ' | |
| ; heat exchangers clean. The licensee had very recently changed j
| |
| to a different biocide / dispersant treatment regime in order to reduce fouling. Biological fouling (macro and micro) had been | |
| ; an ongoiag problem in general at Grand Gulf Nuclear Statio (2) Recombinor Wetting
| |
| , | |
| Wetting and subsequent cooling of the "A" recombiner catalyst j resulted in the buildup of H 7 in the offgas system prior to i ignitio This wetting occurred as a result of the proccdural sequence for opening a arain valve in a low area between the l
| |
| | |
| .
| |
| <'
| |
| '
| |
| .
| |
| | |
| preheater and recombiner. Condensation collects in this area due to piping configuration and needs to be draine Wetting of the recombiner catalytt v.as not detected during the event because the recombiner temperature recorder (located in the main control room) had pegged low at about 400'F due to a mechanical failure of the recorder. Temperature history of the recombiner below 400'F cannot, therefore, be reproduce The licensee had subsequently revised System Operating Instructions 01-1-01-N62-1, Offgas System, to: (a) revise the sequence for opening the offgas header to the recombiner drain valves to ensure that any condensation and moisture had been drained prior to initiating offgas flow and (b) establish procedural holdpoints for verification of proper recombiner temperature profil (3) Ignition Source At the time of the inspection the licensee had not positively identified the f gnition sourc Because of the stoichiometric concentrations hydrogen, oxygen and humidity in the process flow at the time of ignition only a small amount of energy would have been required to ignite the mixtur The licensee suspected that the ignition occurred in the area of the desiccant dryers. The licensee and the inspector agreed that by insuring proper recombiner operation, ignition sources become a secondary consideratio (4) Preheater Steam Supply Pressure Several design problems existed in the main steam supply to the preheaters. Sufficient steam pressure could not be supplied to both A and B preheaters to allow simultaneous operation of both of the condenser air removal /offgas trains or to make a rapid changeover between trains. Insufficient steam supply to the preheaters reduced their ability to preheat process flow to the proper recombiner inlet temperature. A rapid switch from one train to another could slug the recombiner with wate To alleviate this problem, a Design Change Request (No. 87/113, dated 9/25/87) had been previously authorized to redesign the piping runs between the main steam equalizing header and the preheaters to allow sufficient steam supply pressure with both preheaters inservic The licensee had also experienced cycling problems with solenoid valves in the steam supply lines to the preheaters. During plant startup in January 1988, with the plant at 3% power, a valve in the steam supply line to the inservice preheater inadvertently closed, shuttir, off steam supply to the
| |
| | |
| :y
| |
| .:
| |
| ..# L
| |
| -
| |
| ..
| |
| *
| |
| e
| |
| .
| |
| 13-
| |
| | |
| , preheate Subsequent wetting of the recombiner resulted in H2 concentration of 14% in the offgas syste There was ne ignition at that tim Design Change Request No. 87/113 also included provisions for replacing each solenoid valve with two manual valves. The
| |
| . licensee indicated that modifications described in the DCR would be completed during the next refueling outage. The inspectors urged the licensee to ensure that these modifications be completed as schedule . Radiological Considerations The licensee performed an analysis of the radiological output from the plant which could result from operating with only three charcoal beds operating in the offgas treatment system instead of the normal eight. The analysis showed that the plant could be expected to. operate within | |
| , | | , |
| !
| | j |
| Technical Specification limits for effluent . Sumary and Conclusions
| | [ |
| ,
| | l i |
| The hydrogen burn took place in a system which was designed to contain such burns and detonations. .The burn was fully contained.
| |
|
| |
|
| ,
| | Cceparison Ratio for i Resolution Agreement |
| j The licensee was still in the process of evaluating the event at the time
| | <4 0.4 - 2. 5 4-7 0.5 - 2. 0 8 - 15 0.6 - 1. 66 16 - 50 0.75 - 1, 33 51 - 200 0.80 - 1. 25 |
| ! of the inspection. The integrity of the offgas system boundary did not appear to have been violated. The licensee had identified contributing
| | >200 0.S5 - 1. 18 |
| ,
| |
| i causes of the incident, though the ignition source had not been
| |
| ,
| |
| identified, f
| |
| The licensee had evaluated the event and had identified corrective
| |
| ' actions, some definite and some tentative, depending on what further
| |
| : analysis might reveal. No radiological effluent restrictions were 5 exceeded during the even No violations or deviations were identified.
| |
|
| |
|
| e
| | 1 |
| !
| | : |
| l i
| |
| !
| |
| !
| |
| <
| |
| }} | | }} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F8911999-10-13013 October 1999 Forwards Copy of FEMA Region IV Final Rept for 990623-24, Grand Gulf Nuclear Station Exercise.Rept Indicates No Deficiencies or Areas Requiring Corrective Action Identified During Exercise ML20216J8891999-10-0404 October 1999 Forwards Details of Existing Procedural Guidance & Planned Administrative Controls.Util Respectfully Requests NRC Review & Approval of Changes by 991020.Date Will Permit to Implement Changes & Realize Full Benefit During Refueling ML20217B0361999-10-0404 October 1999 Refers to Investigation Conducted by NRC OI Re Activities at Grand Gulf Nuclear Station.Investigation Conducted to deter- Mine Whether Security Supervisor Deliberately Falsified Unescorted Access Authorizations.Allegation Unsubstantiated ML20212J8151999-09-29029 September 1999 Forwards Insp Rept 50-416/99-12 on 990725-0904.One Violation Noted & Being Treated as Noncited Violation.Licensee Conduct of Activities at Grand Gulf Facility Characterized by Safety Conscious Operations,Sound Engineering & Maint Practices ML20216J6811999-09-28028 September 1999 Ack Receipt of ,Transmitting Rev 31 to Physical Security Plan for GGNS Under Provisions of 10CFR50.54(p). NRC Approval Not Required,Based on Determination That Changes Do Not Decrease Effectiveness & Limited Review ML20212J7361999-09-28028 September 1999 Forwards Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted.Purpose of Insp to Review Solid Radioactive Waste Management & Radioactive Matl Transportation Programs ML20212J5321999-09-27027 September 1999 Forwards Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted.Inspectors Determined That Radioactive Waste Effluent Releases Properly Controlled,Monitored & Quantified ML20216J7101999-09-26026 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator License Examinations ML20216J8141999-09-26026 September 1999 Forwards Proprietary Renewal Applications for Licensed Operators for Wk Gordon & SA Elliott at Grand Gulf Nuclear Station.Proprietary Info Withheld ML20212F5521999-09-23023 September 1999 Forwards SER Accepting Util Analytical Approach for Ampacity Derating Determinations at Grand Gulf Nuclear Station,Unit 1 & That No Outstanding Ampacity Derating Issues as Identified in GL 92-08 Noted ML20212D9211999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of GGNS on 990818 & Identified No Areas in Which Licensee Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through March 2000 Encl ML20212A9331999-09-13013 September 1999 Forwards Partially Withheld Insp Rept 50-416/99-15 on 990816-20 (Ref 10CFR73.21).One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20211P7631999-09-10010 September 1999 Discusses Staff Issuance of SECY-99-204, Kaowool & FP-60 Fire Barriers at Plant.Proposed Meeting to Discuss Subj Issues Will Take Place in Oct or Nov 1999 ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211Q3471999-09-0909 September 1999 Forwards Federal Emergency Mgt Agency Final Rept for 990623 Plant Emergency Preparedness Exercise.No Deficiencies Noted & One Area Requiring Corrective Action Identified ML20211Q3091999-09-0909 September 1999 Forwards Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 ML20211Q4861999-09-0808 September 1999 Informs That Util Has Discovered Dose Calculation Utilized non-conservative Geometry Factor for Parameter.Calculation Error Being Evaluated in Accordance with Corrective Action Program ML20211Q0091999-09-0808 September 1999 Forwards Request for Addl Info Re Individual Plant Exam of External Events for Grand Gulf Nuclear Station,Unit 1. Response Requested by 000615 ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211P4171999-09-0707 September 1999 Ack Receipt of ,Which Transmitted Addendum to Rev 30 to Physical Security Plan for Ggns,Per 10CFR50.54(p).NRC Approval Is Not Required,Since Util Determined That Changes Do Not Decrease Effectiveness of Plan ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211K6061999-08-31031 August 1999 Informs That Plant Has No Candidates to Take 991006 Generic Fundamentals Exam ML20211K5641999-08-31031 August 1999 Forwards Rev 39 to Grand Gulf Nuclear Station Emergency Plan Non-Safety Related, IAW 10CFR50,App E,Section V. Changes Do Not Decrease Effectiveness of Plan & Continues to Meets Stds of 10CFR50.47(b) & Requirements of App E ML20211J2321999-08-26026 August 1999 Advises That Info Contained in to Support NRC Review of GE Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Will Be Withheld from Public Disclosure ML20211J3761999-08-25025 August 1999 Corrected