Forwards Insp Rept 50-285/90-35 on 900729-0910.No Violations or Deviations Noted
ML20059M675
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/28/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gates W
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20059M676 List:
References
NUDOCS 9010050184
Download: ML20059M675 (2)


See also: IR 05000285/1990035

Text

,

.

.

.

,

,

w

1 .-

SEP 2 8;1990;

y

. IA R'eply Refer To: .

[

,

.. -Docket:

50-285/90-35

l.

y

L

Omaha Public Power District'

-ATTN:

=W. G. Gates,. Division Mar,ager

<

'

Nuclear Operations-

4

444 South 16th Street Mall

a

Mail'Stop 8E/EP4'

'

<

Omaha, Nebraska 68102-2247

-i

Gentlemen:.

This refers to the . inspection conducted by Messrs. R. Mullikin and T. Reis' of

i

this office during.the period July =29 through September 10,;1990, of-activities

authorized by NRC Operating License DPR-40. for.- the Fort Calhoun Station,Jand to-

the discussion of; our findings with you.and.other members of your-. staff at;the

'

conclusion of the. inspection..

Areas examined during the inspection; included: _ onsitelfoll'owup'of events,.

_

operational safety verification, and monthly-maintenance, surveillance,- .

.'

security, and. radiological protection observations. LWithin. these' areas,J the -

!

'

inspection consisted'of selective examination'of procedures and representative

records... interviews.with personnel', and observations by the inspectors. 1The.

l

inspection findings are. documented in the. enclosed inspection-. report.

Within the scope of the inspection, no ' violations:or deviations:were identifie'd.

l

1'

We have also examined actions 1su have taken with regard to previouslyr

identified inspection findings. The stetus of. these items is identified 'in '

paragraph 8-of the enclosed report.

Should you .have any questions concerning this . inspection, we will be pleased to

discuss them with you.

Sincerely,

/6/

Samuel J. Collins,. Director

i

Division ~of-Reactor Projects-

l.

Enclosure:

,

Appendix - NRC Inspection Report

i~

50-285/90-35

4

t

cc w/ enclosure:

(see next page)-

?

_

Nd

3

RIV:R

SR

F

DRP/

C: RP/

D:DRPs

-

TRei ;n

RPMul

kin

RVAz

G

table

SJColl

ns

I. l

9/2. 90

9/f/90

9/gT/ 0

$/90

9 4R/90

g

.

<9010050184 900929

DRADOCK0500g5

,

,

,

...

, - -

-

.,

?

Pi

~ q,

>

<

l.

y-

.

,

1;

w

. ..

..

..

-

Omaha.Public Power District

-2-

'

(

f

'

'

~LeBoeuf.-Lamb,'Leiby&MacRae

ATTN: Harry H. Voigt; Esq.

.

.

1333 New Hampshire Avenue, NW

L

Washington, D.C.

20036

l

'

l

l-

Washington County Board

3

'

of Supervisors

ATTN: ; Jack Jensen, Chairman

'[

Blair,. Nebraska 68008:

'

l

Combustion' Engineering,LInc.-

i,!

ATTN: Charles B. Brinkman,' Manager'

!

Washington Nuclear Ope' rations

12300 Twinbrook~ Parkway, Suite 330

,

Rockville, Maryland 20852

1

,

I

Nebraska Department' of Health

ATTN: Harold Borchert, Director

Division.of: Radiological' Health-

1

301 Centennial Mall, South

P.O. Box 95007

Lincoln, Nebraska- 68509.

Fort Calhoun Station

ATTN:

T. L. Patterson, Manager

P.O. Box 399

'

q

Fort Calhoun, Nebraska 68023

i

U.S. Nuclear Regulat' ry . Commission

j

o

ATTN: -Resident. Inspector

^

,P.O. Box 309-

Fort Calhoun, Nebraska 68023

U.S. Nuclear Regulatory Commission

ATTN:

Regional Administrator, Region IV

611 Ryan Plaza Drive, Suite 1000

-

Arlington, Texas 76011

.;

bec to DMB~(IE01)-

'

a

bec distrib. by RIV:

'

.

  • R. D. Martin
  • Resident-Inspector'
  • DRSS-FRPS

. Section Chief-(DRP/C)'

  • MIS System
  • RIV File .

1

  • DRP
  • RSTS Operator
  • Project Engineer (DRP/C)

Lisa'Shea, RM/ALF

  • A. Bournia, NRR Project Manager (MS:

13-D-18)

  • DRS
  • w/766

'

.

f

._