ML20203F204

From kanterella
Jump to navigation Jump to search
Informs That During 990208 Telcon Between Mc Ralrick & J Pellet & T Stetka,Arrangements Were Made for Administration of Licensing Examinations at Fort Calhoun Station for Week of 991018
ML20203F204
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/11/1999
From: Pellet J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gambhir S
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 9902180092
Download: ML20203F204 (2)


Text

'

  1. " ** %, UNITED STATES y *; NUCLEAR REGULATORY COMMISSION

$ E REGloN Iv 611 RYAN PLAZA drive, SUITE 400 g ARLINGTON, TEXAS 76l . 8064 February 11,1999 S. K. Gambhir, Division Manager Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399

SUBJECT:

NRC INSPECTION REPORT 50-285/99-301

Dear Mr. Gambir:

In a telephone conversation on February 8,1999, between Messrs. C. Ralrick, of your staff, and John Pellet and Tom Stetka of the NRC Region IV Operations Branch, arrangements were made for the administration of licensing examinations at your Fort Calhoun Station during the week of October 18,1999.

The NRC will prepare the examinations based on the guidelines in Revision 8, of NUREG-1021,

" Operator Licensing Examination Standards for Power Reactors." In accordance with the guidelines in Attachment 5 of ES-201, your staff will be given the opportunity to review the draft examinations in the Region IV office during the week of September EO,1999.

To meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by March 31,1999. Any delay in receiving the requested reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. A validation of the final examination material will be conducted at your facility the week of September 27,1999.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. ,

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

v.

o

r..

a ,e Omaha Public Power District E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

I bec to DCD (lg)(IE42)

I bec distrib. by RIV:

~ Regional Administrator DRS-PSB DRP Director MIS System DRS Director RIV File Branch Chief (DRP/B) Branch Chief (DRP/TSS)

Project Engineer (DRP/B)

Resident inspector R. Gallo L. Hurley

. T. McKernon s

DOCUMENT NAME: R:\_FCS\FC93011t.tfs To receive copy of -r-:--- - - .;, Indicate in box: *C" = Copy without enclosures *E" = Copy with enclosures *N" = No copy RIV:SRE:OB . C:OB M TFStetka/imb d JLPellet op/

02/T/99 02/A/99 02/ /99 02/ /99 02/ /99 OFFICIAL RECORD COPY

! I a

s Omaha Public Power District i and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first I examination date. If the applications are not received at least 30 days before the examination l date, a postponement may be necessary. Signed applications certifying that all training has l been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of j Management and Budget, approval number 3150-0101, which expires on April 30,2000. 1 The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including' the time for reviewing instructions, gathering and maintaining the data needed, and reviewing the collection of information. Send comments on any aspect of this l collection of information, including suggestions for reducing the burden, to the information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, ,

DC 20555-0001, or by internet electronic mail at BJS1 @ NRC. GOV; and to the Desk Officer, j Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management j and Budget, Washington, DC 20503. l l

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. C. Ralrick has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Tom Stetka at (817) 860-8247 or Mr. John Pellet at (817) 860-8159.

Sincerely, I l yk {

' John L. Pellet, Chief Operations Branch Division of Reactor Safety Docket No.: 50-285 l.icense No.: DPR-40 cc: l Rick Westcott, Manager Training \\

Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

\oU i P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399

Omaha Public Power District Mark T. Frans, Manager Nuclear Licensing Omaha Public Power District Fort Cathcun Station FC-2-4 Adrn.

P.O. Box 399 Hwy. 75 - North of Fod Calhoun Fort Calhoun, Nebraska 68023-0399 James W. Chase, Division Manager Nuclear Assessments Fort Calhoun Station P.O. Box 399 Fort Calhoun, Nebraska 68023 J. M. Solymossy, Manager - Fort Calhoun Station Omaha Public Power District Fort Calhoun Statica FC-1-1 Plant P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023 Perry D. Robinson, Esq.

Winston & Strawn 1400 L. Street, N.W.

Washington, D.C. 20005-3502 l Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 l

l i

l