Ltr Informing That Info Provided (on Computer Disk & in Ltr to Ineel ) Marked as Proprietary Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended.Corrected 990827 ML20211F4881999-08-25025 August 1999 Advises That Info Submitted by 990716 Application & Affidavit Containing Diskette & to Ineel Mareked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20211F7751999-08-24024 August 1999 Forwards Insp Rept 50-416/99-10 on 990809-13.No Violations Noted.Insp Covered Licensed Operator Requalification Program & Observations of Requalification Activities ML20211C4381999-08-20020 August 1999 Forwards Rev 31 to Physical Security Plan for Protection of Grand Gulf Nuclear Station,Iaw 10CFR50.54(p).Util Has Determined That Rev Does Not Decrease Effectiveness of Plan. Encl Withheld,Per 10CFR73.21 ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211B3761999-08-16016 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001, ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211A9481999-08-12012 August 1999 Informs of Completion of Analysis of Heat Transfer in Cooler During Fan Coast Down & Concludes That Potential Exists for Steam Foundation,Under Conditions Where Dcw Sys Flow Is Lost Prior to Full Isolation Valve Closure ML20210P8411999-08-0909 August 1999 Forwards Insp Rept 50-416/99-09 on 990613-0724.No Violations Noted.Activities at Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20210N6401999-08-0303 August 1999 Informs That Eighteeen Identified Penetrations Will Be Restored to Conformance with Licensing Requirements Prior to Restart from RFO10,scheduled for Fall 1999,per GL 96-06. Example of Piping Analysis Being Performed,Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1951999-07-30030 July 1999 Forwards Insp Rept 50-416/99-03 on 990405-08 & 0510-11.No Violations Identified ML20211K7491999-07-30030 July 1999 Forwards Ltr Rept Documenting Work Completed Under JCN-W6095,analyses Performed at Ineel to Calculate Minimum Time to Fuel Pin Failure in Boiling Water Reactors (BWR) ML20210K6661999-07-29029 July 1999 Forwards Fitness for Duty Program Performance six-month Rept for Period Covering Jan-June 1999,per 10CFR26.71 ML20210F3591999-07-26026 July 1999 Forwards Proprietary Version & Redacted Version of Wyle Test Rept M-J5.08-Q1-45161-0-8.0-1-0,re Pressure Locking & Thermal Binding Test Program.Proprietary Version Withheld ML20210E3251999-07-23023 July 1999 Forwards Insp Rept 50-416/99-07 on 990622-25.No Violations Noted.Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise Was Conducted ML20210D2401999-07-21021 July 1999 Informs of Resignation of Operator WE Griffith,License OP-20806-1,from Entergy Operations,Inc ML20209J0311999-07-16016 July 1999 Forwards Proprietary Info Supporting Review of Generic Alternate Source Term Request.Proprietary Info Withheld Per 10CFR2.790 ML20209G4791999-07-15015 July 1999 Forwards Proposed Emergency Plan Change as Addendum to Changes Previously Submitted Via GNRO-98/00028 & GNRO-99/00007,for NRC Review & Approval ML20210B1031999-07-15015 July 1999 Forwards Insp Rept 50-416/99-08 on 990502-0612.Determined That Three Severity Level IV Violations Occurred & Being Treated as Noncited Violations ML20210H3211999-07-14014 July 1999 Forwards Proprietary Info Supporting Review of 970506 Submittal of BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic Bwr. Proprietary Info Withheld Per 10CFR2.790 ML20209D7511999-07-0909 July 1999 Responds to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. as Result of NRC Review of Util Responses,Info Revised in Rvid & Rvid Version 2 Will Be Released ML20209D7671999-07-0101 July 1999 Submits Response to Violations Noted in Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Corrective Actions: Contractor Performance Has Been re-evaluated in Regards to UFSAR Reviews ML20196K4901999-07-0101 July 1999 Discusses Relief Requests PRR-E12-01,PRR-E21-01,PRR-E22-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01 Submitted by EOI on 971126 & 990218.SE Accepting Alternatives Proposed by Util Encl ML20196J5711999-06-30030 June 1999 Advises That Versions of Submitted Info in 990506 Application & Affidavit, Re Proposed Amend to Revise Ts,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA 1999-09-09
