| Start date | Site | Title | Topic |
---|
ML24312A315 | 5 November 2024 | Palo Verde | Independent Spent Fuel Storage Installation - Updated Annual Radioactive Effluent Release Report 2023 | Boric Acid Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
IR 05000237/2024003 | 29 October 2024 | Dresden | Integrated Inspection Report 05000237/2024003 and 05000249/2024003 | Ultimate heat sink Offsite Dose Calculation Manual Met Tower Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Fire Protection Program Coast down |
ML24303A282 | 29 October 2024 | Oyster Creek | License Termination Plan Supplemental Submittal for Technical Bases Documents | |
ML24284A196 | 16 October 2024 | Oyster Creek | Enclosure 1 Revised Request for Supplemental Information | |
ML24269A049 | 4 October 2024 | Oyster Creek | Enclosure 1, Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Request for Supplemental Information | |
ML24219A032 | 18 September 2024 | | Draft DUWP-ISG-03, Contamination Control, Radiological Survey, and Dose Modeling Considerations to Support License Termination at Sites with Environmental Discrete Radioactive Particle Contamination | High winds |
BW240053, Revised 2022 Annual Radioactive Effluent Release Report | 6 September 2024 | Braidwood | Revised 2022 Annual Radioactive Effluent Release Report | Packing leak Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML24207A089 | 9 August 2024 | 11006611 | Federal Register Notice - Perma-Fix Northwest Richland, Inc., - Export License Application XW033 | |
ML24214A061 | 1 August 2024 | Oyster Creek | Enclosure 15: ENG-OCS-014 Revision: 0, Basement Fill Model: Probabilistic Analysis for Embedded Pipes Scenario Oyster Creek Station, January 2024 | |
ML24214A069 | 1 August 2024 | Oyster Creek | Enclosure 18: Technical Basis Document No. 24-01-12-2888 Revision 1, Dose Contribution from Insignificant Radionuclides in the Oyster Creek Site-Specific Suite of Radiological Nuclides, February 14, 2024 | Tritium |
ML24214A070 | 1 August 2024 | Oyster Creek | Enclosure 19: Technical Basis Document, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Surveys at OCNGS Revision 0, February 14, 2024 | Coatings |
ML24214A078 | 1 August 2024 | Oyster Creek | Enclosure 22: Tsd 24-055, Basement Fill Model: Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways, Revision 0 | |
ENS 57234 | 18 July 2024 04:00:00 | State University Of New York (Suny) At Stony Brook | Lost Source | Moisture Density Gauge |
ML24214A079 | 8 July 2024 | Oyster Creek | Enclosure 23: Tsd 24-063, Basement Fill Model: Calculation of Dcglw/F Values Assuming Industrial Use Scenario Exposure Pathways, Revision 0 | |
ML24183A271 | 27 June 2024 | NS Savannah | N.S. Savannah, License Amendment Request No. LAR 2023-01, Response to Requests for Additional Information | Pandemic COVID-19 |
ML24161A001 | 9 June 2024 | Calvert Cliffs | Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
NUREG/CR-2907 Volume 27, Radioactive Effluents from Nuclear Power Plants: Annual Report 2021 | 31 May 2024 | | NUREG/CR-2907, Vol. 27, Radioactive Effluents from Nuclear Power Plants: Annual Report 2021 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Chernobyl |
L-2024-082, 2023 Annual Radiological Environmental Operating Report | 15 May 2024 | Turkey Point | 2023 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl Siren |
ML24141A080 | 15 May 2024 | San Onofre | (Songs), Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML24135A191 | 14 May 2024 | Monticello | 2023 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML24135A192 | 14 May 2024 | Monticello | 2022 Annual Radioactive Effluent Release Report - Errata | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
0CAN052401, – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 2023 | 13 May 2024 | Arkansas Nuclear | – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 2023 | Grab sample Offsite Dose Calculation Manual Met Tower Sewage Treatment Plant Annual Radiological Environmental Operating Report Chernobyl |
ML24130A236 | 9 May 2024 | Prairie Island | Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report | Offsite Dose Calculation Manual FLEX |
BVY 24-019, 2023 Radiological Environmental Operating Report | 9 May 2024 | Vermont Yankee | 2023 Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Chernobyl Power Uprate |
NG-24-0004, 2023 Annual Radiological Environmental Operating Report | 8 May 2024 | Duane Arnold | 2023 Annual Radiological Environmental Operating Report | Grab sample Sewage Treatment Plant Annual Radiological Environmental Operating Report |
BVY 24-018, 2023 Radiological Effluent Release Report | 5 May 2024 | Vermont Yankee | 2023 Radiological Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Annual Radiological Effluent Release Report |
RA24-011, 2023 Annual Radiological Environmental Operating Report | 3 May 2024 | LaSalle | 2023 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
BW240019, Annual Radioactive Effluent Release Report | 1 May 2024 | Braidwood | Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
L-2024-078, 2023 Annual Radioactive Effluent Release Report | 1 May 2024 | Seabrook | 2023 Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
ML24121A239 | 30 April 2024 | Callaway | Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML24122C652 | 30 April 2024 | Surry 07200002 07200055 | Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
ML24127A098 | 30 April 2024 | Dresden | Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Sewage Treatment Plant Annual Radiological Environmental Operating Report Process Control Program |
LG-24-053, Annual Radioactive Effluent Release Report No. 49 | 30 April 2024 | Limerick | Annual Radioactive Effluent Release Report No. 49 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Tritium |
LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR) | 30 April 2024 | Salem Hope Creek | 2023 Annual Radiological Environmental Operating Report (AREOR) | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Tritium |
3F0424-02, – 2023 Annual Radioactive Effluent Release Report | 29 April 2024 | Crystal River | – 2023 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
ML24120A255 | 29 April 2024 | Three Mile Island | Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl |
ML24120A040 | 29 April 2024 | Oyster Creek | Annual Radioactive Effluent Release Report for 2023 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Chernobyl |
AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report | 29 April 2024 | Cook | 2023 Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Downpower Unidentified leak |
SVP-24-029, Radioactive Effluent Release Report for 2023 | 26 April 2024 | Quad Cities | Radioactive Effluent Release Report for 2023 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Annual Radiological Effluent Release Report |
ML24116A119 | 25 April 2024 | Byron | 2023 Annual Radioactive Effluent Release Report (ARERR) | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
JAFP-24-0020, 2023 Annual Radioactive Effluent Release Report | 25 April 2024 | FitzPatrick | 2023 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
ML24116A208 | 24 April 2024 | Palo Verde | Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 | Boric Acid Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML24116A174 | 24 April 2024 | Millstone | Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
W3F1-2024-0016, Annual Radiological Environmental Operating Report (AREOR) - 2023 | 24 April 2024 | Waterford | Annual Radiological Environmental Operating Report (AREOR) - 2023 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
ML24116A205 | 23 April 2024 | Summer | Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
PNP 2024-009, Annual Radiological Environmental Operating Report | 23 April 2024 | Palisades | Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML24114A048 | 23 April 2024 | Sequoyah | Annual Radioactive Effluent Release Report for 2023 Monitoring Period | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Power change |
ML24113A095 | 22 April 2024 | Grand Gulf | Annual Radioactive Effluent Release Report for 2023 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Tritium |
TXX-2402, (CPNPP) - 2023 Annual Radiological Effluents Release Report | 18 April 2024 | Comanche Peak | (CPNPP) - 2023 Annual Radiological Effluents Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML24110A150 | 18 April 2024 | North Anna | Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |