ML20212L957

From kanterella
Jump to navigation Jump to search
Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001
ML20212L957
Person / Time
Site: Fort Calhoun 
Issue date: 09/27/1999
From: Marschall C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gambhir S
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 9910080050
Download: ML20212L957 (4)


Text

,

tA*4 UNITED STATES g

y NUCLEAR REGULATORY COMMISSION

,E REGION IV 611 RYAN Pl AZA DRIVE, SulTE 400 g

ARLINGTON, TEXAS 76011-8064 SEP 2 71999 S. K. Gambhir, Division Manager Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399

SUBJECT:

FOLLOWUP INSPECTION - FORT CALHOUN STATION

Dear Mr. Gambhir:

During our review of Fort Calhoun Station's July 31,1999, performance indicator submittal, we noted that the Drill / Exercise Performance indicator had entered the white band. This indicated a level of licensee performance that warranted an increased regulatory response.

In response to this indicator, we discussed your performance in this area during a telephone conversation on September 15 with Mr. Sefic and other members of your staff. During that conversation, your staff presented an overview of the cause of entering the white band and your planned actions to address those causes. In addition, we plan to review your root cause determination using Inspection Procedure 95001, " Supplemental Inspection for One or Two White inputs in a Strategic Area." We also plan to verify the accuracy of the data reported for the Drill / Exercise Performance Indicator using baseline inspection Procedure 71151,

" Performance Indicator Verification." We intend to complete these inspections during the week ending October 1,1999. Subsequently, we will monitor the completion of your corrective actions through the baseline innection program and monitor the effectiveness of your corrective actions through observation of the Performance Indicators. We will discuss any findings with you at the conclusion of the inspections.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this ietter and its enclosure will be placed in the NRC Public Document Room (PDR).

Please contact me at (817) 860-8185 with any questions you may have.

Sincerely,

&S&

harles S. Marschall, Chief Project Branch C Division of Reactor Projects I

Docket No.: 50-285 License No.: DPR-40 l

9910000050 990927 I

PDR ADOCK 05000285 j

G PDR

h w-

~

b Omaha Public Power District '

2--

2 L

d L

p cc:

l

- Mark T. Frans, Manager ;

L

~

Nuclear Licensing -

' Omaha Public Power District.

1 Fort Calhoun Station FC-2-4 Adm.

P.O. Box 399 Hwy. 75 - North of Fort Calhoun -

Fort Calhoun, Nebraska 68023-0399 l

James W. Chase, Division Manager l

Nuclear Assessments Fort Calhoun Station P.O. Box 399 Fort Calhoun, Nebraska 68023 '

J. M. Solymossy, Manager - Fort Calhoun Station Omaha Public Power District

. Fort Calhoun Station FC-1-1 Plant P.O. Box 399.

Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023 -

)

Perry D. Robinson, Esq.

Winston & Strawn 1400 L Street, N.W.

Washington, D.C.' 20005-3502 -

l Chairman Washington County Board of Supervisors Washington County Courthouse P.O. Box 466 ~

Blair, Nebraska 68008 l

l Cheryl K. Rogers, Program Manager Nebraska Health and Human Services System Division of Public Health Assurance Consumer Services Section

. 301 Centennial Mall, South l

P.O. Box 95007 l --

Lincoln, Nebraska 68509-5007 l

l 4

b

)

j;

~,,

Omaha Public Power District SEP 2 71999 g

L bec to DCD (IE01) bec distrib. by RIV:

Regional Administrator RIV File DRP Director RITS Coordinator DRS Director.

Resident inspector Branch Chief (DRP/C)

Branch Chief (DRPfrSS)

Project Engineer (DRP/C) l DOCUMENT NAME: S:\\DRP\\DRPDIR\\FCS Followup To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures *N" = No copy

]

RIV:C:DRP/C C:DRS/PS D:DRP Signature l

CSMarschall;dfGM GMGoodW KEBrockmar$\\

CSMarschall 9/7)(/99 9/f(/99

\\9/d/99 9/ d /99 OFFICIAL RECORD COPY l

i 1

]

p.

n

(

t,

.,j_. _.

l

-Omaha Public Power District

SEP 2 71999 918sssesgeogg bec distrib. by RIV:

' Regional Administrator RIV File DRP Director RITS Coordinator DRS Director Resident inspector Branch Chief (DRP/C)

Branch Chief (DRP/TSS)

Project Engineer (DRP/C) r 1

080001 l

DOCUMENT NAME: S:\\DRP\\DRPDIR\\FCS Followup To receive copy of document, Indicate in box: "C" = Copy without enclosures *E' = Copy with enclosures "N" = No copy RIV:C:DRP/C C:DRS/PS D:DRP Signature l l

CSMarschall;dfGF\\ GMGoodW KEBrockmar$

CSMarschall 9/2,i/99 9/g(/99

\\9/d/99 9/ d /99 OFFICIAL RECORD COPY J

. - -