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062G4511990-11-21021 November 1990 Forwards List of Unimplemented GSIs at Facility,Per Generic Ltr 90-04.Timely Completion Requested IR 05000416/19900221990-11-15015 November 1990 Forwards Insp Rept 50-416/90-22 on 901022-26.No Violations or Deviations Noted.W/O Encl ML20058E8921990-10-30030 October 1990 Forwards Insp Rept 50-416/90-20 on 900915-1019.No Violations or Deviations Noted ML20058B4321990-10-25025 October 1990 Grants 900709 Request for Relief from Requirements for Leakage Testing of RCS in ASME Code,Section Xi.Se Encl ML20062B1681990-10-19019 October 1990 Approves Scheduled Implementation of Dcrdr Mods by 920731 (Fifth Refueling Outage) ML20062B1701990-10-19019 October 1990 Confirms That Util Actions in Comply W/Generic Ltr 89-04 Guidance Re Inservice Testing Programs ML20058B0771990-10-17017 October 1990 Ack Receipt of 901002 Responses Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-416/90-15 ML20062B3281990-10-15015 October 1990 Advises That 900924 Response to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2, Part 2 'Vendor Interface for Safety-Related Components,' Acceptable ML20058A5711990-10-12012 October 1990 Forwards Insp Rept 50-416/90-18 on 900917-21.No Violations or Deviations Noted ML20062B6991990-10-12012 October 1990 Requests Completion of Analyses of Liquid Samples Spiked W/ Radionuclides within 60 Days of Receipt of Ltr ML20058A2471990-10-11011 October 1990 Forwards Insp Rept 50-416/90-16 on 900827-31.No Violations or Deviations Noted ML20059N4931990-10-0101 October 1990 Informs That Util Responses to Generic Ltr 88-01 Acceptable, W/Exception to Responses Re Tech Spec Changes.Safety Evaluation & Technical Evaluation Rept Encl ML20059L3891990-09-0606 September 1990 Forwards Insp Rept 50-416/90-15 on 900721-0817 & Notice of Violation.Nrc Believes Negative Trend in Area of Attention to Detail Needs to Be Addressed ML20056B3431990-08-20020 August 1990 Forwards Insp Rept 50-416/90-13 on 900709-13.Violations Noted But Not Cited ML20058P8081990-08-15015 August 1990 Discusses Util 891221 Response to Generic Ltr 89-10, Safety-Related Motor-Operated Valve (MOV) Testing & Surveillance. Recommends That Testing of MOVs in-situ Be Performed Under Design Basis Conditions ML20059A0751990-08-0606 August 1990 Advises That Rev 9 to Operational QA Manual,GGNS-TOP-1A, Acceptable,Per ML20058L5941990-07-31031 July 1990 Advises That 900717 Rev 17 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20058M4181990-07-25025 July 1990 Forwards Insp Rept 50-416/90-12 on 900616-0720.No Violations or Deviations Noted ML20055G5221990-07-18018 July 1990 Forwards Safety Evaluation Concluding That Procedures Generation Package Must Be Revised by Addressing Both Programmatic Improvements & Results of EOP Insp ML20055G5301990-07-17017 July 1990 Forwards Fr Notice of Withdrawal of Applications for Amend to License NPF-29 to Delete Certain Test,Vent & Drain Valves from Tech Spec Table 3.6.4-1 ML20055G0321990-07-16016 July 1990 Forwards Safety Evaluation Re Criticality Analysis of Fuel in Spent Fuel Racks Including Effect of Boraflex Gaps Which Could Occur Up Through Cycle 4.Storage Racks Can Safely Accomodate Max Reactivity of Unit 1 Cycle 1 Through Cycle 4 ML20055F9051990-07-16016 July 1990 Forwards Safety Evaluation Supporting Criticality Analysis for Cycle 5 Fuel in Spent Fuel Storage Racks IR 05000416/19900081990-07-12012 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-416/90-08 ML20055E5691990-07-0505 July 1990 Grants 900426 Application for Withholding of ANF-90-060(P), Criticality Safety Analysis for Grand Gulf Spent Fuel Storage Racks W/ANF-1.4 Fuel Assemblies, Per 10CFR2.790(b)(5)) ML20055H4391990-07-0505 July 1990 Ack Receipt of Providing Scenario for Emergency Preparedness Exercise Scheduled for Wk of 900827 ML20055E8871990-07-0202 July 1990 Forwards Notice of Withdrawal of Util 900504 Application for Amend to License NPF-29,extending Implementation Date for Amend 65 to License,Per 900606 Request ML20055F2061990-06-29029 June 1990 Advises That 900618 Rev 3 to Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20058K5161990-06-28028 June 1990 Advises That Units 1 & 2 Transferred to Project Directorate IV-1,effective 900604 ML20055E2441990-06-21021 June 1990 Grants 880630 Request to Withhold GE MDE-80-0485, Tech Spec Improvement Analysis for Reactor Protection Sys for Grand Gulf Nuclear Station,Units 1 & 2, Per 10CFR2.790 ML20059M8491990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20248C9051989-09-26026 September 1989 Forwards Insp Rept 50-416/89-20 on 890828-0901.No Violations Noted ML20247N2171989-09-18018 September 1989 Requests Radius & Thickness (Rt),(Rt)Ndt Values for Reactor Vessel Flange Matl & Upper Shelf Energy Values for Matls,Per Generic Ltr 88-11,by 891015 ML20247G6681989-09-12012 September 1989 Forwards Insp Rept 50-416/89-19 on 890715-0825 & Notice of Violation ML20247G6571989-09-0808 September 1989 Advises That Rev 19 to Emergency Plan Consistent W/Planning Stds of 10CFR50.47(b) & Requirements of App E to 10CFR50 ML20247D8591989-09-0101 September 1989 Ack Receipt of 890821 & 25 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-416/89-17. Implementation of Corrective Actions Will Be Examined During Future Insps ML20247A9331989-08-31031 August 1989 Advises That Requalification Program Evaluation Scheduled for Wks of 891113 & 27.Facility Should Furnish Approved Items Listed in Encl 1 Ref Matl Requirements by 890915 ML20246G3541989-08-25025 August 1989 Forwards Requests for Addl Info Re Gaps in Boraflex of High Density Spent Fuel Racks.Response Requested by 891015 ML20246N0771989-08-23023 August 1989 Requests That Util Provide Ref Matls for Reactor Operator & Senior Reactor Operators Licensing Exams Scheduled for Wk of 891218.Info Must Reach NRC by 891012.Related Exam Requirements Info Encl ML20246D7961989-08-21021 August 1989 Forwards Safety Evaluation Granting Util 880524 Requests for Relief from Certain Requirements in ASME Code,Section XI Re Inservice Insp Program IR 05000416/19890101989-08-21021 August 1989 Ack Receipt of Informing NRC of Action Taken to Correct Violations Noted in Insp Rept 50-416/89-10 IR 05000416/19890141989-08-15015 August 1989 Ack Receipt of 890712 & 13 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-416/89-14. Implementation of Corrective Actions Will Be Examined During Future Insps IR 05000416/19890161989-08-15015 August 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-416/89-16. Implementation of Corrective Actions Will Be Examined During Future Insps ML20245K2511989-08-11011 August 1989 Advises That 890609 Rev 8 to Operational QA Program Consistent w/10CFR50.54(a) & Acceptable ML20245J7961989-08-0202 August 1989 Forwards Insp Rept 50-416/89-18 on 890710-14.No Violations or Deviations Noted ML20247P6571989-07-31031 July 1989 Provides Evaluation of Util Proposed Revised PASS Test Procedure,Per .Util Commitments to Document Changes to PASS Sampling Program Acceptable ML20248C9371989-07-28028 July 1989 Forwards Insp Rept 50-416/89-17 on 890616-0714 & Notice of Violation IR 05000416/19890081989-07-25025 July 1989 Ack Receipt of 890621 & 28 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-416/89-08 ML20247G6771989-07-21021 July 1989 Forwards SER Accepting Licensee Commitment to Install ex-core Neutron Flux Monitoring Instrumentation Meeting Requirements of Reg Guide 1.97,Rev 2,prior to Restart Following Fourth Refueling Outage ML20247G7311989-07-20020 July 1989 Denies 890706 Request for Extension Re Payment of Invoices. Suggests That Util Pay Outstanding Balances & Any Amount Determined to Be Overpayment Will Be Refunded by NRC ML20247L1081989-07-18018 July 1989 Forwards Info Documenting Info Received Between Region II & Concerned Individual.No Attempt Made to Ascertain Accuracy of Info Supplied by Individual.Requests Findings within 45 Days.Encl Withheld (Ref 10CFR2.790(a)(6) & (7)) 1990-09-06
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217F8911999-10-13013 October 1999 Forwards Copy of FEMA Region IV Final Rept for 990623-24, Grand Gulf Nuclear Station Exercise.Rept Indicates No Deficiencies or Areas Requiring Corrective Action Identified During Exercise ML20217B0361999-10-0404 October 1999 Refers to Investigation Conducted by NRC OI Re Activities at Grand Gulf Nuclear Station.Investigation Conducted to deter- Mine Whether Security Supervisor Deliberately Falsified Unescorted Access Authorizations.Allegation Unsubstantiated ML20212J8151999-09-29029 September 1999 Forwards Insp Rept 50-416/99-12 on 990725-0904.One Violation Noted & Being Treated as Noncited Violation.Licensee Conduct of Activities at Grand Gulf Facility Characterized by Safety Conscious Operations,Sound Engineering & Maint Practices ML20216J6811999-09-28028 September 1999 Ack Receipt of ,Transmitting Rev 31 to Physical Security Plan for GGNS Under Provisions of 10CFR50.54(p). NRC Approval Not Required,Based on Determination That Changes Do Not Decrease Effectiveness & Limited Review ML20212J7361999-09-28028 September 1999 Forwards Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted.Purpose of Insp to Review Solid Radioactive Waste Management & Radioactive Matl Transportation Programs ML20212J5321999-09-27027 September 1999 Forwards Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted.Inspectors Determined That Radioactive Waste Effluent Releases Properly Controlled,Monitored & Quantified ML20212F5521999-09-23023 September 1999 Forwards SER Accepting Util Analytical Approach for Ampacity Derating Determinations