| Start date | Site | Title | Topic |
---|
IR 05000461/2024003 | 5 November 2024 | Clinton | Integrated Inspection Report 05000461/2024003 | Offsite Dose Calculation Manual Stroke time Temporary Modification Functionality Assessment Job Performance Measure Operability Determination Maintenance Rule Program Fire Protection Program Downpower Overspeed trip |
IR 05000369/2024003 | 4 November 2024 | Mcguire McGuire | Integrated Inspection Report 05000369/2024003 and 05000370/2024003 | Boric Acid High Radiation Area Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Significance Determination Process Operability Determination Liquid penetrant Fire Protection Program Downpower |
IR 05000259/2024003 | 4 November 2024 | Browns Ferry | Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 | Commercial Grade Dedication Internal Flooding Enforcement Discretion Coatings Nondestructive Examination Temporary Modification Functionality Assessment FLEX Aging Management Corrosion bonding Significance Determination Process Annual Radioactive Effluent Release Report Scram Discharge Volume Integrated leak rate test Operability Determination Liquid penetrant Fire Protection Program |
IR 05000277/2024003 | 4 November 2024 | Peach Bottom | Integrated Inspection Report 05000277/2024003 and 05000278/2024003 | Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment FLEX Operability Determination Time Critical Operator Action Fire Protection Program Water rod |
ML24306A055 | 1 November 2024 | | NRC Revised Standard License Conditions-Ticket 81117-NRC - Conditions | Exemption Request Brachytherapy Depleted uranium |
ML24295A118 | 31 October 2024 | Point Beach | Suppl Env Audit Summary RCI and RAI Enclosure 2 | Sewage Treatment Plant License Renewal Subsequent License Renewal |
IR 05000458/2024003 | 31 October 2024 | River Bend | Integrated Inspection Report 05000458/2024003 | Packing leak Ultimate heat sink Mission time Offsite Dose Calculation Manual Internal Flooding Probabilistic Risk Assessment Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Annual Radioactive Effluent Release Report Operability Determination Maintenance Rule Program Fire Protection Program Control Room Habitability |
ML23032A443 | 30 October 2024 | | Rulemaking - Proposed Rule - Draft NRC Form 361S, Part 53 Plant Event Notification Worksheet Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors (Part 53) | Unanalyzed Condition Fitness for Duty |
IR 05000275/2024003 | 30 October 2024 | Diablo Canyon | Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001 | Non-Destructive Examination Internal Flooding Functionality Assessment FLEX Aging Management Annual Radioactive Effluent Release Report Process Control Program Operability Determination Fire Protection Program Downpower |
ML24302A321 | 28 October 2024 | Turkey Point | Miami Waterkeepers Reply in Support of Petition for Review of LBP-24-08 | |
ML24304B040 | 28 October 2024 | | Herring Pond Wampanoag Presentation; Dated 10/28/2024 | Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML24299A066 | 25 October 2024 | | OIG-DNFSB-25-M-01-The Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the Defense Nuclear Facilities Safety Board in Fiscal Year 2025 | COVID-19 |
ENS 57403 | 23 October 2024 06:00:00 | Casa Bonita | Lost Exit Signs | Moisture Density Gauge Exit Sign |
ML24283A166 | 23 October 2024 | Clinton | Enclosure 2 Clinton Audit Summary RCI and RAIs | Ultimate heat sink Grab sample Offsite Dose Calculation Manual Probabilistic Risk Assessment Zebra Mussel FLEX Tornado-Generated Missile License Renewal Exemption Request Subsequent License Renewal |
ML24284A010 | 22 October 2024 | Perry | Public Meetings to Receive Comments on the Draft Perry Plant EIS October 2 2024 Meeting Transcript | Offsite Dose Calculation Manual License Renewal Earthquake Pandemic Environmental Justice |
ML24291A116 | 22 October 2024 | | Stc 24 060 Annual Count of Active Radioactive Material Licensees in the National Materials Program | |
ML24284A007 | 22 October 2024 | Perry | Public Meetings to Receive Comments on the Draft Perry Plant EIS October 1, 2024, Meeting Transcript | Offsite Dose Calculation Manual License Renewal Earthquake Pandemic Environmental Justice |
ML24296A022 | 21 October 2024 | Perry | Comment (9) E-mail Regarding Perry Lr Draft EIS | Water Inventory Control Exemption Request Earthquake Coronavirus |
ML24250A095 | 21 October 2024 | | EA-23-140 - Glow Rhino, LLC - Federal Register Notice | Exemption Request |
ML24295A105 | 21 October 2024 | Perry | Comment (6) E-mail Regarding Perry Lr Draft EIS | Coatings License Renewal Subsequent License Renewal Earthquake Thermography |
ML24309A172 | 21 October 2024 | | News Release-24-077: NRC Reaches Agreement with Michigan Company Over Unlicensed Distribution of Tritium Products | |
