October 12, 1990 Doc'ket No. 50-285 Mr. W. Gary Gates Division Manager - Nuclear Operations Omaha Public Power District 444 South 16th Street Mall Mail Stop BE/EP4 Omaha, Nebraska 68102-2247
Dear Mr. Gates:
SUBJECT:
FORT CALHOUN STATION, UNIT NO.1 - AMENDMENT NO.133 TO FACILITY OPERATING LICENSE NO. DPR-40 (TAC NO. 75858)
The Commission has issued the enclosed Amendment No.133 to Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No.1.
This amendment consists of changes to the Technical Specifications in response to your application dated January 26, 1990, as supplemented May 10, June 18, and August 2, 1990.
The amendment modifies the Technical Specifications to:
(1) Increase the refueling boron concentration from 1800 to 1900 ppm; (2) Suspend certain sampling during periods when the fuel has been removed from the reactor vessel; (3) Revise the storage requirements of the spent fuel pool Region 2; (4) Allow discharge of fuel assemblies from the core directly to Region 2 of the spent fuel pool; and (5) Delete the requirements to provide a fuel performance report at the end of each cycle.
A copy of our related Safety Evaluation is also enclosed.
A Notice of Issuance will be included in the Commission's next biweekly Federal Register notice, i
Sincerely, i
/s/
Anthony Bournia, Project Manager Project Directorate IV-1 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation l
l
Enclosures:
l 1.
Amendment No.133 to DPR-40 2.
Safety Evaluation l
cc w/ enclosures:
I See next page l
DISTRIBUTION:
dDocketJ11e NRC PDR Local PDR PD4-1 Reading B. Boger T. Quay L. Berry A. Bournia (2)
- I OGC
' ** ' y D. Hagan G. Hill (4)
ACRS (10)
Wanda Jones J. Calvo PD4-1 Plant File GPA/PA ARM /LFMB L. Constable, RIV 0FC :PD4-1/LA
- PD4-1/PM
- 0GC
- PD4-1/D (A) :
NAME :LBerry
- ABournia:
- TQuay l DATE :9 /lW90
- 9/p/90
.f /[90
\\ /k/90 0
OFFICIAL RECORD COPY q
Document Name:
FT. CALHOUN AMEND TAC 75858 l
l
- Q '0i 901025c>255 90101-2 PDR ADOCK 05000285 sh P
\\\\
u
i October 12, 1990 i
DocLet No,.~50-285 Mr. W. Gary Gates Division Manager - Nuclear Operations Omaha Public Power District 444 South 16th Street Mall Mail Stop 8E/EP4 r
i Omaha, Nebraska 68102-2247
+
Dear Mr. Gates:
SUBJECT:
FORT CALHOUN STATION, UNIT NO.1 - AMENDMENT NO.133 TO FACILITY OPERATING LICENSE NO. DPR-40 (TAC NO. 75858)
The Commission has issued the enclosed Amendment No.133 to Facility Operating l
License No. DPR-40 for the Fort Calhoun Station, Unit No. 1.
This amendment consists of changes to the Technical Specifications in response to your application dated January 26, 1990, as supplemented May 10, June 18, and August 2, 1990.
The amendment' modifies the Technical Specifications to:
(1) Increase the refueling buron concentration from 1800 to 1900 ppm; (2) Suspend certain sampling during periods when the fuel has been removed from the reactor vessel; (3) Revise the storage requirements of the spent fuel pool Region 2; (4) Allow discharge of fuel assemblies from the core directly to Region 2 of the spent _
fuel pool; and (5) Delete the requirements to provide a fuel performance report at the end of each cycle.
A copy of our related Safety Evaluation is also enclosed.
A Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/s/
l Anthony Bournia, Project Manager Project Directorate IV-1 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation 1
Enclosures:
1.
Amendment No.133 to DPR-40 2.
Safety Evaluation cc w/ enclosures:
See next page DISTRIBUTION:
Docket File NRC PDR Local PDR' PD4-1 Reading B. Boger T.-Quay L. Berry A. Bournia (2)
OGC D. Hagan G. Hill (4)
ACRS (10)
Wanda Jones J. Calvo PD4-1 Plant File GPA/PA ARM /LFMB L. Constable, RIV FC :PD4-1/LA
- PD4-1/PM
- 0GC
- PL4-1/D.(A) :
....:..o......
.:..... p...,
AME :LBetry
- ABournia:
- TQuay ATE :9 /lk90
- 9//1/90
.f/[90-D
~\\/W/0 OFFICIAL RECORD COPY Document Name:
FT. CALHOUN AMEND TAC 75858 i
[fp u suq(*,,
UNITED STATES i
-J.( 'g NUCLEAR REGULATORY COMMISSION j
(.....,/g CASHINGT ON. O. C. 20H6 October 12, 1990 Docket No. 50-285 f
i Mr. W. Gary Gates Division Manager - Nuclear Operations Omaha Public Power District 444 South 16th Street Mall Mail Stop BE/EP4 Omaha, Nebraska 68102-2247
Dear Mr. Gates:
SUBJECT:
FORT CALHOUN STATION, UNIT NO. 1 - AMENDMENT NO. 133 TO. FACILITY i
OPERATING LICENSE NO. OPR-40 (TAC NO. 75858)
The Commission has issued the enclosed Amendment No.133 to Facility Operating i
License No. DPR-40 for the Fort Calhoun Station, Unit No. 1.
This amendment consists of changes to the Technical Specifications in response to your application dated January 26, 1990, as supplemented May 10, June 18, and August 2, 1990.
The amendment modifies the Technical Specifications to:
(1) Increase the s'
refueling boron concentration from 1800 to 1900 ppm; (2) Suspend certain sampling during periods when the fuel has been removed from the reactor vessel; (3) Revise the storage requirements of the spent fuel pool Region 2; (4) Allow discharge of fuel assemblies from the core directly to Region 2 of the spent fuel pool; and (5) Delete the requirements to provide a fuel performance report at the end of each cycle.
A copy of our related Safety Evaluation is also enclosed.
A Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
f Sincerely, (Ladem 0 c,wv Anthony Bournia, Project-Manager Project Directorate IV-1 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosures:
1.
Amendment No.133 o DPR-40 t
2.
Safety Evaluation cc w/ enclosures:
See next page
]
.n,
s P.r. W. Gary Gates l
Omaha Public Power District Fort Calhoun Station, Unit No. 1 cc:
Harry H. Voigt, Esg.
I LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D.C.
20036 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 1
Mr. Raymond P. Mu111 kin, Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 309
't Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852
'J '
Regional Administrator, Region IV-l U.S. Nuclear Regulatory Commission t
l Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert. Director s
Division of Radiological Health Nebraska Departmeat of Health-301 Centennial Mall, South Post Office Box 95007 Lincoln, Nebraska 68509 Mr. T. L. Patterson, Manager l
fort Calhoun Station i
Post Office Box 399 Fort Calhoun, Nebraska 68023 l
l i
I i
F
?
.. -.