at Grand Gulf Nuclear Station,Unit 1 & That No Outstanding Ampacity Derating Issues as Identified in GL 92-08 Noted ML20212D9211999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of GGNS on 990818 & Identified No Areas in Which Licensee Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through March 2000 Encl ML20212A9331999-09-13013 September 1999 Forwards Partially Withheld Insp Rept 50-416/99-15 on 990816-20 (Ref 10CFR73.21).One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20211P7631999-09-10010 September 1999 Discusses Staff Issuance of SECY-99-204, Kaowool & FP-60 Fire Barriers at Plant.Proposed Meeting to Discuss Subj Issues Will Take Place in Oct or Nov 1999 ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211Q3471999-09-0909 September 1999 Forwards Federal Emergency Mgt Agency Final Rept for 990623 Plant Emergency Preparedness Exercise.No Deficiencies Noted & One Area Requiring Corrective Action Identified ML20211Q3091999-09-0909 September 1999 Forwards Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211Q0091999-09-0808 September 1999 Forwards Request for Addl Info Re Individual Plant Exam of External Events for Grand Gulf Nuclear Station,Unit 1. Response Requested by 000615 ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211P4171999-09-0707 September 1999 Ack Receipt of ,Which Transmitted Addendum to Rev 30 to Physical Security Plan for Ggns,Per 10CFR50.54(p).NRC Approval Is Not Required,Since Util Determined That Changes Do Not Decrease Effectiveness of Plan ML20211J2321999-08-26026 August 1999 Advises That Info Contained in to Support NRC Review of GE Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Will Be Withheld from Public Disclosure ML20211J3761999-08-25025 August 1999 Corrected Ltr Informing That Info Provided (on Computer Disk & in Ltr to Ineel ) Marked as Proprietary Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended.Corrected 990827 ML20211F4881999-08-25025 August 1999 Advises That Info Submitted by 990716 Application & Affidavit Containing Diskette & to Ineel Mareked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20211F7751999-08-24024 August 1999 Forwards Insp Rept 50-416/99-10 on 990809-13.No Violations Noted.Insp Covered Licensed Operator Requalification Program & Observations of Requalification Activities ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P8411999-08-0909 August 1999 Forwards Insp Rept 50-416/99-09 on 990613-0724.No Violations Noted.Activities at Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1951999-07-30030 July 1999 Forwards Insp Rept 50-416/99-03 on 990405-08 & 0510-11.No Violations Identified ML20210E3251999-07-23023 July 1999 Forwards Insp Rept 50-416/99-07 on 990622-25.No Violations Noted.Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise Was Conducted ML20210B1031999-07-15015 July 1999 Forwards Insp Rept 50-416/99-08 on 990502-0612.Determined That Three Severity Level IV Violations Occurred & Being Treated as Noncited Violations ML20209D7511999-07-0909 July 1999 Responds to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. as Result of NRC Review of Util Responses,Info Revised in Rvid & Rvid Version 2 Will Be Released ML20196K4901999-07-0101 July 1999 Discusses Relief Requests PRR-E12-01,PRR-E21-01,PRR-E22-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01 Submitted by EOI on 971126 & 990218.SE Accepting Alternatives Proposed by Util Encl ML20196J5811999-06-30030 June 1999 Advises That Version of Info Submitted in 990504 Application & Affidavit Re Engineering Rept ME-98-001-00,marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 as Amended ML20196J5711999-06-30030 June 1999 Advises That Versions of Submitted Info in 990506 Application & Affidavit, Re Proposed Amend to Revise Ts,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA ML20195G3811999-06-0909 June 1999 Ack Receipt of ,Which Transmitted Emergency Plan Procedure 10-S-01-1,Rev 103,under Provisions of 10CFR50, App E,Section V ML20195G2971999-06-0909 June 1999 Ack Receipt of Re Emergency Plan Procedure 10-S-01-1,rev 104.No Violations Identified & Changes Subject to Insp to Confirm Effectiveness ML20195G3511999-06-0909 June 1999 Ack Receipt of 980831 & 1022 Ltrs,Which Transmitted Changes to Grand Gulf Emergency Plan,Rev 36 & 37,under Provisions of 10CFR50,App E,Section V ML20207D3351999-05-27027 May 1999 Forwards Insp Rept 50-416/99-05 on 990321-0501.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207A6961999-05-21021 May 1999 Forwards Insp Rept 50-416/99-06 on 990419-23.No Violations Noted.Determined That Fire Protection Program Was Implemented IAW Requirements of License & GL 86-10.One Unresolved Item Noted Re fire-induced Failures on Equipment ML20206U3851999-05-18018 May 1999 Forwards Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207A7561999-05-17017 May 1999 Ack Receipt of Which Transmitted Exercise Scenario for Emergency Plan Exercise Scheduled for 990623. Some Parts of Exercise Scenario Package Not Submitted & Being Developed ML20206N3921999-05-11011 May 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Organization Chart Encl ML20206K1261999-05-0707 May 1999 Informs That on 990407 NRC Administered Gfes of Written Operator Licensing Exam.Facility Did Not Participate in Exam.Copy of Master Exam with Answer Key Encl.Without Encl ML20206E0571999-04-29029 April 1999 Discusses EOI 960418 Request for License Amend for GGNS That Would Permit Addl Method of Fuel Movement & Loading in Core When Control Rods Removed.Determined That Insufficient Info Provided to Permit Completion of Review ML20206B0951999-04-23023 April 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-416/99-01 & NOV .Reply Found to Be Responsive to Concerns Raised in Nov.Implementation of C/As Will Be Reviewed in Future Insps ML20206B3601999-04-23023 April 1999 Forwards Insp Rept 50-416/99-04 on 990131-0320.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206E7661999-04-19019 April 1999 Submits Summary of 990415 Meeting Conducted in Port Gibson, Mi Re Results of Plant Performance Review Completed on 990211 & Transmitted on 990319.List of Attendees Encl ML20205N7251999-04-13013 April 1999 Forwards Summary of 990408 Meeting with EOI in Jackson, Mississippi Re EOI Annual Performance Assessment of Facilities & Other Issues of Mutual Interest.List of Meeting Attendees & Licensee Presentation Slides Encl ML20205M9421999-04-13013 April 1999 Forwards Emergency Response Data System Implementation Documents.Data Point Library Updates for Kewaunee (271), San Onofre (272) & Clinton (273) Encl.Also Encl Plant Attribute Library Update for Grand Gulf (274).Without Encls IR 05000416/19980131999-04-0606 April 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-416/98-13 .Discussions on 990330 Resulted in Addl C/A Commitments to Address Violation Re Onsite Investigation ML20205J1051999-03-29029 March 1999 Forwards Objectives for Plant,Unit 1 1999 FEMA Emergency Plan Exercise Scheduled for 990623 ML20205E8701999-03-19019 March 1999 Advises of Completion of Plant Performance Review on 990211 to Develop Integrated Understanding of Safety Performance. Overall Performance Acceptable.Isolated Examples of Failure to Follow Procedures Noted ML20207L3621999-03-0303 March 1999 Advises That Effective 990217,NRC Project Mgt Responsibilities for Grand Gulf Nuclear Station Transferred to Sp Sekerak 1999-09-09
[Table view] |
Text
_ _ _ _ _ _ _ _ _ - _ _ _
.
'
OCT 0 71988 diu'4)
-
,.
System Energy Resources, In / ATTN: Mr. O. D. Kingsley, J Vice President Nuclear Operations P. O. Box 23054 Jackson, MS 39205 Gentlemen:
SUBJECT: DOCKET NO. 50-416, CONFIRMATORY MEASUREMENT RESULTS, SUPPLEMENT TO INSPECTION REPORT NO 50-416/88-05 As part of the NRC Confirmatory Measurements Program, spiked liquid samples were sent on June 2, 1988, to your Grand Gulf Facility for selected radiochemical analyse We are in receipt of your analytical results transmitted to us by your letter dated August 2,1988, ard the comparison of your results to the known values are presented in Enclosure 1 for your information. The acceptance criteria for the comparisons are listed in Enclosure In our review of the data, comparative results were in agreement for H-3 and Fe-55 analyses and disagreement for Sr-89 and Sr-90 analyse These results were discussed with Mr. J. Lassiter of your Grand Gulf facility by telephone
, conversation on September 8, 1988. Mr. Lassiter requested that an additional liquid sample spiked with Sr-89 and Sr-90 be sent to your facility for reanalysis. The additional spiked sample is due to be shipped to your facility within the next 30 days and we request that the analyses be completed as soon as practicable but no later than 60 days from receipt of the sample. Results should be sent to: U.S. Nuclear Regulatory Commission, Attn: Mr. J. B. Kahl These results and any results from previous years pertaining to these analyses will be discussed at future NRC inspection
Sincerely,
'
Thomas R. Decker, Acting Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards Enclosures:
1. Confirmatory Measurement Cocparisons Criteria for Comparing Analytical Measurements Cc w/encls: (See page 2)
8910250452 681007 i PDR ADOCK 05000416 g 0 PEC ((
un
.*
, .