ML24295A108 | 21 October 2024 | Perry | Comment (7) E-mail Regarding Perry Lr Draft EIS | License Renewal Subsequent License Renewal Environmental Justice |
ML24296A021 | 21 October 2024 | Perry | Comment (8) E-mail Regarding Perry Lr Draft EIS | Coatings License Renewal Subsequent License Renewal Earthquake Thermography |
ML24295A100 | 21 October 2024 | | Active Vendors, Active Products | Brachytherapy Troxler Exit Sign TheraSphere |
ML24296A024 | 21 October 2024 | Perry | Comment (10) E-mail Regarding Perry Lr Draft EIS | Annual Radioactive Effluent Release Report License Renewal Earthquake |
ML24292A199 | 18 October 2024 | Turkey Point | NRC Staff Answer Opposing Petition for Commission Review of LBP-24-8 | License Renewal Subsequent License Renewal |
ML24292A174 | 18 October 2024 | | FOIA-2025-000003 - Resp 1 - Final | |
ML24250A125 | 16 October 2024 | | EA-23-140 - Glow Rhino, LLC - Cover Letter and ADR Confirmatory Order | Exemption Request |
ML24284A203 | 16 October 2024 | Oyster Creek | Enclosure 2 Revised Pending Request for Additional Information | License Renewal |
ML24248A166 | 16 October 2024 | | EA-23-140 - Glow Rhino, LLC - ADR Confirmatory Order | Exemption Request |
ML24291A260 | 14 October 2024 | Oregon State University | Oregon State University Triga Reactor (Ostr), Submittal of Annual Report for the Period July 1, 2023 Through June 30, 2024 | Coatings Earthquake |
ML24295A103 | 14 October 2024 | Perry | Comment (5) E-mail Regarding Perry Lr Draft EIS | Earthquake |
SECY-24-0084, Weekly Information Report Week Ending October 4, 2024 | 10 October 2024 | | SECY-24-0084: Weekly Information Report Week Ending October 4, 2024 | Probabilistic Risk Assessment License Renewal Pre-application |
ML24284A193 | 10 October 2024 | Hermes | NRC-006B - NRC Staff Response to ACRS Letter (September 19, 2024) | |
ML24192A245 | 9 October 2024 | Monticello | Memo Meeting Summary Monticello Draft Environmental Impact Statement Monticello Public Meetings | Aging Management License Renewal Subsequent License Renewal |
ML24220A150 | 9 October 2024 | MIT Nuclear Research Reactor | Examination Report Letter No. 50-020/OL-24-02 Massachusetts Institute of Technology | Shutdown Margin Emergency Lighting Fuel cladding Power change Siren |
ML24269A047 | 4 October 2024 | Oyster Creek | Enclosure 2, Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Pending Request for Additional Information | License Renewal |
IR 05000361/2024005 | 4 October 2024 | San Onofre | NRC Inspection Report 05000361/2024005 and 05000362/2024005 | High Radiation Area Process Control Program |
ML24292A175 | 1 October 2024 | | FOIA-2025-000003 - Incoming Request 1567271 - Redacted | |
ML24292A176 | 1 October 2024 | | FOIA-2025-000003 - Incoming Request 1567281-Redacted | |
ML24253A094 | 23 September 2024 | Dresden | License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID L-2024-Sle-0002) (Docket Numbers: 50-237 and 50-249) | Internal Flooding Probabilistic Risk Assessment Met Tower Annual Radioactive Effluent Release Report Large early release frequency License Renewal Subsequent License Renewal Environmental Justice |
ML24267A298 | 23 September 2024 | Turkey Point | Miami Waterkeepers Petition for Review of the Atomic Safety and Licensing Boards Ruling in LBP-24-08 | Ultimate heat sink License Renewal Subsequent License Renewal |
ML24263A171 | 20 September 2024 | Palisades | Environmental Request for Additional Information | License Renewal Exemption Request Subsequent License Renewal Environmental Justice |
ML24207A083 | 19 September 2024 | | Response to Safety Evaluation of the Kairos Non-Power Reactor Hermes 2 Construction Permit Application | |
ML24241A151 | 18 September 2024 | Pilgrim | License Termination Plan Readiness Assessment Site Visit Summary - June 2024 | License Renewal Pre-application |
ML24256A003 | 17 September 2024 | | TLR-RES/DE/REB-2024-15 Storage and Transportation of Molten Salt Reactor Wastes Identification of Technical Info Needs and Safety Implications | Tornado Missile Coatings Tornado Generated Missile Stress corrosion cracking Earthquake Fuel cladding Uranium Hexafluoride |
ML24257A090 | 17 September 2024 | | 05 Osvaldo Pensado Swri September 2024 NRC Ai Public Workshop 09/17/2024 | High Radiation Area Tornado Missile Probabilistic Risk Assessment Nondestructive Examination Cyber Security Aging Management Machine learning Cyber attack Control Room Habitability |
ML24257A189 | 13 September 2024 | Reed College | Reed College, Submittal of Annual Report for the July 1, 2023 Through June 30, 2024 | Deep Dose Equivalent |
L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI | 13 September 2024 | Monticello | Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report License Renewal Subsequent License Renewal |
ENS 57331 | 12 September 2024 18:00:00 | Bridger Coal | Lost Tritium Exit Signs | Tritium Exit Sign Moisture Density Gauge Exit Sign |