IR 05000285/1988005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20148H665
| number = ML20151P429
| issue date = 03/16/1988
| issue date = 07/25/1988
| title = Confirms 880321 Enforcement Conference to Discuss Apparent Violations & Significant Radiation Program Weaknesses Noted in Insp Rept 50-285/88-05,per 880309 Telcon.Proposed Agenda Encl
| title = Ack Receipt of Providing Updated Status of Open Items Noted in Insp Rept 50-285/88-05 & Corrective Actions Taken Re Radiological Improvement Program
| author name = Callan L
| author name = Callan L
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| addressee name = Andrews R
| addressee name = Morris K
| addressee affiliation = OMAHA PUBLIC POWER DISTRICT
| addressee affiliation = OMAHA PUBLIC POWER DISTRICT
| docket = 05000285
| docket = 05000285
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = NUDOCS 8803300059
| document report number = NUDOCS 8808100029
| title reference date = 07-06-1988
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 3
| page count = 2
}}
}}


Line 18: Line 19:


=Text=
=Text=
{{#Wiki_filter:- .. .. . . . - . - - , . .. - ~ - . -- . - - . - - - -
{{#Wiki_filter:, .. . s
  '
'
  . '4 MAR l 61988 '
/ .
.In Reply Refer To:
JUL 2 51988
Docket: 50-285     ,
/
Omaha Public Power District-ATTN: R. L. Andrews, Division Manager-Nuclear Production 1623 Harney Street
In Reply Refer To:
' '
Docket: 50-285/88-05 Omaha Public Power District ATTN: Kenneth J. Morris, Division Manager Nuclear Operations 1623 Harney Street Omaha, Nebraska 68102 Gentlemen:
Omaha, Nebraska 68102
Thank you for your letter of July 6,1988, which provides an updated status of open items from NRC Inspection Report 50-285/88-05 and corrective actions you are taking as part of the radiological improvement progra Based on our review of your response, we have no further questions at this time on your proposed corrective act uns. We will review the implementation of these actions during a future inspection to ensere they have been effectiv Sincerel Ondd &b.::l B;.
,
L. J. CALLAN L. J. Callan, Director Division of Reactor Projects cc:
'
Fort Calhoun Station ATTN: W. G. Gates, Manager P.O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Es LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D. Kansas Radiation Control Program Director Nebraska Radiation Control Program Director bcc: (see next page)
Gentlemen:
IV:C: FRPS:RPB RPB C:DRP/B  P >
This is to confirm arrangements made with you during a telephone conversation wi.th Mr. R. L. Bangart on March 9, 1988, for an enforcement conference in the Region IV office in the Eighth Floor Conference Room at 10 a.m. on March 21, 198 At that time, we will discuss these apparent violations and significant radiation' protection program weaknesses identified in NRC Inspection Report 50-285/88-05. A proposed agenda is enclose Should you have any questions concerning these arrangements, we will be please to discuss the
REBaer/jt BMurray TFWesterman LJCa an 1/f/88  \ / /88 7 /oV88 7 /2 88 8808100029 G80725    i
      @
DR ADOCK 0500 85 g


Sincerely, L. J. Callan, Directo Division of Reactor Projects Enciosure:
.i . '
Proposed Agenda cc:
4 '
Fort Calhoun Station ATTN: W. G. Gates, Manager l P.O. Box 399
e Omaha Public Power District -2-bec to DMB (IE06)
! Fort Calhoun, Nebraska 68023 l- Harry H. Voigt, Esq.
 
i_
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D. Kansas Radiation Control Program Director l
Nebraska Radiation Control Program Director l    s (see next page)
    '
l bec:        ,
C:FRPS:RPSB
      '
        'Y RIV:FRPS: PSB  q C:RPSB ,'D : RSS C:DRP/B REBaer/j  BMurray  g
    '
LAYandeTit RLBangart TFWesterman A /
,
% ( /88  /h/{)/88  'y/\0 /88 ) /tb/88 3 //s /88 l 0:DRP y AE0 3 i
LJCallan HLSco t  8803300009 880316  /
ADOCK 0500 5  g d)/[L/88 g/p/88  {DR I
,
 
_ _ _ _ _ _ _
  , . N,
  .
Dmaha Public Power District -2-
.htc to DMB (IE 45)
bec distrib. by RIV:
bec distrib. by RIV:
R. D. Martin, RA Resident Inspector Lisa Shea, RM/ALF RPSB Section Chief, DRP/B MIS System RIV File DRP RSTS Operator DRS Inspector Section Chief L. A. Yandell R. L. Bangart R. E. Hall Project Engineer, DRP/B T. Bournia, NRR Project Inspector H. L. Scott J. Lieberman, D/0E
R. D. Martin, RA Resident Inspector Lisa Shea, RM/ALF RPB-DRSS Section Chief, DRP/B MIS system RIV File DRP RSTS Operator DRS Section Chief B. Murray R. L. Bangart R. E. Hall ProjectEngineer,DRP/B T. Bournia, NRR Project Manager t
 
. S,
-
.
PROPOSED AGENDA OMAHA PUBLIC POWER DISTRICT Meeting with NRC March 21, 1988Lat 10 Introduction and Purpose of Meeting R. L. Bangart II. Apparent Violations and Significant  B. Murray Radiation Protection Program Weaknesses R. E. Baer III. Discussion  OPPD Staff IV. Enforcement Policy  H. L. Scott Licensee Comments  OPPD Staff VI. Closing Comments  R. L. Bangart l
l l
l
l
_ -_ _
[_
}}
}}

Latest revision as of 01:55, 11 December 2021

Ack Receipt of Providing Updated Status of Open Items Noted in Insp Rept 50-285/88-05 & Corrective Actions Taken Re Radiological Improvement Program
ML20151P429
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/25/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 8808100029
Download: ML20151P429 (2)


Text

, .. . s

'

/ .

JUL 2 51988

/

In Reply Refer To:

Docket: 50-285/88-05 Omaha Public Power District ATTN: Kenneth J. Morris, Division Manager Nuclear Operations 1623 Harney Street Omaha, Nebraska 68102 Gentlemen:

Thank you for your letter of July 6,1988, which provides an updated status of open items from NRC Inspection Report 50-285/88-05 and corrective actions you are taking as part of the radiological improvement progra Based on our review of your response, we have no further questions at this time on your proposed corrective act uns. We will review the implementation of these actions during a future inspection to ensere they have been effectiv Sincerel Ondd &b.::l B;.

L. J. CALLAN L. J. Callan, Director Division of Reactor Projects cc:

Fort Calhoun Station ATTN: W. G. Gates, Manager P.O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Es LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D. Kansas Radiation Control Program Director Nebraska Radiation Control Program Director bcc: (see next page)

IV:C: FRPS:RPB RPB C:DRP/B P >

REBaer/jt BMurray TFWesterman LJCa an 1/f/88 \ / /88 7 /oV88 7 /2 88 8808100029 G80725 i

@

DR ADOCK 0500 85 g

.i . '

4 '

e Omaha Public Power District -2-bec to DMB (IE06)

bec distrib. by RIV:

R. D. Martin, RA Resident Inspector Lisa Shea, RM/ALF RPB-DRSS Section Chief, DRP/B MIS system RIV File DRP RSTS Operator DRS Section Chief B. Murray R. L. Bangart R. E. Hall ProjectEngineer,DRP/B T. Bournia, NRR Project Manager t

l

[_