.
System Energy Resources, In cc w/encis:
IT.H.Cloninger.VicePresident, Nuclear Engineering and Support
/W.T.Cottle,GGNSSiteDirector dC R. Hutchinson, GGNS General Manager JJ. G. Cesare, Director, Nuclear Liccasing ;
JR. T. Lally, Manager of Quality ,%ssurance Middle South Services, In JR.B.McGehee, Esquire i
, Wise Carter, Child, Steen and Caraway l 1N. S. Reynolds, Esquire
/ Bishop, Cook, Purcell & Reynolds R. W. Jackson, Project Engineer State of Mississippi jbecw/encls:
1 NRC Resident Inspector l a(DRS.TechnicalAssistant
, ,
- L. Kintner, NRR l Document Control Desk
.
O
!
I l
.
'
!
.
II g fp I fth
- SA3amovitz /g9Kahle HDahje 10/p /88 // 10 7 /88 10/) /88
l
,_ _ .
_ _ , _ _ _ _ . ._ _ . _ _ -. _ _ _ _ _ - _ _ . - _
. _ - - - _ - .~_ ..
. .
'
.
f I
,
ENCLOSbRE 1 >
CONFIR!tATORY MEASUREMENT COMPARISONS OF H-3, Fe-55, Sr-89, AND Sr-90 ANALYSES ,
l FOR GRAND GULF NUCLEAR PLANT ON AUGUST 2, 1988 [
I ;
I Licensee NRC Ratio f Isotepe (uCi/ml) (uti/ml) Resolution (Licensee /NRC) r,omparisen [
!
.
H-3 1.92F-5 1.80t0.04E-5 45 1.07 Agreement l Fe-55 1.77E-5 1.7720.04E-5 44 1.00 Aarcement
-
!
Sr-89 7.78E-5 1.3610.04E-6 34 0.57 Disagreement
.,
Sr-90 5.2SE-6 8.1910.33E-6 25 0.04 Disagreement
.
I l
.
1 i i
!
.
a a i
, t
,
!
l l l
l a
' f l !
l i !
! !
'
l l
l
!
!
l i
f ,
! >
l
' .
, .
. . ,
..
.
ENCLOSURE 2 CRITERI A FOR CCMPARING ANALYTIC AL MEASUREVENTS This enclosure provides criteria for co? paring results of capability tests and verification reasurements. The criteria are basec on an empirical relat'.onsnip which ccmbines prior ex;erience and the accu'aey reeds of t*'s pecg'4*-
In these criteria, the jucgeent limits dercUng agreements of dist;*ee-ent between licensee and NRC results are variable. Inis variability is a function of the NRC's value relative to its associatec uncertainty, referred to in te,is program ss "Resolution"3 increases, the rarge of acceptable differenses tet.een Cor e'sely, pocrer the NRC and licensee values shculd te more restrictiv agree ent between NRC and licensee values must Oe considered acceptable as the resolution decrease For comparison purposes, a ratio 8 of the licersee value to the NRC value for each individual nuclide 15 cc?puted. This ratio is then evaluated for agree-eent based on the calculated resolution. Tre correspoecing resolutionValues and calculated ratics which denote agree ent are listed in Table 1 celc ,
outside of the agreement ratios for a selected nuclide are ccesicered in disagreetec ,
8 Resolution = NRC Reference Value fcr a Particular Nuclide Associated Lncertainty for the Vafue
-
-- ^'
8 Comparison Ratio s Licensee value :
NA7~AeTerence Value TABLE 1 Confirmatory Measurements Acceptance Criteria
,
Resolutions vs. Coeparison Ratio
,
j
[
l i
Cceparison Ratio for i Resolution Agreement
<4 0.4 - 2. 5 4-7 0.5 - 2. 0 8 - 15 0.6 - 1. 66 16 - 50 0.75 - 1, 33 51 - 200 0.80 - 1. 25
>200 0.S5 - 1. 18
1