Forwards Insp Rept 50-285/90-35 on 900729-0910.No Violations or Deviations Noted
ML20059M675
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/28/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gates W
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20059M676 List:
References
NUDOCS 9010050184
Download: ML20059M675 (2)


See also: IR 05000285/1990035

Text

. . .

, ,

,

w 1 .-

SEP 2 8;1990;

y

,

. IA R'eply Refer To: . [

.. -Docket: 50-285/90-35

l. y

L

Omaha Public Power District'

-ATTN: =W. G. Gates,. Division Mar,ager <

'

Nuclear Operations- 4

444 South 16th Street Mall a '

< Mail'Stop 8E/EP4'

Omaha, Nebraska 68102-2247 -i

Gentlemen:.

This refers to the . inspection conducted by Messrs. R. Mullikin and T. Reis' of i

this office during.the period July =29 through September 10,;1990, of-activities

authorized by NRC Operating License DPR-40. for.- the Fort Calhoun Station,Jand to-

'

the discussion of; our findings with you.and.other members of your-. staff at;the

conclusion of the. inspection..

Areas examined during the inspection; included: _ onsitelfoll'owup'of events,.

operational safety verification, and monthly-maintenance, surveillance,- .

_

.'

security, and. radiological protection observations. LWithin. these' areas,J the -  !

'

inspection consisted'of selective examination'of procedures and representative

records... interviews.with personnel', and observations by the inspectors. 1The.

inspection findings are. documented in the. enclosed inspection-. report. l

Within the scope of the inspection, no ' violations:or deviations:were identifie'd.  :

l

1'  :

We have also examined actions 1su have taken with regard to previouslyr

identified inspection findings. The stetus of. these items is identified 'in '

paragraph 8-of the enclosed report.

Should you .have any questions concerning this . inspection, we will be pleased to

discuss them with you.

Sincerely,

/6/

Samuel J. Collins,. Director i

Division ~of-Reactor Projects-

l. Enclosure: ,

Appendix - NRC Inspection Report

i~

50-285/90-35 4

t

cc w/ enclosure: (see next page)-

3  ? _

Nd

RIV:R SR F DRP/ -

C: RP/ D:DRPs

TRei ;n RPMul kin RVAz G table SJColl ns

9/2. 90 9/f/90 9/gT/ 0 $/90 9 4R/90

I.

g

l

.

<9010050184 900929 ,

DRADOCK0500g5

,

.,

, , - - # -

? Pi

y-

>

<

~ q,

,

l.

.

1; w . .. ..

-

..

'

Omaha.Public Power District -2-

(

f

' '

~LeBoeuf.-Lamb,'Leiby&MacRae

ATTN: Harry H. Voigt; Esq.

.

. 1333 New Hampshire Avenue, NW

'

L Washington, D.C. 20036 l

l

l- Washington County Board 3

'

of Supervisors

ATTN: ; Jack Jensen, Chairman '[

Blair,. Nebraska 68008: '

l

Combustion' Engineering,LInc.- i,!

ATTN: Charles B. Brinkman,' Manager'  !

Washington Nuclear Ope' rations

12300 Twinbrook~ Parkway, Suite 330 ,

Rockville, Maryland 20852 ,

1

I

Nebraska Department' of Health

ATTN: Harold Borchert, Director

Division.of: Radiological' Health- 1

301 Centennial Mall, South

P.O. Box 95007

Lincoln, Nebraska- 68509.

Fort Calhoun Station

ATTN: T. L. Patterson, Manager

'

P.O. Box 399 q

Fort Calhoun, Nebraska 68023

i

U.S. Nuclear Regulat' ry

o . Commission  : j

ATTN: -Resident. Inspector ^

,P.O. Box 309-

Fort Calhoun, Nebraska 68023

U.S. Nuclear Regulatory Commission

ATTN: Regional Administrator, Region IV

611 Ryan Plaza Drive, Suite 1000

-

Arlington, Texas 76011

.;

'

bec to DMB~(IE01)-

a'

bec distrib. by RIV:

.

  • R. D. Martin * Resident-Inspector'
  • DRSS-FRPS *

. Section Chief-(DRP/C)'

  • MIS System *RIV File . 1
  • DRP *RSTS Operator l
  • Project Engineer (DRP/C) Lisa'Shea, RM/ALF
  • A. Bournia, NRR Project Manager (MS: 13-D-18) *DRS

l

'

  • w/766

l

l

.

f

._