Forwards Insp Rept 50-285/89-32 on 890801-31.Noted Violations Not Being Cited to Encourage & Support Util self-identification & Correction of Problems.One Unresolved Item Discussed in Paragraph 7.a of Rept
ML20248C742
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/28/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20248C744 List:
References
NUDOCS 8910030563
Download: ML20248C742 (2)


See also: IR 05000285/1989032

Text

_ _ _ _ _

t

l

  • E

V *c

k

'.

SEP 281919

l

.

I

i

In Reply Refer To-

I

Docket: 50-285/89-32

l

l

1

l

Omaha Public Power District

ATTN: Mr. Kenneth J. Morris, Division Manager

,

Nuclear Operations

i

444 South 16th Street Mall

Omaha, Nebraska 68102-2247

Gentlemen:

This refers to the inspection conducted by Messrs. P. H. Harrell, T. Reis, and

R. P. Mullikin of this office during the period August 1-31, 1989, of

activities authorized by NRC Operating License DPR-40 for the Fort Calhoun

l

Station, and to the discussion of our findings with you and other members of

'

your staff at the conclusion of the inspection.

Areas examined during the inspection included licensee event report followup;

operational safety verification; plant tours; monthly maintenance observations;

monthly surveillance observations; security observations; radiological

protection observations; in-office review of periodic, special, and nonroutine

event reports; and general employee training. Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspectors. The

inspection findings are documented in the enclosed inspection report.

During this inspection period, it was found that certain of your activities

were in violation of NRC requirements. However, in accordance with Sections V.A

and V.G.1 of the NRC's enforcement policy, the violations are not being cited.

This action was taken to encourage and support your self-identification and

correction of problems. The noncited violations are discussed in

paragraphs 3.j, 5.a. and 5.c of the enclosed inspection report.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 3 of the enclosed report.

One unresolved item is discussed in paragraph 7.a of the enclosed inspection

report. This item discusses the lack of an evaluation to determine the effect

j

'

on continued plant operation of suspect electrical breakers supplying

Deaerating Pumps DW-46A and DW-46B.

l

f%

DRP A k '6

DRP/B

C:DRP/B

RIV:RI

SRI

TReis/nc

PHHarrell

RPMullikin

TFWesterman

JLMilhoan

9 q-/89

'7 /,,df/89

09/M(/89

09/N/89

g /g /89

/

D

W

W

Ji

/v

^

in oo m.oc.2 sgo m

XQ

gle

-r

e osvog:

e Lu

1

___________a

-

_-

- - _ _ - _ _ _ _ _ _ _

- _ _ _ _ _

-

_ _ - - . _ _ - - -

_

_ _ - - _ .

'.

.,

o

,

.

!

I

-Omaha Public Power District

-2-

i

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

odginalSigned$

!

Thomas P.GwyRR

James L. Milhoan, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-285/89-32

cc w/ enclosure:

G. R. Peterson, Manager

Fort Calhoun Station

P.O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, D.C.

20036

Nebraska Radiation ' Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

R.'D. Martin, RA

  • MIS System
  • SectionChief(DRP/B)
  • DRP
  • RIV File
  • Project Engineer (DRP/B)
  • RSTS Operator
  • A. Bournia, NRR Project Manager (MS 13-D-14)

Lisa Shea, RM/ALF

  • RRI

!

  • DRS
  • RPB-DRSS

l

G. Walker, 01/ Region III

]

S. O. Alexander, NRR/RVIB

!

i

  • w/766

l

l-

)

i

!

l

l

i

i