ML20217G233
| ML20217G233 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 10/14/1999 |
| From: | Good G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gambhir S OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20217G238 | List: |
| References | |
| 50-285-99-09, NUDOCS 9910210229 | |
| Download: ML20217G233 (4) | |
See also: IR 05000285/1999009
Text
_
T.
- 8%g
UNITED STATES
&
//
4
NUCLEAR REGULATORY COMMISSION
- &
?,
5
j
REGloN N
,
,o
611 RYAN PLAZA DRIVE, SUITE 400
- ,,,
ARUNGTON, TEXAS 760114064
October 14, 1999
S. K. Gambhir, Division Manager
Division Manager, Nuclear Operations
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399
Hwy. 75 - North of Fort Calhoun
Fort Calhoun, Nebraska 68023-0399
SUBJECT: NRC INSPECTION REPORT NO. 50-285/99-09
Dear Mr. Gambhir.
On September 17,1999, the NRC completed an inspection at your Fort Calhoun reactor
facility. The results of the inspection were discussed on September 17,1999, with Mr. Phelps
and other members of your staff at the completion of the inspection. The enclosed report
presents the results of this inspection.
The inspection was an examination of activities conducted under your license as they relate to
j
physical protection, compliance with the commission's rules and regulations, and with the
conditions of your license. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observation of activities, and interviews
with personnel. Specifically, this inspection focused on the implementation of your response to
contingency events involving physical protection of vital equipment. The inspectors also
reviewed the Protected Area Security Equipment Performance Index (Performance Indicator).
During this inspection, no safety significant issues were identified.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
3
\\
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
'
.
%.
C
u
' QCce
Gail M. Good, Chief
Plant Support Branch
Division of Reactor Safety
9910210229 991014
ADOCK 05000205
l
G
.
.
-
..
0,
l Omaha Public Power District
-2-
Docket No.:
50 285
License No.: ' DPR-40 -
- Enclosure:
,
- NRC Inspection Report No.
50-285/99-09-
' cc w/ enclosure:
Mark T. Frans,' Manager
Nuclear Licensing
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399
Hwy. 75 - North of Fort Calhoun
Fort Caihoun, Nebraska 68023-0399
James W. Chase, Division Manager
Nuclear Assessments
Fort Calhoun Station
P.O. Box 399
Fort Calhoun, Nebraska 68023
J. M. Solymossy, Manager - Fort Calhoun Station
Omaha Public Power District
Fort Calhoun Station FC-1-1 Plant
P.O. Box 399
Hwy. 75 - North of Fort Calhoun
Fort Calhoun, Nebraska 68023
Perry D. Robinson, Esq.
Winston & Strawn
1400 L. Street, N.W.
Washington, D.C. 20005-3502
Chairman -
- Washington County Board of Supervisors
Blair, Nebraska 68008
j
!
Cheryl K. Rogers, Program Manager
Nebraska Health and Human Services System
Division of Public Health Assurance
7~
Consumer Services Section
301 Centennial Mall, South
P.O. Box 95007-
Lincoln, NE 68509-5007
3,
,
.
.
Omaha Public Power District
-3-
E-Mail report to D. Lange (DJL)
.
E-Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
DISTRIBUTION:
DCD (IE04)
Regional Administrator
DRP Director
DRS Director
FC Resident inspector
Branch Chief (DRP/C)
Branch Chief (DRS/PSB)
Project Engineer (DRP/C)
Elaine McNeil(NRR/DIPM/lOLB/lRSS)(MS: 012E-11)-
Ellen Poteat, OCFO/LFARB, (MS: TWFN 9E-10)
RIV File
RITS Coordinator
i
DOCUMENT NAME: R:(FCS\\FC909RP.TWD.WPD
To receive copy of document. Indicate in box: *C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:PSB
RIV:PSB\\PSS
C:PSB\\SPSS
T
C:DRS\\PSB
.
C:DRP\\C
,
Peer Review 8
DWSchaefer:nhh
TWDexter
f%L/ GMGoodGDVCMarschal(T
10/04 /99
10/o't /99
10/0 l /99
\\ 10/hP/99
10/B /99
'
OFFICIAL RECORD COPY
a
4
Omaha Public Power District
-3-
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
DISTRIBUTION:
DCD (IE04)
Regional Administrator
DRP Director
DRS Director
FC Resident Inspector
Branch Chief (DRP/C)
Branch Chief (DRS/PSB)
Project Engineer (DRP/C)
Elaine McNeil (NRR/DIPM/lOLB/lRSS)(MS: 012E-11)
Ellen Poteat, OCFO/LFARB, (MS: TWFN 9E 10)
RIV File
RITS Coordinator
l
l
l
l
\\
\\
'
i
l
DOCUMENT NAME: R:\\_FCS\\FC909RP.TWD.WPD
To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:PSB
,l
RIV:PS3\\PSS
C:PSB\\SPSS \\ (\\ C:DRS\\PSB
.
C:DRP\\C l
Peer Review 8
DWSchaefer:nhj-
TWDexter
[ldll GMGood 6Mf7 CMarschallY
10/01 /99
10/04 /99
10/0)/99
\\
10/DP/99
10/13 /99
'
OFFICIAL RECORD COPY